BAE Systems (Operations) Limited Avro 146-RJ100A Airworthiness Directives

Browse ADs indexed for this model. Applicability depends on your aircraft configuration.

Check your aircraft configuration

97-06-12

final rule

Airworthiness Directives; British Aerospace Models BAe 146 and Avro 146-RJ Series Airplanes

Unsafe Condition: Failure of the main fitting of the nose landing gear (NLG), which could lead to collapse of the NLG during landing.

Effective: Apr 21, 1997 Category: aircraft Compliance: Prior to the accumulation of 16,000 total landings or within 30 days after the effective date of ...
Technical illustration of an aircraft landing gear and wheel assembly
Problem area Landing gear

97-04-17

final rule

Airworthiness Directives; British Aerospace Models BAe 146 and Model Avro 146-RJ Series Airplanes

Unsafe Condition: Leakage of hydraulic fluid from the lock jack assemblies of the main landing gear (MLG) due to a manufacturing forging defect that extends through the wall of the lock jack assembly. This leakage, ...

Effective: Mar 31, 1997 Category: aircraft Compliance: Within 30 days after the effective date of this AD, and within 6 months after the effective date ...
Technical illustration of an aircraft landing gear and wheel assembly
Problem area Landing gear

97-01-07

final rule

Airworthiness Directives; British Aerospace Model BAe 146 and Avro 146-RJ Series Airplanes

Unsafe Condition: Water and ice accumulation at the trailing edge of the left and right elevators can cause elevator unbalance, leading to oscillation or flutter which may reduce controllability or result in loss of...

Effective: Feb 13, 1997 Category: aircraft Compliance: Within 12 months after the effective date of this AD (February 13, 1997).
Technical illustration of an aircraft flight control surface and actuator
Problem area Flight controls

96-23-08

final rule

Airworthiness Directives; British Aerospace Model BAe 146 Series Airplanes and Model Avro 146-RJ Series Airplanes

Unsafe Condition: The inability of the windshear computer to detect the true flap position due to electrical circuit integrity issues between the windshear computer and flap position sensor, which could result in er...

Effective: Dec 19, 1996 Category: aircraft Compliance: Within 300 landings or 60 days after the effective date of this AD, whichever occurs first; repla...

96-22-04

final rule

Airworthiness Directives; British Aerospace Model Avro 146-RJ70A, -RJ85A, and -RJ100A Airplanes

Unsafe Condition: Fatigue cracking in the web and inboard flange of fuselage frame 29.

Effective: Dec 11, 1996 Category: aircraft Compliance: Within 6 months after December 11, 1996, or prior to accumulating 12,000; 24,000; or 68,000 total...
Technical illustration of a riveted aircraft structural panel and frame
Problem area Airframe structure

96-22-05

final rule

Airworthiness Directives; British Aerospace Model BAe 146-100A, -200A, and -300A Series Airplanes, and Model Avro 146-RJ70A, -RJ85A, and RJ-100A Airplanes

Unsafe Condition: Loss of the emergency electrical system due to insufficient capacity of the No. 2 battery to power the electrical system caused by the absence of a two-way link between terminals 'D8' and 'D9' on D...

Effective: Dec 11, 1996 Category: aircraft Compliance: Within 3 months after the effective date of this AD
Technical illustration of an aircraft electrical generator and wiring assembly
Problem area Electrical system

96-21-09

final rule

Airworthiness Directives; British Aerospace Models BAe 146 and Model Avro 146-RJ Series Airplanes

Unsafe Condition: Failure of the direction link subassembly of the main landing gear (MLG) due to corrosion, which could result in reduced directional control of the airplane during landing.

Effective: Nov 29, 1996 Category: aircraft Compliance: Prior to the later of: (a) 12,000 total landings or 5 years since MLG manufacture/overhaul (which...
Technical illustration of an aircraft landing gear and wheel assembly
Problem area Landing gear

95-23-06

final rule

Airworthiness Directives; British Aerospace Model BAe 146-100A, -200A, and -300A Airplanes and Model Avro 146-RJ70A, -RJ85A, and RJ-100A Airplanes

Unsafe Condition: Cracking due to leakage of hot exhaust gases in the forward face of the central panel of the forward firewall of the auxiliary power unit (APU) bay could damage the wiring to the APU fire bottle, r...

Effective: Nov 29, 1995 Category: aircraft Compliance: within 14 days after crack detection
Technical illustration of an aircraft electrical generator and wiring assembly
Problem area Electrical system

95-21-13

final rule

Airworthiness Directives; British Aerospace Model BAe 146 and Model Avro 146-RJ Series Airplanes

Unsafe Condition: Corrosion on an aileron tab bracket between the two tab drive flanges in the area of the two attachment bolts resulted in cracking of the bracket flanges at their base, which could lead to failure ...

Effective: Nov 2, 1995 Category: aircraft Compliance: Within 14 days after the effective date of this AD
Technical illustration of an aircraft flight control surface and actuator
Problem area Flight controls

95-17-13

final rule

Airworthiness Directives; British Aerospace Model BAe 146 and Model Avro 146-RJ Airplanes

Unsafe Condition: Accumulation of water in the left- and right-hand elevators may upset the balance of the elevators, resulting in elevator oscillation and subsequent airplane pitch oscillations, leading to reduced ...

Effective: Sep 12, 1995 Category: aircraft Compliance: Within 30 days after the effective date of this AD, or prior to further flight if seams are not s...
Technical illustration of an aircraft flight control surface and actuator
Problem area Flight controls

95-10-15

final rule

Airworthiness Directives; British Aerospace Model BAe 146-100A, -200A, -300A and Model Avro 146-RJ70A, -RJ85A, and -RJ100A Airplanes

Unsafe Condition: Failure of the evacuation slide to deploy automatically on demand, necessitating manual deployment by the flight crew which could delay or impede passenger evacuation during an emergency.

Effective: Jun 21, 1995 Category: aircraft Compliance: Within 3 months after the effective date of this AD for initial inspection; within 8 months after...

95-08-05

final rule

Airworthiness Directives; British Aerospace Model BAe 146-100A, -200A, and -300A, and Model Avro 146-RJ70A, -RJ85A, and -RJ100A Series Airplanes

Unsafe Condition: Fuel leaks from bolt positions on the rear spar attachment fitting at wing rib 2, leading to a subsequent fire.

Effective: May 18, 1995 Category: aircraft Compliance: Within 12 months after the effective date of this AD (May 18, 1995) for airplanes under paragraph...