AD 69-08-05

final rule
Data completeness: 70%

Airworthiness Directives; BRITISH AIRCRAFT CORPORATION Model BAC 1-11, 200 and 400 Series Airplanes

AD Number
69-08-05
Status
final_rule
Effective Date
Product Category
aircraft
Docket
Unknown
FR Citation
This information is not available.

Applicability

TypeManufacturerModelDetails
aircraft Airbus SAS BAC 1-11 200 Series Airworthiness Directives; BRITISH AIRCRAFT CORPORATION Model BAC 1-11, 200 and 400 Series Airplanes
aircraft Airbus SAS BAC 1-11 400 Series Airworthiness Directives; BRITISH AIRCRAFT CORPORATION Model BAC 1-11, 200 and 400 Series Airplanes

Unsafe Condition

Failure of the shear pin installed within the Elevator Centralizing Spring Pots (Part Numbers AB34-A881, A3003, A3017, A3019, and A3021) could result in loss of elevator control.

AI-generated summary from the source AD text. Verify against the official source before acting.

Required Actions

Remove and disassemble the spring pots from the right and left elevators, and modify in accordance with BAC 1-11 Service Bulletin No. 27-A-PM 3536 or later ARB-approved issue, or FAA-approved equivalent.

AI-generated summary from the source AD text. Verify against the official source before acting.

Compliance Time

within the next 1500 hours' time in service after the effective date of this AD

AI-generated summary from the source AD text. Verify against the official source before acting.

Affected Aircraft

BRITISH AIRCRAFT CORPORATION Model BAC 1-11, 200 and 400 Series airplanes

AI-generated summary from the source AD text. Verify against the official source before acting.

Source: Official FAA Source ↗

Retrieved: Apr 8, 2026

Rights: U.S. Government Public Domain

This site is not affiliated with or endorsed by the FAA. Always verify with official sources.