BAE Systems (Operations) Limited BAe 146-100A Airworthiness Directives

Browse ADs indexed for this model. Applicability depends on your aircraft configuration.

Check your aircraft configuration

2000-05-27

final rule

Airworthiness Directives; British Aerospace Model BAe 146-100A, -200A, and -300A Series Airplanes

Unsafe Condition: Fatigue cracking of the fuselage skin in the vicinity of frame 29 between stringers 12 and 13, which could result in reduced structural integrity of the airplane.

Effective: Apr 24, 2000 Category: aircraft Compliance: Inspect prior to the accumulation of specified flight cycles (e.g., 11,600; 14,500; 12,600; etc.)...
Technical illustration of a riveted aircraft structural panel and frame
Problem area Airframe structure

99-23-11

final rule

Airworthiness Directives; British Aerospace Model BAe 146 and Avro 146-RJ Series Airplanes

Unsafe Condition: Damage to the fuel feed pipe, which could result in fuel leaks and an increased potential for fire on the airplane.

Effective: Dec 20, 1999 Category: aircraft Compliance: Within 30 days after the effective date of this AD

99-22-11

final rule

Airworthiness Directives; British Aerospace Model BAe 146 and Avro 146-RJ Series Airplanes

Unsafe Condition: Failure of the roller sub-assemblies in both the main landing gear (MLG) door lock and the MLG uplock, which could result in failure of the MLG to retract and lock after takeoff, or to deploy prope...

Effective: Dec 2, 1999 Category: aircraft Compliance: Varies based on total flight cycles as of 12/02/1999: 6, 12, or 18 months after effective date, o...
Technical illustration of an aircraft landing gear and wheel assembly
Problem area Landing gear

98-15-08

final rule

Airworthiness Directives; British Aerospace Model BAe 146 and Model Avro 146-RJ Series Airplanes

Unsafe Condition: Stress corrosion cracking in the wing skin, caused by the use of 7150-T651 aluminum material from a discrepant production lot with incorrect thickness, could result in reduced structural integrity ...

Effective: Aug 20, 1998 Category: aircraft Compliance: Within 4 months after the effective date of this AD; and thereafter at intervals not to exceed 4,...

98-11-29

final rule

Airworthiness Directives; British Aerospace Models BAe 146 and Avro 146-RJ Series Airplanes

Unsafe Condition: Corrosion of the threads of the eyebolt and piston rod on the retraction jack of the main landing gear (MLG), which may cause the eyebolt to detach from the jack, and consequent unrestrained MLG de...

Effective: Jul 8, 1998 Category: aircraft Compliance: Within the specified timeframes based on MLG retraction jack age: (1) 2 years after the effective...
Technical illustration of an aircraft landing gear and wheel assembly
Problem area Landing gear

98-07-06

final rule

Airworthiness Directives; British Aerospace Model BAe 146-100A, -200A, and -300A, and Model Avro 146-RJ Series Airplanes

Unsafe Condition: Reduced structural integrity of the stabilizer attachment brackets due to intergranular corrosion, which could result in reduced controllability of the airplane.

Effective: May 4, 1998 Category: aircraft Compliance: Within 20, 32, or 44 months after May 4, 1998, depending on the airplane's constructor number as ...

97-06-12

final rule

Airworthiness Directives; British Aerospace Models BAe 146 and Avro 146-RJ Series Airplanes

Unsafe Condition: Failure of the main fitting of the nose landing gear (NLG), which could lead to collapse of the NLG during landing.

Effective: Apr 21, 1997 Category: aircraft Compliance: Prior to the accumulation of 16,000 total landings or within 30 days after the effective date of ...
Technical illustration of an aircraft landing gear and wheel assembly
Problem area Landing gear

97-04-17

final rule

Airworthiness Directives; British Aerospace Models BAe 146 and Model Avro 146-RJ Series Airplanes

Unsafe Condition: Leakage of hydraulic fluid from the lock jack assemblies of the main landing gear (MLG) due to a manufacturing forging defect that extends through the wall of the lock jack assembly. This leakage, ...

Effective: Mar 31, 1997 Category: aircraft Compliance: Within 30 days after the effective date of this AD, and within 6 months after the effective date ...
Technical illustration of an aircraft landing gear and wheel assembly
Problem area Landing gear

97-01-07

final rule

Airworthiness Directives; British Aerospace Model BAe 146 and Avro 146-RJ Series Airplanes

Unsafe Condition: Water and ice accumulation at the trailing edge of the left and right elevators can cause elevator unbalance, leading to oscillation or flutter which may reduce controllability or result in loss of...

Effective: Feb 13, 1997 Category: aircraft Compliance: Within 12 months after the effective date of this AD (February 13, 1997).
Technical illustration of an aircraft flight control surface and actuator
Problem area Flight controls

96-23-08

final rule

Airworthiness Directives; British Aerospace Model BAe 146 Series Airplanes and Model Avro 146-RJ Series Airplanes

Unsafe Condition: The inability of the windshear computer to detect the true flap position due to electrical circuit integrity issues between the windshear computer and flap position sensor, which could result in er...

Effective: Dec 19, 1996 Category: aircraft Compliance: Within 300 landings or 60 days after the effective date of this AD, whichever occurs first; repla...

96-22-05

final rule

Airworthiness Directives; British Aerospace Model BAe 146-100A, -200A, and -300A Series Airplanes, and Model Avro 146-RJ70A, -RJ85A, and RJ-100A Airplanes

Unsafe Condition: Loss of the emergency electrical system due to insufficient capacity of the No. 2 battery to power the electrical system caused by the absence of a two-way link between terminals 'D8' and 'D9' on D...

Effective: Dec 11, 1996 Category: aircraft Compliance: Within 3 months after the effective date of this AD
Technical illustration of an aircraft electrical generator and wiring assembly
Problem area Electrical system

96-21-09

final rule

Airworthiness Directives; British Aerospace Models BAe 146 and Model Avro 146-RJ Series Airplanes

Unsafe Condition: Failure of the direction link subassembly of the main landing gear (MLG) due to corrosion, which could result in reduced directional control of the airplane during landing.

Effective: Nov 29, 1996 Category: aircraft Compliance: Prior to the later of: (a) 12,000 total landings or 5 years since MLG manufacture/overhaul (which...
Technical illustration of an aircraft landing gear and wheel assembly
Problem area Landing gear

95-23-08

final rule

Airworthiness Directives; Avro Model BAe 146 Series Airplanes

Unsafe Condition: Cracking and damage of the fastener holes in the butt strap at rib 2 at the lower surface of the right-hand wing due to reduced edge margin between fastener hole centers and the edge of the butt st...

Effective: Dec 1, 1995 Category: aircraft Compliance: Before further flight

95-23-06

final rule

Airworthiness Directives; British Aerospace Model BAe 146-100A, -200A, and -300A Airplanes and Model Avro 146-RJ70A, -RJ85A, and RJ-100A Airplanes

Unsafe Condition: Cracking due to leakage of hot exhaust gases in the forward face of the central panel of the forward firewall of the auxiliary power unit (APU) bay could damage the wiring to the APU fire bottle, r...

Effective: Nov 29, 1995 Category: aircraft Compliance: within 14 days after crack detection
Technical illustration of an aircraft electrical generator and wiring assembly
Problem area Electrical system

95-21-13

final rule

Airworthiness Directives; British Aerospace Model BAe 146 and Model Avro 146-RJ Series Airplanes

Unsafe Condition: Corrosion on an aileron tab bracket between the two tab drive flanges in the area of the two attachment bolts resulted in cracking of the bracket flanges at their base, which could lead to failure ...

Effective: Nov 2, 1995 Category: aircraft Compliance: Within 14 days after the effective date of this AD
Technical illustration of an aircraft flight control surface and actuator
Problem area Flight controls

95-19-05

final rule

Airworthiness Directives; British Aerospace Model BAe 146-100A and -200A Airplanes

Unsafe Condition: Failure of lift spoilers to deploy on landing may not provide flight crew indication, potentially causing airplane overrun during landing.

Effective: Oct 20, 1995 Category: aircraft Compliance: Within 18 months after the effective date of this AD

95-19-13

final rule

Airworthiness Directives; British Aerospace Model BAe 146-100A, -200A, and -300A Airplanes

Unsafe Condition: Fatigue cracking in the web and inboard flange of fuselage frame 29.

Effective: Oct 20, 1995 Category: aircraft Compliance: Within 6 months after October 20, 1995, or prior to accumulating 30,000 (BAe 146-100A), 24,000 (B...
Technical illustration of a riveted aircraft structural panel and frame
Problem area Airframe structure

95-17-13

final rule

Airworthiness Directives; British Aerospace Model BAe 146 and Model Avro 146-RJ Airplanes

Unsafe Condition: Accumulation of water in the left- and right-hand elevators may upset the balance of the elevators, resulting in elevator oscillation and subsequent airplane pitch oscillations, leading to reduced ...

Effective: Sep 12, 1995 Category: aircraft Compliance: Within 30 days after the effective date of this AD, or prior to further flight if seams are not s...
Technical illustration of an aircraft flight control surface and actuator
Problem area Flight controls

95-15-05

final rule

Airworthiness Directives; British Aerospace Model BAe 146-100A, -200A, and -300A Airplanes

Unsafe Condition: Low frequency constant amplitude oscillations of the elevator control system and non-centering of the pitch control upon autopilot disconnect, which can cause uncommanded descent and reduced contro...

Effective: Aug 23, 1995 Category: aircraft Compliance: Within 60 days after the effective date of this AD (August 23, 1995).
Technical illustration of an aircraft flight control surface and actuator
Problem area Flight controls

95-10-15

final rule

Airworthiness Directives; British Aerospace Model BAe 146-100A, -200A, -300A and Model Avro 146-RJ70A, -RJ85A, and -RJ100A Airplanes

Unsafe Condition: Failure of the evacuation slide to deploy automatically on demand, necessitating manual deployment by the flight crew which could delay or impede passenger evacuation during an emergency.

Effective: Jun 21, 1995 Category: aircraft Compliance: Within 3 months after the effective date of this AD for initial inspection; within 8 months after...

95-08-05

final rule

Airworthiness Directives; British Aerospace Model BAe 146-100A, -200A, and -300A, and Model Avro 146-RJ70A, -RJ85A, and -RJ100A Series Airplanes

Unsafe Condition: Fuel leaks from bolt positions on the rear spar attachment fitting at wing rib 2, leading to a subsequent fire.

Effective: May 18, 1995 Category: aircraft Compliance: Within 12 months after the effective date of this AD (May 18, 1995) for airplanes under paragraph...

95-05-01

final rule

Airworthiness Directives; British Aerospace Model BAe 146-100A, -200A, and -300A Series Airplanes

Unsafe Condition: Generator control units (GCU) may have the underfrequency trip level set too high, which could lead to the unwanted shutdown of an electrical generator, resulting in loss of all generated electrica...

Effective: Apr 13, 1995 Category: aircraft Compliance: Within 6 months after the effective date of this AD, check the part and serial number on the data...
Technical illustration of an aircraft electrical generator and wiring assembly
Problem area Electrical system

94-17-14

final rule

Airworthiness Directives; British Aerospace Model BAe 146-100A, -200A, and -300A Series Airplanes

Unsafe Condition: Hydraulic fluid leakage from the pump case drain line quick release couplings could fuel the flames in the event of an engine fire.

Effective: Oct 11, 1994 Category: aircraft Compliance: Within 6 months after January 20, 1994 (for some serial numbers) or within 6 months after October...
Technical illustration of an aircraft turbine engine assembly
Problem area Engine

94-09-03

final rule

Airworthiness Directives; British Aerospace Model BAe 146 Series Airplanes

Unsafe Condition: Worn brakes may result in loss of main landing gear braking effectiveness during a high energy rejected takeoff (RTO).

Effective: May 20, 1994 Category: aircraft Compliance: Within 180 days after the effective date of this AD
Technical illustration of an aircraft landing gear and wheel assembly
Problem area Landing gear

94-05-08

final rule

Airworthiness Directives; British Aerospace Model BAe 146-100A, -200A, and -300A Series Airplanes

Unsafe Condition: A single phase fault current can cause sequential failure of all onboard main electrical generators and subsequent loss of electrical power sources onboard the airplane.

Effective: Apr 22, 1994 Category: aircraft Compliance: Within 3,100 hours time-in-service after the effective date of this AD
Technical illustration of an aircraft electrical generator and wiring assembly
Problem area Electrical system