Airbus SAS BAC 1-11 200 Series Airworthiness Directives

Browse ADs indexed for this model. Applicability depends on your aircraft configuration.

Check your aircraft configuration

75-26-11

final rule

Airworthiness Directives; BRITISH AIRCRAFT CORPORATION Models BAC 1- 11 200 and 400 Series Airplanes

Unsafe Condition: Hazardous arcing at the H.F. antenna tuning unit connector post in the vicinity of the oxygen system.

Effective: Jan 14, 1976 Category: aircraft Compliance: Within the next 25 hours' time in service after the effective date of this AD

75-23-05

final rule

Airworthiness Directives; BRITISH AIRCRAFT CORPORATION Model BAC 1-11 200 and 400 Series Airplanes

Unsafe Condition: Failure of aileron trim tab connecting rods due to cracks, bowing, or contact with adjacent structure.

Effective: Nov 19, 1975 Category: aircraft Compliance: within the next ten hours' time in service after the effective date of this AD
Technical illustration of an aircraft flight control surface and actuator
Problem area Flight controls

75-16-12

final rule

Airworthiness Directives; BRITISH AIRCRAFT CORPORATION Model BAC 1-11 200 and 400 Series Airplanes

Unsafe Condition: Overheat damage of the rear fuselage tail cone structure due to fire resulting from an APU or jet pipe assembly failure.

Effective: Aug 28, 1975 Category: aircraft Compliance: within the next 25 APU hours' time in service after the effective date of this AD, and thereafter...

75-16-14

final rule

Airworthiness Directives; BRITISH AIRCRAFT CORPORATION Model BAC 1-11, 200 and 400 Series Airplanes

Unsafe Condition: Static inverter failure which could result in the loss of the A.C. emergency power supply to essential flight instruments.

Effective: Aug 28, 1975 Category: aircraft Compliance: within the next 500 hours' time in service after the effective date of this AD

75-16-15

final rule

Airworthiness Directives; BRITISH AIRCRAFT CORPORATION Model BAC 1-11, 200 and 400 Series Airplanes

Unsafe Condition: Failure of the handbrake control valve filter housing, P/N ACM.23102, due to hydraulic fluid leakage and distortion.

Effective: Aug 28, 1975 Category: aircraft Compliance: Prior to the accumulation of 7,000 total landings, or within the next 25 landings after the effec...

75-16-07

final rule

Airworthiness Directives; BRITISH AIRCRAFT CORPORATION Model BAC 1-11, 200 and 400 Series Airplanes

Unsafe Condition: Loose ring nuts in the flap primary transmission system and broken ring nut lock wires could lead to flap malfunction or failure.

Effective: Aug 27, 1975 Category: aircraft Compliance: Within the next 1,000 hours' time in service after the effective date of this AD, unless already ...

71-20-01

final rule

Airworthiness Directives; BRITISH AIRCRAFT CORPORATION Model BAC 1-11 200 and 400 Series Airplanes

Unsafe Condition: Possible failures of the flap system secondary drive shafts at the trackside support bearing assemblies.

Effective: Aug 25, 1975 Category: aircraft Compliance: Within the next 1,000 landings after the effective date of this AD, or before the accumulation of...

72-06-01

final rule

Airworthiness Directives; BRITISH AIRCRAFT CORPORATION Model BAC 1-11 200 and 400 Series Airplanes

Unsafe Condition: Failures of the flap forward inboard pick-up fitting assemblies (six per airplane) due to spigot failure in the pick-up fitting assembly.

Effective: Apr 6, 1972 Category: aircraft Compliance: Compliance required as indicated in the AD, with inspections due within specified landing counts ...

71-15-02

final rule

Airworthiness Directives; BRITISH AIRCRAFT CORPORATION Model BAC 1-11 200 and 400 Series Airplanes

Unsafe Condition: Overheating of the materials in and around the flight deck center roof panel 'E' area could result in fire.

Effective: Dec 21, 1971 Category: aircraft Compliance: within the next 2,300 hours' time in service after the effective date of this AD

71-20-07

final rule

Airworthiness Directives; BRITISH AIRCRAFT CORPORATION Model BAC 1-11 200 and 400 Series Airplanes

Unsafe Condition: Failure of the landing gear selector lever switch to warn the pilot when the lever is not fully engaged in a gated position could result in unintended gear retraction or extension.

Effective: Oct 22, 1971 Category: aircraft Compliance: within the next 2,000 hours' time in service after the effective date of this AD
Technical illustration of an aircraft landing gear and wheel assembly
Problem area Landing gear

71-19-05

final rule

Airworthiness Directives; BRITISH AIRCRAFT CORPORATION Model BAC 1- 11 200 Series Airplanes

Unsafe Condition: Failure of the saddle bracket structure located at Station 575 in the main landing gear bay.

Effective: Sep 20, 1971 Category: aircraft Compliance: Within the next 25 landings after the effective date of this AD, unless already accomplished with...
Technical illustration of an aircraft landing gear and wheel assembly
Problem area Landing gear

71-16-05

final rule

Airworthiness Directives; BRITISH AIRCRAFT CORPORATION Model BAC 1- 11 200 and 400 Series Airplanes

Unsafe Condition: Hazardous drift in the Voltage Sensing Unit due to transistor T.1 in the Rotax Voltage Sensing Unit Type U.3619 or U.3619/1.

Effective: Jul 29, 1971 Category: aircraft Compliance: within the next 800 hours' time in service after the effective date of this AD

70-15-09

final rule

Airworthiness Directives; BRITISH AIRCRAFT CORPORATION Model BAC 1-11 200 and 400 Series Airplanes

Unsafe Condition: The existing 200 ampere fuse in the APU starter motor circuit may fail due to overload, and airplanes without BAC 1-11 Modification PM2518 may have inadequate APU starting system protection.

Effective: Aug 16, 1970 Category: aircraft Compliance: within the next 750 hours' time in service after the effective date of this AD

70-15-10

final rule

Airworthiness Directives; BRITISH AIRCRAFT CORPORATION Model BAC 1-11 200 and 400 Series Airplanes

Unsafe Condition: Penetration of compressor wheel shroud fragments through the air conditioning system cold air unit compressor scrolls in the event of compressor failure.

Effective: Aug 16, 1970 Category: aircraft Compliance: within the next 1,200 hours' time in service after the effective date of this AD

70-13-01

final rule

Airworthiness Directives; BRITISH AIRCRAFT CORPORATION Models BAC 1-11 200 and 400 Series Airplanes

Unsafe Condition: Overheating of the razor socket supply transformer P/N RD.10590 when a non-compatible electrical appliance is connected into a razor socket.

Effective: Jul 13, 1970 Category: aircraft Compliance: within the next 1500 hours' time in service after the effective date of this AD

69-25-09

final rule

Airworthiness Directives; BRITISH AIRCRAFT CORPORATION Model BAC 1-11 Airplanes

Unsafe Condition: The passenger oxygen system shut-off valve may not be maintained in the OFF position during normal operations, and the center roof panel 'E' may exhibit overheating, damage, or fouls, leading to po...

Effective: Mar 31, 1970 Category: aircraft Compliance: within the next 75 hours' time in service after the effective date of this AD (for paragraph (a))...

70-05-01

final rule

Airworthiness Directives; BRITISH AIRCRAFT CORPORATION Model BAC 1- 11 200 and 400 Series Airplanes

Unsafe Condition: False indication of a retracted flap position which could result in a failure of the flap structure in flight

Effective: Mar 23, 1970 Category: aircraft Compliance: within the next 1500 hours' time in service after the effective date of this AD

67-28-02

final rule

Airworthiness Directives; BRITISH AIRCRAFT Model BAC 1-11, 200 and 400 Series Airplanes

Unsafe Condition: Deterioration of the secondary flap transmission system due to corrosion in the magnesium bearing housings.

Effective: Jan 11, 1970 Category: aircraft Compliance: Within the next 250 hours' time in service after the effective date for airplanes with 2,750+ hou...

67-22-04

final rule

Airworthiness Directives; BRITISH AIRCRAFT Model BAC 1-11 200 and 400 Series Airplanes

Unsafe Condition: Failures of joints in the secondary flap transmission shafts could result in loss of flap control.

Effective: Jan 11, 1970 Category: aircraft Compliance: within the next 150 hours' time in service after the effective date of this AD

69-22-01

final rule

Airworthiness Directives; BRITISH AIRCRAFT CORPORATION Models BAC 1-11 200 and 400 Series Airplanes

Unsafe Condition: Malfunction of the ventral stairway door due to looseness or insecurity of the starboard hinge bolt (M.M. 52-10).

Effective: Nov 17, 1969 Category: aircraft Compliance: Within the next 100 hours' time in service after the effective date of this AD unless already acc...

69-14-03

final rule

Airworthiness Directives; BRITISH AIRCRAFT CORPORATION Model BAC 1-11 200 and 400 Series Airplanes

Unsafe Condition: Failure of the windshield heating circuit

Effective: Aug 10, 1969 Category: aircraft Compliance: within the next 1,500 hours' time in service after the effective date of this AD

69-08-04

final rule

Airworthiness Directives; BRITISH AIRCRAFT CORPORATION Model BAC 1-11, 203/AE and 204/AF Airplanes

Unsafe Condition: Fuel leakage into the wing center section torque box area

Effective: May 11, 1969 Category: aircraft Compliance: within the next 2500 hours' time in service after the effective date of this AD

69-08-05

final rule

Airworthiness Directives; BRITISH AIRCRAFT CORPORATION Model BAC 1-11, 200 and 400 Series Airplanes

Unsafe Condition: Failure of the shear pin installed within the Elevator Centralizing Spring Pots (Part Numbers AB34-A881, A3003, A3017, A3019, and A3021) could result in loss of elevator control.

Effective: May 11, 1969 Category: aircraft Compliance: within the next 1500 hours' time in service after the effective date of this AD
Technical illustration of an aircraft flight control surface and actuator
Problem area Flight controls

69-07-01

final rule

Airworthiness Directives; BRITISH AIRCRAFT CORPORATION Model BAC 1-11, 200, and 400 Series Airplanes

Unsafe Condition: Interference between the flap rear pick up fitting and the flap link assembly could occur, which may lead to structural failure or operational malfunction of the flap system.

Effective: Mar 27, 1969 Category: aircraft Compliance: Within the next 160 hours' time in service after the effective date of this AD (for clearance ins...

69-03-03

final rule

Airworthiness Directives; BRITISH AIRCRAFT CORPORATION Model BAC 1-11, 200 and 400 Series Airplanes

Unsafe Condition: Possible jamming of aileron controls due to the aileron tab filler and modification plate assembly block (Part Number AB11/A1303 or AK11/A499) coming loose and fouling between the aileron and the w...

Effective: Feb 14, 1969 Category: aircraft Compliance: Within 75 hours' time in service after the effective date and thereafter at intervals not to exce...
Technical illustration of an aircraft flight control surface and actuator
Problem area Flight controls