Embraer - Empresa Brasileira de Aeronautica S.A. ERJ 190-100 ECJ Airworthiness Directives

Browse ADs indexed for this model. Applicability depends on your aircraft configuration.

Check your aircraft configuration

2011-18-04

final rule

Airworthiness Directives; Empresa Brasileira de Aeronautica S.A. (EMBRAER) Model ERJ 170 and ERJ 190 Airplanes

Unsafe Condition: Failures of the Escape Slide installed on the forward passenger and service door have occurred, preventing the door from opening, which could delay an emergency evacuation and increase the chance o...

Effective: Oct 14, 2011 Category: aircraft Compliance: Within 12 months of the effective date (October 14, 2011).

2011-18-14

final rule

Airworthiness Directives; Empresa Brasileira de Aeronautica S.A. (EMBRAER) Model ERJ 190 Airplanes

Unsafe Condition: The pylon internal shear pin was found cracked due to hydrogen embrittlement, which could lead to insufficient strength of the pylon to wing attachment. This, in combination with an engine imbalanc...

Effective: Oct 14, 2011 Category: aircraft Compliance: Within 3,000 flight hours after the effective date of this AD, or within 12 months after the effe...
Technical illustration of an aircraft turbine engine assembly
Problem area Engine

2011-08-08

final rule

Airworthiness Directives; Empresa Brasileira de Aeronautica S.A. (EMBRAER) Model ERJ 170 and ERJ 190 Airplanes

Unsafe Condition: Screw units manufactured with metallographic non-conformity may increase susceptibility to brittle fracture, leading to loss of the related balance washer, causing a possible ram air turbine (RAT) ...

Effective: May 18, 2011 Category: aircraft Compliance: Within 1,200 flight hours or 6 months after the effective date, whichever occurs first.

2009-06-11

final rule

Airworthiness Directives; Empresa Brasileira de Aeronautica S.A. (EMBRAER) Model ERJ 190 Airplanes

Unsafe Condition: Cracks were found in the wing lower skin stringers between ribs 7 and 10 on both wings during aircraft structure fatigue tests, which could result in fuel leakage and reduced structural integrity o...

Effective: Apr 28, 2009 Category: aircraft Compliance: Within 12 months of the effective date (April 28, 2009)