AD 81-09-02

final rule

Airworthiness Directives; PICCARD BALLOON Model Ax-6 Series Balloon

AD Number
81-09-02
Status
final_rule
Effective Date
Product Category
aircraft
Docket
Unknown
FR Citation
This information is not available.

Applicability

TypeManufacturerModelDetails
aircraft Sundance Balloons (US) AX-6 Airworthiness Directives; PICCARD BALLOON Model Ax-6 Series Balloon

Unsafe Condition

Inadvertent deflation panel opening in flight due to broken hook and pile (Velcro) or deterioration caused by heat in the synthetic fastener tape of the deflation panel system.

AI-generated summary from the source AD text. Verify against the official source before acting.

Required Actions

Prior to next inflation and during each subsequent preflight inspection, check the hook and pile fastener tape for damage or deterioration, repair unserviceable areas, conduct a side shear load transfer capability check, and replace degraded tape. Install an approved mechanical latch at the balloon envelope apex. Conduct side shear load checks every 100 hours time in service or annually, whichever comes first.

AI-generated summary from the source AD text. Verify against the official source before acting.

Compliance Time

Prior to next inflation, and during each subsequent preflight inspection after the effective date of this AD. Install mechanical latch prior to next inflation. Side shear load checks at intervals not to exceed 100 hours time in service or at each annual inspection after the effective date.

AI-generated summary from the source AD text. Verify against the official source before acting.

Affected Aircraft

PICCARD BALLOON Model Ax-6 Series Balloon, certified in all categories.

AI-generated summary from the source AD text. Verify against the official source before acting.

Federal Register Abstract

Deflation Panel System

Applicability Source Text

Show captured applicability text from the source AD
AD Final Rules - DRS_81-09-02.html
Copy URL
Print/Save as PDF
Document Versions
 Feedback
Details
AD Number:
81-09-02
Document Type:
AD Final Rules
Docket Number:
Unknown
Subject Heading:
Airworthiness Directives; PICCARD BALLOON Model Ax-6 Series Balloon
Subject:
Deflation Panel System
Status:
Current
Citation:
This information is not available.
Citation Publish Date:
Effective Date:
04/23/1981
Make:
Sundance Balloons (US)
Model:
AX-6
Product Type:
Aircraft
Product Subtype:
Balloon
Affected AD:
Superseded AD:
Affected By:
Superseded By:
Service/Office:
Office of Primary Responsibility:
CFR Part Reference:
Part 39
Comments:
AIRWORTHINESS DIRECTIVES FINAL RULES: 81-09-02
CITATION:   This information is not available.

PAGE NUMBER:  

DOCKET NUMBER:   Unknown

AMENDMENT:   39-4091

AD NUMBER:   81-09-02

SUBJECT HEADING:   Airworthiness Directives; PICCARD BALLOON Model Ax-6 Series Balloon

ACTION:  

SUMMARY:  

DATES:   Effective April 23, 1981.

ADDRESSES:  

FOR FURTHER INFORMATION CONTACT:  

SUPPLEMENTARY INFORMATION:  

REGULATORY TEXT:  
81-09-02 PICCARD BALLOON: Amendment 39-4091. Applies to Model Ax-6 Series Balloon, certified in all categories.

Compliance is required as indicated, unless already accomplished.

To prevent inadvertent deflation panel opening in flight, accomplish the following:

(a) Prior to the next inflation, and during each subsequent preflight inspection, after the effective date of this AD:

(1) Check the synthetic fastener tape, known as hook and pile (Velcro), of the deflation panel system for broken hook and pile, or deterioration caused by heat, in accordance with paragraph A of General Balloon Corporation Service Letter Number 7, dated March 17, 1981, (hereafter referred to as General Balloon Letter No. 7).

(2) Repair all areas of hook and pile found to be unserviceable during check (a)(1), in accordance with paragraph G of General Balloon Letter No. 7.

(3) After accomplishment of (a)(1) and (a)(2), conduct a side shear load transfer capability check of the hook and pile, in accordance with paragraph B of General Balloon Letter No. 7. If hook and pile separate, accomplish either (i) or (ii) as follows:

(i) Have the side shear load transfer capability of the hook and pile retested by a rated mechanic or certified repair station, in accordance with paragraph E of General Balloon Letter No. 7, and replace all areas of hook and pile unable to sustain the side shear load with like serviceable fastener tape.

(ii) Have a rated mechanic or certified repair station replace areas of hook and pile that did not pass the side shear load transfer capability check conducted in paragraph (a)(3) with like serviceable fastener tape.

(4) Preflight checks conducted in accordance with Piccard Balloon Ax-6 Balloon Flight Manual (BFM) Revision No. 9, dated April 2, 1981, deletes the requirements for subsequent preflight checks specified in paragraph (a) of this AD.

(b) Prior to next inflation, after the effective date of this AD, install an approved mechanical latch (i.e., a Capewell) at the apex of the balloon envelope, in accordance with the balloon manufacturer's instructions as approved by the FAA.

(c) At intervals not to exceed 100 hours time in service or at each annual inspection after the effective date of this AD, whichever comes first, accomplish side shear load transfer capability test of the hook and pile fastener tape, in accordance with paragraph E of General Balloon Letter No. 7. Replace areas of degraded hook and pile fastener tape with like serviceable fastener tape.

NOTE: The General Balloon Corporation Service Letter Number 7, dated March 17, 1981, is applicable to Piccard Balloon Model Ax-6, since General Balloon Corporation produces the Piccard Balloon Ax-6 under a licensing arrangement with Don Piccard Balloons, Inc., the type certificate holder.

NOTE: Revision 9 to the Piccard Balloon Ax-6 Balloon Flight Manual (BFM), dated April 2, 1981, is being distributed with General Balloon Corporation Service Letter Number 7, dated March 17, 1981, or may be obtained from General Balloon Corporation, P.O. Box 1902, Newport Beach, California 92663.

All repairs, modifications, and inspections stipulated in this AD must be accomplished by a rated mechanic or an FAA certified repair station.

The checks required by this AD constitute preventative maintenance and may be performed by persons authorized to perform preventative maintenance under FAR 43.

The checks required by this AD may be performed by a pilot with a free balloon rating.

Accomplishment of the checks required by this AD are to be recorded in the balloon maintenance records.

Alternative inspections, modifications, or other actions which provide an equivalent level of safety may be used when approved by the Chief, Engineering and Manufacturing Branch, FAA Western Region.

The manufacturer's specifications and procedures identified and described in this directive are incorporated herein and made a part hereof pursuant to 5 U.S.C. 553(a)(1). All persons affected by this directive who have not already received these documents from the manufacturer may obtain copies upon request to General Balloon Corporation, P.O. Box 1902, Newport Beach, California 92663. These documents may also be examined at Room 6W14, FAA Western Region, 15000 Aviation Boulevard, Hawthorne, California, and at FAA Headquarters, 800 Independence Avenue, S.W., Washington, D.C. A historical file on this AD, which includes the incorporated material in full, is maintained by the FAA at its Headquarters in Washington, D.C., and at FAA Western Region Office, Room 6W14.

This amendment becomes effective April 23, 1981.

FOOTER:

Document Text

Show stored source text (verify against official source)
AD Final Rules - DRS_81-09-02.html
Copy URL
Print/Save as PDF
Document Versions
 Feedback
Details
AD Number:
81-09-02
Document Type:
AD Final Rules
Docket Number:
Unknown
Subject Heading:
Airworthiness Directives; PICCARD BALLOON Model Ax-6 Series Balloon
Subject:
Deflation Panel System
Status:
Current
Citation:
This information is not available.
Citation Publish Date:
Effective Date:
04/23/1981
Make:
Sundance Balloons (US)
Model:
AX-6
Product Type:
Aircraft
Product Subtype:
Balloon
Affected AD:
Superseded AD:
Affected By:
Superseded By:
Service/Office:
Office of Primary Responsibility:
CFR Part Reference:
Part 39
Comments:
AIRWORTHINESS DIRECTIVES FINAL RULES: 81-09-02
CITATION:   This information is not available.

PAGE NUMBER:  

DOCKET NUMBER:   Unknown

AMENDMENT:   39-4091

AD NUMBER:   81-09-02

SUBJECT HEADING:   Airworthiness Directives; PICCARD BALLOON Model Ax-6 Series Balloon

ACTION:  

SUMMARY:  

DATES:   Effective April 23, 1981.

ADDRESSES:  

FOR FURTHER INFORMATION CONTACT:  

SUPPLEMENTARY INFORMATION:  

REGULATORY TEXT:  
81-09-02 PICCARD BALLOON: Amendment 39-4091. Applies to Model Ax-6 Series Balloon, certified in all categories.

Compliance is required as indicated, unless already accomplished.

To prevent inadvertent deflation panel opening in flight, accomplish the following:

(a) Prior to the next inflation, and during each subsequent preflight inspection, after the effective date of this AD:

(1) Check the synthetic fastener tape, known as hook and pile (Velcro), of the deflation panel system for broken hook and pile, or deterioration caused by heat, in accordance with paragraph A of General Balloon Corporation Service Letter Number 7, dated March 17, 1981, (hereafter referred to as General Balloon Letter No. 7).

(2) Repair all areas of hook and pile found to be unserviceable during check (a)(1), in accordance with paragraph G of General Balloon Letter No. 7.

(3) After accomplishment of (a)(1) and (a)(2), conduct a side shear load transfer capability check of the hook and pile, in accordance with paragraph B of General Balloon Letter No. 7. If hook and pile separate, accomplish either (i) or (ii) as follows:

(i) Have the side shear load transfer capability of the hook and pile retested by a rated mechanic or certified repair station, in accordance with paragraph E of General Balloon Letter No. 7, and replace all areas of hook and pile unable to sustain the side shear load with like serviceable fastener tape.

(ii) Have a rated mechanic or certified repair station replace areas of hook and pile that did not pass the side shear load transfer capability check conducted in paragraph (a)(3) with like serviceable fastener tape.

(4) Preflight checks conducted in accordance with Piccard Balloon Ax-6 Balloon Flight Manual (BFM) Revision No. 9, dated April 2, 1981, deletes the requirements for subsequent preflight checks specified in paragraph (a) of this AD.

(b) Prior to next inflation, after the effective date of this AD, install an approved mechanical latch (i.e., a Capewell) at the apex of the balloon envelope, in accordance with the balloon manufacturer's instructions as approved by the FAA.

(c) At intervals not to exceed 100 hours time in service or at each annual inspection after the effective date of this AD, whichever comes first, accomplish side shear load transfer capability test of the hook and pile fastener tape, in accordance with paragraph E of General Balloon Letter No. 7. Replace areas of degraded hook and pile fastener tape with like serviceable fastener tape.

NOTE: The General Balloon Corporation Service Letter Number 7, dated March 17, 1981, is applicable to Piccard Balloon Model Ax-6, since General Balloon Corporation produces the Piccard Balloon Ax-6 under a licensing arrangement with Don Piccard Balloons, Inc., the type certificate holder.

NOTE: Revision 9 to the Piccard Balloon Ax-6 Balloon Flight Manual (BFM), dated April 2, 1981, is being distributed with General Balloon Corporation Service Letter Number 7, dated March 17, 1981, or may be obtained from General Balloon Corporation, P.O. Box 1902, Newport Beach, California 92663.

All repairs, modifications, and inspections stipulated in this AD must be accomplished by a rated mechanic or an FAA certified repair station.

The checks required by this AD constitute preventative maintenance and may be performed by persons authorized to perform preventative maintenance under FAR 43.

The checks required by this AD may be performed by a pilot with a free balloon rating.

Accomplishment of the checks required by this AD are to be recorded in the balloon maintenance records.

Alternative inspections, modifications, or other actions which provide an equivalent level of safety may be used when approved by the Chief, Engineering and Manufacturing Branch, FAA Western Region.

The manufacturer's specifications and procedures identified and described in this directive are incorporated herein and made a part hereof pursuant to 5 U.S.C. 553(a)(1). All persons affected by this directive who have not already received these documents from the manufacturer may obtain copies upon request to General Balloon Corporation, P.O. Box 1902, Newport Beach, California 92663. These documents may also be examined at Room 6W14, FAA Western Region, 15000 Aviation Boulevard, Hawthorne, California, and at FAA Headquarters, 800 Independence Avenue, S.W., Washington, D.C. A historical file on this AD, which includes the incorporated material in full, is maintained by the FAA at its Headquarters in Washington, D.C., and at FAA Western Region Office, Room 6W14.

This amendment becomes effective April 23, 1981.

FOOTER:

Source: Official FAA Source ↗

Retrieved: Apr 8, 2026

Rights: U.S. Government Public Domain

This site is not affiliated with or endorsed by the FAA. Always verify with official sources.