AD 95-04-02

final rule
Data completeness: 70%

Rolls-Royce, plc (R-R) Models RB211-524B-02, -524B-B-02, -524B3-02, -524B2-19, -524B2-B-19, -524C2-19, and -524C2-B-19 Engines

AD Number
95-04-02
Status
final_rule
Effective Date
Product Category
engine
Docket
93-ANE-40
FR Citation
Federal Register: March 07, 1995 (Volume 60, Number 44)

Applicability

TypeManufacturerModelDetails
engine Rolls-Royce plc RB211-524B-02 Rolls-Royce, plc (R-R) Models RB211-524B-02, -524B-B-02, -524B3-02, -524B2-19, -524B2-B-19, -524C2-19, and -524C2-B-19 Engines
engine Rolls-Royce plc RB211-524B-B-02 Rolls-Royce, plc (R-R) Models RB211-524B-02, -524B-B-02, -524B3-02, -524B2-19, -524B2-B-19, -524C2-19, and -524C2-B-19 Engines
engine Rolls-Royce plc RB211-524B2-19 Rolls-Royce, plc (R-R) Models RB211-524B-02, -524B-B-02, -524B3-02, -524B2-19, -524B2-B-19, -524C2-19, and -524C2-B-19 Engines
engine Rolls-Royce plc RB211-524B2-B-19 Rolls-Royce, plc (R-R) Models RB211-524B-02, -524B-B-02, -524B3-02, -524B2-19, -524B2-B-19, -524C2-19, and -524C2-B-19 Engines
engine Rolls-Royce plc RB211-524B3-02 Rolls-Royce, plc (R-R) Models RB211-524B-02, -524B-B-02, -524B3-02, -524B2-19, -524B2-B-19, -524C2-19, and -524C2-B-19 Engines
engine Rolls-Royce plc RB211-524C2-19 Rolls-Royce, plc (R-R) Models RB211-524B-02, -524B-B-02, -524B3-02, -524B2-19, -524B2-B-19, -524C2-19, and -524C2-B-19 Engines
engine Rolls-Royce plc RB211-524C2-B-19 Rolls-Royce, plc (R-R) Models RB211-524B-02, -524B-B-02, -524B3-02, -524B2-19, -524B2-B-19, -524C2-19, and -524C2-B-19 Engines

Unsafe Condition

Release of the stage 2 nozzle guide vane (NGV) seal ring could result in rotor contact, severance of the rotor drive arm, and an uncontained engine failure.

AI-generated summary from the source AD text. Verify against the official source before acting.

Required Actions

Modify the NGV assembly in accordance with Rolls-Royce Mandatory Service Bulletin RB.211-72-9672, Revision 1, at the next shop visit or by specific deadlines depending on aircraft type (9 months for Boeing 747 series, 20 months for Lockheed L-1011 series).

AI-generated summary from the source AD text. Verify against the official source before acting.

Compliance Time

Not later than 9 months after the effective date of this AD for Boeing 747 series engines, and 20 months for Lockheed L-1011 series engines, whichever occurs first with the next shop visit.

AI-generated summary from the source AD text. Verify against the official source before acting.

Affected Aircraft

Rolls-Royce, plc Models RB211-524B-02, -524B-B-02, -524B3-02, -524B2-19, -524B2-B-19, -524C2-19, and -524C2-B-19 engines installed on Boeing 747 and Lockheed L-1011 series aircraft.

AI-generated summary from the source AD text. Verify against the official source before acting.

Source: Official FAA Source ↗

Retrieved: Apr 8, 2026

Rights: U.S. Government Public Domain

This site is not affiliated with or endorsed by the FAA. Always verify with official sources.