AD 92-19-03
Applicability
| Type | Manufacturer | Model | Details |
|---|---|---|---|
| aircraft | Airbus | A300 B2-1A | Airworthiness Directives; AIRBUS INDUSTRIE Model A300, A310, and A300-600 Series Airplanes |
| aircraft | Airbus | A300 B2-1C | Airworthiness Directives; AIRBUS INDUSTRIE Model A300, A310, and A300-600 Series Airplanes |
| aircraft | Airbus | A300 B2-203 | Airworthiness Directives; AIRBUS INDUSTRIE Model A300, A310, and A300-600 Series Airplanes |
| aircraft | Airbus | A300 B2K-3C | Airworthiness Directives; AIRBUS INDUSTRIE Model A300, A310, and A300-600 Series Airplanes |
| aircraft | Airbus | A300 B4-103 | Airworthiness Directives; AIRBUS INDUSTRIE Model A300, A310, and A300-600 Series Airplanes |
| aircraft | Airbus | A300 B4-203 | Airworthiness Directives; AIRBUS INDUSTRIE Model A300, A310, and A300-600 Series Airplanes |
| aircraft | Airbus | A300 B4-2C | Airworthiness Directives; AIRBUS INDUSTRIE Model A300, A310, and A300-600 Series Airplanes |
| aircraft | Airbus | A300 B4-601 | Airworthiness Directives; AIRBUS INDUSTRIE Model A300, A310, and A300-600 Series Airplanes |
| aircraft | Airbus | A300 B4-603 | Airworthiness Directives; AIRBUS INDUSTRIE Model A300, A310, and A300-600 Series Airplanes |
| aircraft | Airbus | A300 B4-605R | Airworthiness Directives; AIRBUS INDUSTRIE Model A300, A310, and A300-600 Series Airplanes |
| aircraft | Airbus | A300 B4-620 | Airworthiness Directives; AIRBUS INDUSTRIE Model A300, A310, and A300-600 Series Airplanes |
| aircraft | Airbus | A300 B4-622R | Airworthiness Directives; AIRBUS INDUSTRIE Model A300, A310, and A300-600 Series Airplanes |
| aircraft | Airbus | A300 F4-605R | Airworthiness Directives; AIRBUS INDUSTRIE Model A300, A310, and A300-600 Series Airplanes |
| aircraft | Airbus | A300 F4-622R | Airworthiness Directives; AIRBUS INDUSTRIE Model A300, A310, and A300-600 Series Airplanes |
| aircraft | Airbus | A310-203 | Airworthiness Directives; AIRBUS INDUSTRIE Model A300, A310, and A300-600 Series Airplanes |
| aircraft | Airbus | A310-221 | Airworthiness Directives; AIRBUS INDUSTRIE Model A300, A310, and A300-600 Series Airplanes |
| aircraft | Airbus | A310-222 | Airworthiness Directives; AIRBUS INDUSTRIE Model A300, A310, and A300-600 Series Airplanes |
| aircraft | Airbus | A310-304 | Airworthiness Directives; AIRBUS INDUSTRIE Model A300, A310, and A300-600 Series Airplanes |
| aircraft | Airbus | A310-322 | Airworthiness Directives; AIRBUS INDUSTRIE Model A300, A310, and A300-600 Series Airplanes |
| aircraft | Airbus | A310-324 | Airworthiness Directives; AIRBUS INDUSTRIE Model A300, A310, and A300-600 Series Airplanes |
| aircraft | Airbus | A310-325 | Airworthiness Directives; AIRBUS INDUSTRIE Model A300, A310, and A300-600 Series Airplanes |
Unsafe Condition
Failure of the ram air turbine (RAT) to release properly due to improper operation of the Teleflex flexible control cables (load to move the handle exceeding 5.5 daN).
AI-generated summary from the source AD text. Verify against the official source before acting.
Required Actions
Within 6 months after the effective date, test the RAT Teleflex flexible control cables to ensure load to move the handle is ≤5.5 daN. If discrepancies (load >5.5 daN) are found, perform maintenance tasks before further flight and repeat every 30 months. Modify the control cables per specified service bulletins to terminate repetitive tasks.
AI-generated summary from the source AD text. Verify against the official source before acting.
Compliance Time
Within 6 months after the effective date of this AD, and thereafter at intervals not to exceed 30 months.
AI-generated summary from the source AD text. Verify against the official source before acting.
Affected Aircraft
AIRBUS INDUSTRIE Model A300, A310, and A300-600 series airplanes where Modification 4803 has not been accomplished.
AI-generated summary from the source AD text. Verify against the official source before acting.
Federal Register Abstract
RAT Flexible Control Cables
Applicability Source Text
Show captured applicability text from the source AD
AD Final Rules - DRS_92-19-03.html Copy URL Print/Save as PDF Document Versions Feedback Details AD Number: 92-19-03 Document Type: AD Final Rules Docket Number: 92-NM-35-AD Subject Heading: Airworthiness Directives; AIRBUS INDUSTRIE Model A300, A310, and A300-600 Series Airplanes Subject: RAT Flexible Control Cables Status: Current Citation: This information is not available. Citation Publish Date: Effective Date: 11/20/1992 Make: Airbus Model: A300 B2-1A | A300 B2-1C | A300 B2-203 | A300 B2K-3C | A300 B4-103 | A300 B4-203 | A300 B4-2C | A300 ...Show more Product Type: Aircraft Product Subtype: Large Airplane Affected AD: Superseded AD: Affected By: Superseded By: Service/Office: Office of Primary Responsibility: CFR Part Reference: Part 39 Comments: AIRWORTHINESS DIRECTIVES FINAL RULES: 92-19-03 CITATION: This information is not available. PAGE NUMBER: DOCKET NUMBER: 92-NM-35-AD AMENDMENT: 39-8361 AD NUMBER: 92-19-03 SUBJECT HEADING: Airworthiness Directives; AIRBUS INDUSTRIE Model A300, A310, and A300-600 Series Airplanes ACTION: SUMMARY: DATES: Effective November 20, 1992. ADDRESSES: FOR FURTHER INFORMATION CONTACT: SUPPLEMENTARY INFORMATION: REGULATORY TEXT: 92-19-03 AIRBUS INDUSTRIE: Amendment 39-8361. Docket No. 92-NM-35-AD. Applicability: Model A300, A310, and A300-600 series airplanes, on which Modification 4803 has not been accomplished, certificated in any category. Compliance: Required as indicated, unless accomplished previously. To prevent failure of the ram air turbine (RAT) to release properly, accomplish the following: (a) Within 6 months after the effective date of this AD, conduct a test of the RAT Teleflex flexible control cables to verify that the control cables operate properly (the load to move the handle must be equal to or lower than 5.5 daN), in accordance with Airbus Industrie Service Bulletins A300-29-097, Revision 2, dated August 27, 1991 (for Model A300 series airplanes); A310-29-2030, Revision 2, dated August 27, 1991 (for Model A310 series airplanes); or A300-29-6022, Revision 2, dated August 27, 1991 (for Model A300-600 series airplanes), as applicable. (b) If no discrepancy is detected, thereafter at intervals not to exceed 30 months, accomplish the "Maintenance Task" specified in paragraph 2.C. of Airbus Industrie Service Bulletin A300-29-097, Revision 2, dated August 27, 1991 (for Model A300 series airplanes); A310-29-2030, Revision 2, dated August 27, 1991 (for Model A310 series airplanes); or A300-29-6022, Revision 2, dated August 27, 1991 (for Model A300-600 series airplanes); as applicable. (c) If any discrepancy is detected (e.g., the load to move the handle during operation of the left or right control cable is higher than 5.5 daN), accomplish paragraphs (c)(1) and (c)(2) of this AD: (1) Prior to further flight, accomplish the "Maintenance Task" specified in paragraph 2.C. of Airbus Industrie Service Bulletin A300-29-097, Revision 2, dated August 27, 1991 (for Model A300 series airplanes); A310-29-2030, Revision 2, dated August 27, 1991 (for Model A310 series airplanes); or A300-29-6022, Revision 2, dated August 27, 1991 (for Model A300-600 series airplanes), as applicable. (2) At intervals not to exceed 30 months after the accomplishment of the Maintenance Task in accordance with paragraph (c)(1) of this AD, repeat the Maintenance Task in accordance with the applicable Airbus Industrie service bulletin. (d) Modification of the Teleflex flexible control cable on the RAT, in accordance with Airbus Industrie Service Bulletin A300-29-0099, dated January 30, 1992 (for Model A300 series airplanes), A310-29-2032, Revision 1, dated June 10, 1992 (for Model A310 series airplanes), or A300-29-6024, Revision 1, dated June 10, 1992 (for Model A300-600 series airplanes), as applicable, constitutes terminating action for accomplishing the repetitive "Maintenance Tasks" required by paragraphs (b) and (c)(2) of this AD. (e) An alternative method of compliance or adjustment of the compliance time that provides an acceptable level of safety may be used if approved by the Manager, Standardization Branch, ANM-113, FAA, Transport Airplane Directorate. Operators shall submit their requests through an appropriate FAA Principal Maintenance Inspector, who may add comments and then send it to the Manager, Standardization Branch. NOTE: Information concerning the existence of approved alternative methods of compliance with this AD, if any, may be obtained from the Standardization Branch. (f) Special flight permits may be issued in accordance with FAR 21.197 and 21.199 to operate the airplane to a location where the requirements of this AD can be accomplished. (g) The test, "Maintenance Tasks," and modification shall be done in accordance with the following Airbus Industrie service bulletins, as applicable, which contain the specified effective pages: Service Bulletin Referenced Page Number Revision Level Shown on Page Date Shown on Page A310-29-2030, Revision 2, 1-15 2 August 27, 1991 A300-29-6022 Revision 2, August 27, 1991 1-13 2 August 27, 1991 A300-29-097, Revision 2, August 27, 1991 1, 4-17 2 3 2 Original 1 August 27, 1991 June 3, 1991 A300-29-6024, Revision 1, June 10, 1992 1, 3-17 2 1 Original June 10, 1992 January 30, 1992 A310-29-2032, Revision 1, June 10, 1992 1, 4-19 2-3 1 Original June 10, 1992 January 30, 1992 A300-29-0099, January 30, 1992 1-19 Original January 30, 1992 This incorporation by reference was approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR Part 51. Copies may be obtained from Airbus Industrie, Airbus Support Division, Avenue Didier Daurat, 31700 Blagnac, France. Copies may be inspected at the FAA, Transport Airplane Directorate, 1601 Lind Avenue, SW., Renton, Washington; or at the Office of the Federal Register, 800 North Capitol Street, NW., suite 700, Washington, DC. (h) This amendment becomes effective on November 20, 1992. FOOTER:
Document Text
Show stored source text (verify against official source)
AD Final Rules - DRS_92-19-03.html Copy URL Print/Save as PDF Document Versions Feedback Details AD Number: 92-19-03 Document Type: AD Final Rules Docket Number: 92-NM-35-AD Subject Heading: Airworthiness Directives; AIRBUS INDUSTRIE Model A300, A310, and A300-600 Series Airplanes Subject: RAT Flexible Control Cables Status: Current Citation: This information is not available. Citation Publish Date: Effective Date: 11/20/1992 Make: Airbus Model: A300 B2-1A | A300 B2-1C | A300 B2-203 | A300 B2K-3C | A300 B4-103 | A300 B4-203 | A300 B4-2C | A300 ...Show more Product Type: Aircraft Product Subtype: Large Airplane Affected AD: Superseded AD: Affected By: Superseded By: Service/Office: Office of Primary Responsibility: CFR Part Reference: Part 39 Comments: AIRWORTHINESS DIRECTIVES FINAL RULES: 92-19-03 CITATION: This information is not available. PAGE NUMBER: DOCKET NUMBER: 92-NM-35-AD AMENDMENT: 39-8361 AD NUMBER: 92-19-03 SUBJECT HEADING: Airworthiness Directives; AIRBUS INDUSTRIE Model A300, A310, and A300-600 Series Airplanes ACTION: SUMMARY: DATES: Effective November 20, 1992. ADDRESSES: FOR FURTHER INFORMATION CONTACT: SUPPLEMENTARY INFORMATION: REGULATORY TEXT: 92-19-03 AIRBUS INDUSTRIE: Amendment 39-8361. Docket No. 92-NM-35-AD. Applicability: Model A300, A310, and A300-600 series airplanes, on which Modification 4803 has not been accomplished, certificated in any category. Compliance: Required as indicated, unless accomplished previously. To prevent failure of the ram air turbine (RAT) to release properly, accomplish the following: (a) Within 6 months after the effective date of this AD, conduct a test of the RAT Teleflex flexible control cables to verify that the control cables operate properly (the load to move the handle must be equal to or lower than 5.5 daN), in accordance with Airbus Industrie Service Bulletins A300-29-097, Revision 2, dated August 27, 1991 (for Model A300 series airplanes); A310-29-2030, Revision 2, dated August 27, 1991 (for Model A310 series airplanes); or A300-29-6022, Revision 2, dated August 27, 1991 (for Model A300-600 series airplanes), as applicable. (b) If no discrepancy is detected, thereafter at intervals not to exceed 30 months, accomplish the "Maintenance Task" specified in paragraph 2.C. of Airbus Industrie Service Bulletin A300-29-097, Revision 2, dated August 27, 1991 (for Model A300 series airplanes); A310-29-2030, Revision 2, dated August 27, 1991 (for Model A310 series airplanes); or A300-29-6022, Revision 2, dated August 27, 1991 (for Model A300-600 series airplanes); as applicable. (c) If any discrepancy is detected (e.g., the load to move the handle during operation of the left or right control cable is higher than 5.5 daN), accomplish paragraphs (c)(1) and (c)(2) of this AD: (1) Prior to further flight, accomplish the "Maintenance Task" specified in paragraph 2.C. of Airbus Industrie Service Bulletin A300-29-097, Revision 2, dated August 27, 1991 (for Model A300 series airplanes); A310-29-2030, Revision 2, dated August 27, 1991 (for Model A310 series airplanes); or A300-29-6022, Revision 2, dated August 27, 1991 (for Model A300-600 series airplanes), as applicable. (2) At intervals not to exceed 30 months after the accomplishment of the Maintenance Task in accordance with paragraph (c)(1) of this AD, repeat the Maintenance Task in accordance with the applicable Airbus Industrie service bulletin. (d) Modification of the Teleflex flexible control cable on the RAT, in accordance with Airbus Industrie Service Bulletin A300-29-0099, dated January 30, 1992 (for Model A300 series airplanes), A310-29-2032, Revision 1, dated June 10, 1992 (for Model A310 series airplanes), or A300-29-6024, Revision 1, dated June 10, 1992 (for Model A300-600 series airplanes), as applicable, constitutes terminating action for accomplishing the repetitive "Maintenance Tasks" required by paragraphs (b) and (c)(2) of this AD. (e) An alternative method of compliance or adjustment of the compliance time that provides an acceptable level of safety may be used if approved by the Manager, Standardization Branch, ANM-113, FAA, Transport Airplane Directorate. Operators shall submit their requests through an appropriate FAA Principal Maintenance Inspector, who may add comments and then send it to the Manager, Standardization Branch. NOTE: Information concerning the existence of approved alternative methods of compliance with this AD, if any, may be obtained from the Standardization Branch. (f) Special flight permits may be issued in accordance with FAR 21.197 and 21.199 to operate the airplane to a location where the requirements of this AD can be accomplished. (g) The test, "Maintenance Tasks," and modification shall be done in accordance with the following Airbus Industrie service bulletins, as applicable, which contain the specified effective pages: Service Bulletin Referenced Page Number Revision Level Shown on Page Date Shown on Page A310-29-2030, Revision 2, 1-15 2 August 27, 1991 A300-29-6022 Revision 2, August 27, 1991 1-13 2 August 27, 1991 A300-29-097, Revision 2, August 27, 1991 1, 4-17 2 3 2 Original 1 August 27, 1991 June 3, 1991 A300-29-6024, Revision 1, June 10, 1992 1, 3-17 2 1 Original June 10, 1992 January 30, 1992 A310-29-2032, Revision 1, June 10, 1992 1, 4-19 2-3 1 Original June 10, 1992 January 30, 1992 A300-29-0099, January 30, 1992 1-19 Original January 30, 1992 This incorporation by reference was approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR Part 51. Copies may be obtained from Airbus Industrie, Airbus Support Division, Avenue Didier Daurat, 31700 Blagnac, France. Copies may be inspected at the FAA, Transport Airplane Directorate, 1601 Lind Avenue, SW., Renton, Washington; or at the Office of the Federal Register, 800 North Capitol Street, NW., suite 700, Washington, DC. (h) This amendment becomes effective on November 20, 1992. FOOTER:
Source: Official FAA Source ↗
Retrieved: Apr 8, 2026
Rights: U.S. Government Public Domain
This site is not affiliated with or endorsed by the FAA. Always verify with official sources.