AD 69-08-05
Applicability
| Type | Manufacturer | Model | Details |
|---|---|---|---|
| aircraft | Airbus SAS | BAC 1-11 200 Series | Airworthiness Directives; BRITISH AIRCRAFT CORPORATION Model BAC 1-11, 200 and 400 Series Airplanes |
| aircraft | Airbus SAS | BAC 1-11 400 Series | Airworthiness Directives; BRITISH AIRCRAFT CORPORATION Model BAC 1-11, 200 and 400 Series Airplanes |
Unsafe Condition
Failure of the shear pin installed within the Elevator Centralizing Spring Pots (Part Numbers AB34-A881, A3003, A3017, A3019, and A3021) could result in loss of elevator control.
AI-generated summary from the source AD text. Verify against the official source before acting.
Required Actions
Remove and disassemble the spring pots from the right and left elevators, and modify in accordance with BAC 1-11 Service Bulletin No. 27-A-PM 3536 or later ARB-approved issue, or FAA-approved equivalent.
AI-generated summary from the source AD text. Verify against the official source before acting.
Compliance Time
within the next 1500 hours' time in service after the effective date of this AD
AI-generated summary from the source AD text. Verify against the official source before acting.
Affected Aircraft
BRITISH AIRCRAFT CORPORATION Model BAC 1-11, 200 and 400 Series airplanes
AI-generated summary from the source AD text. Verify against the official source before acting.
Source: Official FAA Source ↗
Retrieved: Apr 8, 2026
Rights: U.S. Government Public Domain
This site is not affiliated with or endorsed by the FAA. Always verify with official sources.