AD 2015-13-07
Applicability
| Type | Manufacturer | Model | Details |
|---|---|---|---|
| aircraft | Airbus | A300 B4-601 | Airworthiness Directives; Airbus Airplanes |
| aircraft | Airbus | A300 B4-603 | Airworthiness Directives; Airbus Airplanes |
| aircraft | Airbus | A300 B4-605R | Airworthiness Directives; Airbus Airplanes |
| aircraft | Airbus | A300 B4-620 | Airworthiness Directives; Airbus Airplanes |
| aircraft | Airbus | A300 B4-622 | Airworthiness Directives; Airbus Airplanes |
| aircraft | Airbus | A300 B4-622R | Airworthiness Directives; Airbus Airplanes |
| aircraft | Airbus | A300 C4-605R Variant F | Airworthiness Directives; Airbus Airplanes |
| aircraft | Airbus | A300 F4-605R | Airworthiness Directives; Airbus Airplanes |
| aircraft | Airbus | A300 F4-622R | Airworthiness Directives; Airbus Airplanes |
Unsafe Condition
Cracking of the lower horizontal stabilizer cutout longeron, the corner fitting, the skin strap, and the outer skin, which could result in reduced structural integrity of the horizontal-stabilizer cutout longeron.
AI-generated summary from the source AD text. Verify against the official source before acting.
Required Actions
Inspect the lower horizontal stabilizer cutout longeron, the corner fitting, the skin strap, and the outer skin using visual and High Frequency Eddy Current (HFEC) rotating probe inspections. Repair any detected cracks. Cold work fastener holes if no cracking is found, unless previously accomplished.
AI-generated summary from the source AD text. Verify against the official source before acting.
Compliance Time
Within the applicable times specified in Airbus Service Bulletin A300-53-6042, Revision 03, dated August 30, 2012, which are based on the accumulation of both flight cycles and flight hours.
AI-generated summary from the source AD text. Verify against the official source before acting.
Affected Aircraft
Airbus Model A300 B4-600, B4-600R, F4-600R series airplanes, and Model A300 C4-605R Variant F airplanes (collectively called Model A300-600 series airplanes).
AI-generated summary from the source AD text. Verify against the official source before acting.
Federal Register Abstract
We are superseding Airworthiness Directive (AD) 98-13-23 for certain Airbus Model A300 B4-600, B4-600R, and F4-600R series airplanes, and Model A300 C4-605R Variant F airplanes (collectively called Model A300-600 series airplanes). AD 98-13-23 required inspections to detect corrosion and cracking of the lower horizontal stabilizer cutout longeron, the corner fitting, the skin strap, and the outer skin; and repair, if necessary. This new AD reduces the compliance times and repetitive intervals, and changes the inspection procedures. This AD was prompted by the determination that the risk of cracking is higher than initially determined. We are issuing this AD to prevent cracking of the lower horizontal stabilizer cutout longeron, the corner fitting, the skin strap, and the outer skin, which could result in reduced structural integrity of the horizontal-stabilizer cutout longeron.
Applicability Source Text
Show captured applicability text from the source AD
(c) Applicability
This AD applies to Airbus Model A300 B4-601, B4-603, B4-620, and
B4-622 airplanes; Model A300 B4-605R and B4-622R airplanes; Model
A300 F4-605R and F4-622R airplanes; and Model A300 C4-605R Variant F
airplanes; certificated in any category; on which Airbus
Modification 6146 has not been installed.
Document Text
Show stored source text (verify against official source)
[Federal Register Volume 80, Number 142 (Friday, July 24, 2015)]
[Rules and Regulations]
[Pages 43931-43936]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2015-17934]
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
14 CFR Part 39
[Docket No. FAA-2014-0011; Directorate Identifier 2013-NM-046-AD;
Amendment 39-18194; AD 2015-13-07]
RIN 2120-AA64
Airworthiness Directives; Airbus Airplanes
AGENCY: Federal Aviation Administration (FAA), Department of
Transportation (DOT).
ACTION: Final rule.
-----------------------------------------------------------------------
SUMMARY: We are superseding Airworthiness Directive (AD) 98-13-23 for
certain Airbus Model A300 B4-600, B4-600R, and F4-600R series
airplanes, and Model A300 C4-605R Variant F airplanes (collectively
called Model A300-600 series airplanes). AD 98-13-23 required
inspections to detect corrosion and cracking of the lower horizontal
stabilizer cutout longeron, the corner fitting, the skin strap, and the
outer skin; and repair, if necessary. This new AD reduces the
compliance times and repetitive intervals, and changes the inspection
procedures. This AD was prompted by the determination that the risk of
cracking is higher than initially determined. We are issuing this AD to
prevent cracking of the lower horizontal stabilizer cutout longeron,
the corner fitting, the skin strap, and the outer skin, which could
result in reduced structural integrity of the horizontal-stabilizer
cutout longeron.
DATES: This AD becomes effective August 28, 2015.
The Director of the Federal Register approved the incorporation by
reference of a certain publication listed in this AD as of August 28,
2015.
The Director of the Federal Register approved the incorporation by
reference of a certain other publication listed in this AD as of July
30, 1998 (63 FR 34576).
ADDRESSES: You may examine the AD docket on the Internet at <a href="http://www.regulations.gov/#!docketDetail">http://www.regulations.gov/#!docketDetail</a>;D=FAA-2014-0011; or in person at the
Docket Management Facility, U.S. Department of
[[Page 43932]]
Transportation, Docket Operations, M-30, West Building Ground Floor,
Room W12-140, 1200 New Jersey Avenue SE., Washington, DC.
For service information identified in this AD, contact Airbus SAS,
Airworthiness Office--EAW, 1 Rond Point Maurice Bellonte, 31707 Blagnac
Cedex, France; telephone +33 5 61 93 36 96; fax +33 5 61 93 44 51;
email <a href="/cdn-cgi/l/email-protection#d3b2b0b0bca6bda7fdb2baa1a4bca1a7bbfeb6b2a093b2baa1b1a6a0fdb0bcbe"><span class="__cf_email__" data-cfemail="177674747862796339767e65607865637f3a72766457767e657562643974787a">[email protected]</span></a>; Internet <a href="http://www.airbus.com">http://www.airbus.com</a>.
You may view this referenced service information at the FAA, Transport
Airplane Directorate, 1601 Lind Avenue SW., Renton, WA. For information
on the availability of this material at the FAA, call 425-227-1221. It
is also available on the Internet at <a href="http://www.regulations.gov">http://www.regulations.gov</a> by
searching for and locating Docket No. FAA-2014-0011.
FOR FURTHER INFORMATION CONTACT: Dan Rodina, Aerospace Engineer,
International Branch, ANM-116, Transport Airplane Directorate, FAA,
1601 Lind Avenue SW., Renton, WA 98057-3356; telephone 425-227-2125;
fax 425-227-1149.
SUPPLEMENTARY INFORMATION:
Discussion
We issued a notice of proposed rulemaking (NPRM) to amend 14 CFR
part 39 to supersede AD 98-13-23, Amendment 39-10614 (63 FR 34576, June
25, 1998). AD 98-13-23 applied to certain Airbus Model 300-600 series
airplanes. The NPRM published in the Federal Register on February 10,
2014 (79 FR 7592).
The European Aviation Safety Agency (EASA), which is the Technical
Agent for the Member States of the European Union, has issued EASA
Airworthiness Directive 2013-0048, dated March 4, 2013 (referred to
after this as the Mandatory Continuing Airworthiness Information, or
``the MCAI''), to correct an unsafe condition on certain Airbus Model
A300 B4-600, B4-600R, and F4-600R series airplanes, and Model A300 C4-
605R Variant F airplanes (collectively called Model A300-600 series
airplanes). The MCAI states:
During a full scale fatigue test, a crack was found at the lower
corner of the assembly of the horizontal stabilizer cut-out, between
Frame (FR)87 and FR89 and between Stringer (STGR)24 and STGR27, Left
Hand (LH) and Right Hand (RH) sides.
This condition, if not detected and corrected, could reduce the
structural integrity of the aeroplane.
DGAC [The Direction Generale de l'Aviation Civile France] France
issued AD * * * to require repetitive visual and High Frequency Eddy
Current (HFEC) rotating probe inspections of the affected areas and
subsequent corrective action, in case of cracks.
Since that [DGAC France] AD was issued, a fleet survey and
updated Fatigue and Damage Tolerance analyses have been performed to
substantiate the second A300-600 Extended Service Goal (ESG2)
exercise. The results of these analyses have shown that the risk of
cracks for these aeroplanes is higher than initially determined and
that, consequently, the thresholds and intervals must be reduced to
allow timely detection of these cracks and accomplishment of an
applicable corrective action.
For the reasons described above, this [EASA] AD retains the
requirements of DGAC France AD * * *, which is superseded, and
requires the accomplishment of these actions within the new
thresholds and intervals defined in Revision 03 of Airbus Service
Bulletin (SB) A300-53-6042 [dated August 30, 2012].
You may examine the MCAI in the AD docket on the Internet at <a href="http://www.regulations.gov/#!docketDetail">http://www.regulations.gov/#!docketDetail</a>;D=FAA-2014-0011-0002.
Comments
We gave the public the opportunity to participate in developing
this AD. The following presents the comments received on the NPRM (79
FR 7592, February 10, 2014) and the FAA's response to each comment.
Acknowledgement of the NPRM (79 FR 7592, February 10, 2014)
FedEx acknowledges the requirements of the NPRM (79 FR 7592,
February 10, 2014).
Request To Revise Compliance Times
UPS requested that we revise the compliance times in the proposed
AD (79 FR 7592, February 10, 2014) to reflect specific times regardless
of the aircraft utilization rate. UPS stated that a comment response in
AD 98-13-23, Amendment 39-10614 (63 FR 34576, June 25, 1998), noted
that the FAA did not concur with the ``average flight time'' (AFT)
compliance time methodology as it may not address the unsafe condition
in a timely manner. UPS stated that paragraph (h) of the proposed AD
specifies that the compliance time is at the applicable times specified
in paragraph 1.E. of Airbus Service Bulletin A300-53-6042, Revision 03,
dated August 30, 2012, which establishes the initial and repetitive
inspection compliance times based on AFT methodology. UPS requested
changing the compliance times in paragraph (h) of the proposed AD to
reflect specific values regardless of the aircraft utilization rate to
provide consistency in the compliance times for paragraphs (g) and (h)
of the proposed AD.
We disagree with the commenter's request to revise the compliance
times in this AD. At the time the FAA issued AD 98-13-23, Amendment 39-
10614 (63 FR 34576, June 25, 1998), the required actions in Airbus
Service Bulletin A300-53-6042, Revision 1, dated February 20, 1995,
contained inspection thresholds and intervals based on airplane flight
cycles, and provided instructions for adjusting the flight cycle
threshold and interval using each individual airplane's AFT
utilization. The FAA did not agree with the AFT method because it could
result in a different inspection threshold and interval for each
individual airplane, and the FAA did not agree with adjusting a flight
cycle based threshold and interval using the average flight time
utilization without also having a related flight hour based threshold
and interval. In Airbus Service Bulletin A300-53-6042, Revision 03,
dated August 30, 2012, the inspection thresholds and intervals are now
based on the accumulation of both flight cycles and flight hours, and
are listed in tables appropriately grouping airplanes with average
flight time utilization above 1.5 hours, and airplanes with average
flight time utilization at or below 1.5 hours. The changes made in
Airbus Service Bulletin A300-53-6042, Revision 03, dated August 30,
2012 have addressed the FAA's original concerns with the AFT method and
is acceptable for this AD.
We acknowledge that a fixed compliance time for a fleet could be
easier for operators to schedule and record compliance. Therefore,
under the provisions of paragraph (l)(1) of this AD, we will consider
requests for approval of an alternative method of compliance (AMOC) if
a proposal is submitted that is supported by technical data that
includes fatigue and damage tolerance analysis. We have not changed
this AD in this regard.
Request for Credit for Previous Cold Expansion
UPS requested that we allow credit for previous accomplishment of
cold expansion of the fastener holes. UPS stated that paragraph (h)(3)
of the proposed AD (79 FR 7592, February 10, 2014) requires cold
working fastener holes in accordance with Airbus Service Bulletin A300-
53-6042, Revision 03, dated August 30, 2012, if no cracking is found.
However, the fastener holes were previously cold worked as a
requirement of paragraph (c)(2) of AD 98-13-23, Amendment 39-10614 (63
FR 34576, June 25, 1998). UPS suggested that we add the phrase ``unless
previously accomplished'' to
[[Page 43933]]
the second sentence of paragraph (h)(3) of the proposed AD.
We agree with the request to give credit if fastener holes were
cold worked before the effective date of this AD. We have added a new
paragraph (k)(2) to this AD to give credit for cold working fastener
holes using Airbus Service Bulletin A300-53-6042, Revision 1, dated
February 20, 1995, which is referred to as the appropriate source of
service information for the actions in AD 98-13-23, Amendment 39-10614
(63 FR 34576, June 25, 1998); or Airbus Service Bulletin A300-53-6042,
Revision 02, dated April 28, 1998.
We have re-designated paragraph (k) of the proposed AD (79 FR 7592,
February 10, 2014) as paragraph (k)(1) of this AD. We also removed the
reference to Airbus Service Bulletin A300-53-6042, Revision 1, dated
February 20, 1995 from paragraph (k)(1) of this AD, which gives credit
for actions in paragraph (g) of this AD. Paragraph (g) of this AD
already refers Airbus Service Bulletin A300-53-6042, Revision 1, dated
February 20, 1995, as a source of service information.
Request To Remove Requirement To Refer to This AD in Repair Approvals
UPS also requested that we revise paragraph (i)(2) of the proposed
AD (79 FR 7592, February 10, 2014) to remove the requirement to include
the AD reference in repair approvals. UPS noted its concerns that the
proposal would require development of a unique Airbus process for U.S.
operators; that it could have significant financial and administrative
impacts to existing customer support agreements and different AD
records requirements within an operator's fleet; and that it will
increase requests for approval of AMOCs and result in delayed return to
service.
We concur with the commenter's request to remove from this AD the
requirement that repair approvals must specifically refer to this AD.
We have revised paragraph (i)(2) of this AD accordingly.
Since late 2006, we have included a standard paragraph titled
``Airworthy Product'' in all MCAI ADs in which the FAA develops an AD
based on a foreign authority's AD. The MCAI or referenced service
information in an FAA AD often directs the owner/operator to contact
the manufacturer for corrective actions, such as a repair. Briefly, the
Airworthy Product paragraph allowed owners/operators to use corrective
actions provided by the manufacturer if those actions were FAA-
approved. In addition, the paragraph stated that any actions approved
by the State of Design Authority (or its delegated agent) are
considered to be FAA-approved.
In the NPRM (79 FR 7592, February 10, 2014), we proposed to prevent
the use of repairs that were not specifically developed to correct the
unsafe condition, by requiring that the repair approval provided by the
State of Design Authority or its delegated agent specifically refer to
this FAA AD. This change was intended to clarify the method of
compliance and to provide operators with better visibility of repairs
that are specifically developed and approved to correct the unsafe
condition. In addition, we proposed to change the phrase ``its
delegated agent'' to include ``the Design Approval Holder (DAH) with a
State of Design Authority's design organization approval (DOA)'' to
refer to a DAH authorized to approve required repairs for the AD.
In its comments to the NPRM (79 FR 7592, February 10, 2014), UPS
stated the following: ``The proposed wording, being specific to
repairs, eliminates the interpretation that Airbus messages are
acceptable for approving minor deviations (corrective actions) needed
during accomplishment of an AD mandated Airbus service bulletin.''
This comment has made the FAA aware that some operators have
misunderstood or misinterpreted the Airworthy Product paragraph to
allow the owner/operator to use messages provided by the manufacturer
as approval of deviations during the accomplishment of an AD-mandated
action. The Airworthy Product paragraph does not approve messages or
other information provided by the manufacturer for deviations to the
requirements of the AD-mandated actions. The Airworthy Product
paragraph only addresses the requirement to contact the manufacturer
for corrective actions for the identified unsafe condition and does not
cover deviations from other AD requirements. However, deviations to AD-
required actions are addressed in 14 CFR 39.17, and anyone may request
the approval for an alternative method of compliance to the AD-required
actions using the procedures found in 14 CFR 39.19.
To address this misunderstanding and misinterpretation of the
Airworthy Product paragraph, we have changed that paragraph and
retitled it ``Contacting the Manufacturer.'' This paragraph now
clarifies that for any requirement in this AD to obtain corrective
actions from a manufacturer, the actions must be accomplished using a
method approved by the FAA, EASA, or Airbus's EASA DOA.
The Contacting the Manufacturer paragraph also clarifies that, if
approved by the DOA, the approval must include the DOA-authorized
signature. The DOA signature indicates that the data and information
contained in the document are EASA-approved, which is also FAA-
approved. Messages and other information provided by the manufacturer
that do not contain the DOA-authorized signature approval are not EASA-
approved, unless EASA directly approves the manufacturer's message or
other information.
This clarification does not remove flexibility afforded previously
by the Airworthy Product paragraph. Consistent with long-standing FAA
policy, such flexibility was never intended for required actions. This
is also consistent with the recommendation of the AD Implementation
Aviation Rulemaking Committee to increase flexibility in complying with
ADs by identifying those actions in manufacturers' service instructions
that are ``Required for Compliance'' with ADs. We continue to work with
manufacturers to implement this recommendation. But once we determine
that an action is required, any deviation from the requirement must be
approved as an alternative method of compliance.
Other commenters to an NPRM having Directorate Identifier 2012-NM-
101-AD (78 FR 78285, December 26, 2013) pointed out that in many cases
the foreign manufacturer's service bulletin and the foreign authority's
MCAI may have been issued some time before the FAA AD. Therefore, the
DOA may have provided U.S. operators with an approved repair, developed
with full awareness of the unsafe condition, before the FAA AD is
issued. Under these circumstances, to comply with the FAA AD, the
operator would be required to go back to the manufacturer's DOA and
obtain a new approval document, adding time and expense to the
compliance process with no safety benefit.
Based on these comments, we removed the requirement from this AD
that the DAH-provided repair specifically refer to this AD. Before
adopting such a requirement in the future, the FAA will coordinate with
affected DAHs and verify they are prepared to implement means to ensure
that their repair approvals consider the unsafe condition addressed in
an AD. Any such requirements will be adopted through the normal AD
rulemaking process, including notice-and-comment procedures, when
appropriate.
We have also decided not to include a generic reference to either
the
[[Page 43934]]
``delegated agent'' or the ``DAH with State of Design Authority design
organization approval,'' but instead we will provide the specific
delegation approval granted by the State of Design Authority for the
DAH.
Conclusion
We reviewed the available data, including the comments received,
and determined that air safety and the public interest require adopting
this AD with the changes described previously and minor editorial
changes. We have determined that these minor changes:
<bullet> Are consistent with the intent that was proposed in the
NPRM (79 FR 7592, February 10, 2014) for correcting the unsafe
condition; and
<bullet> Do not add any additional burden upon the public than was
already proposed in the NPRM (79 FR 7592, February 10, 2014).
Related Service Information Under 1 CFR Part 51
Airbus issued Service Bulletin A300-53-6042, Revision 03, dated
August 30, 2012. The service information describes procedures for an
inspection of the lower tail plane cut-out. This service information is
reasonably available because the interested parties have access to it
through their normal course of business or by the means identified in
the ADDRESSES section of this AD.
Costs of Compliance
We estimate that this AD affects 5 airplanes of U.S. registry.
The actions required by AD 98-13-23, Amendment 39-10614 (63 FR
34576, June 25, 1998), and retained in this AD take about 268 work-
hours per product, at an average labor rate of $85 per work-hour.
Required parts cost about $0 per product. Based on these figures, the
estimated cost of the actions that were required by AD 98-13-23 is
$22,780 per product.
We also estimate that it will take about 88 work-hours per product
to comply with the new basic requirements of this AD. The average labor
rate is $85 per work-hour. Required parts will cost about $0 per
product. Based on these figures, we estimate the cost of this AD on
U.S. operators to be $37,400, or $7,480 per product per inspection
cycle.
In addition, we estimate that any necessary follow-on actions will
take about 155 work-hours and require parts costing $0, for a cost of
$13,175 per product. We have no way of determining the number of
aircraft that might need this action.
Authority for This Rulemaking
Title 49 of the United States Code specifies the FAA's authority to
issue rules on aviation safety. Subtitle I, section 106, describes the
authority of the FAA Administrator. ``Subtitle VII: Aviation
Programs,'' describes in more detail the scope of the Agency's
authority.
We are issuing this rulemaking under the authority described in
``Subtitle VII, Part A, Subpart III, Section 44701: General
requirements.'' Under that section, Congress charges the FAA with
promoting safe flight of civil aircraft in air commerce by prescribing
regulations for practices, methods, and procedures the Administrator
finds necessary for safety in air commerce. This regulation is within
the scope of that authority because it addresses an unsafe condition
that is likely to exist or develop on products identified in this
rulemaking action.
Regulatory Findings
We determined that this AD will not have federalism implications
under Executive Order 13132. This AD will not have a substantial direct
effect on the States, on the relationship between the national
government and the States, or on the distribution of power and
responsibilities among the various levels of government.
For the reasons discussed above, I certify that this AD:
1. Is not a ``significant regulatory action'' under Executive Order
12866;
2. Is not a ``significant rule'' under the DOT Regulatory Policies
and Procedures (44 FR 11034, February 26, 1979);
3. Will not affect intrastate aviation in Alaska; and
4. Will not have a significant economic impact, positive or
negative, on a substantial number of small entities under the criteria
of the Regulatory Flexibility Act.
Examining the AD Docket
You may examine the AD docket on the Internet at <a href="http://www.regulations.gov/#!docketDetail">http://www.regulations.gov/#!docketDetail</a>;D=FAA-2014-0011; or in person at the
Docket Management Facility between 9 a.m. and 5 p.m., Monday through
Friday, except Federal holidays. The AD docket contains this AD, the
regulatory evaluation, any comments received, and other information.
The street address for the Docket Operations office (telephone 800-647-
5527) is in the ADDRESSES section.
List of Subjects in 14 CFR Part 39
Air transportation, Aircraft, Aviation safety, Incorporation by
reference, Safety.
Adoption of the Amendment
Accordingly, under the authority delegated to me by the
Administrator, the FAA amends 14 CFR part 39 as follows:
PART 39--AIRWORTHINESS DIRECTIVES
0
1. The authority citation for part 39 continues to read as follows:
Authority: 49 U.S.C. 106(g), 40113, 44701.
Sec. 39.13 [Amended]
0
2. The FAA amends Sec. 39.13 by removing Airworthiness Directive (AD)
98-13-23, Amendment 39-10614 (63 FR 34576, June 25, 1998), and adding
the following new AD:
2015-13-07 Airbus: Amendment 39-18194. Docket No. FAA-2014-0011;
Directorate Identifier 2013-NM-046-AD.
(a) Effective Date
This AD becomes effective August 28, 2015.
(b) Affected ADs
This AD replaces AD 98-13-23, Amendment 39-10614 (63 FR 34576,
June 25, 1998).
(c) Applicability
This AD applies to Airbus Model A300 B4-601, B4-603, B4-620, and
B4-622 airplanes; Model A300 B4-605R and B4-622R airplanes; Model
A300 F4-605R and F4-622R airplanes; and Model A300 C4-605R Variant F
airplanes; certificated in any category; on which Airbus
Modification 6146 has not been installed.
(d) Subject
Air Transport Association (ATA) of America Code 53, Fuselage.
(e) Reason
This AD was prompted by reports of cracking found at the lower
corner of the horizontal stabilizer cutout longeron during a full
scale fatigue test, and a determination that the risk of cracking is
higher than initially determined. We are issuing this AD to prevent
cracking of the lower horizontal stabilizer cutout longeron, the
corner fitting, the skin strap, and the outer skin, which could
result in reduced structural integrity of the horizontal-stabilizer
cutout longeron.
(f) Compliance
Comply with this AD within the compliance times specified,
unless already done.
(g) Retained Inspections and Corrective Actions
This paragraph restates the requirements of paragraphs (a), (b),
(c), (d), and (e) of AD 98-13-23, Amendment 39-10614 (63 FR 34576,
[[Page 43935]]
June 25, 1998), with revised service information.
(1) Prior to the accumulation of 18,000 total landings, or
within 2,000 landings after July 30, 1998 (the effective date of AD
98-13-23, Amendment 39-10614 (63 FR 34576, June 25, 1998), whichever
occurs later: Perform a visual and eddy current inspection to detect
cracks and/or corrosion of Areas 1 and 2 of the lower horizontal
stabilizer cutout longeron, in accordance with Airbus Service
Bulletin A300-53-6042, Revision 1, dated February 20, 1995; or the
Accomplishment Instructions of Airbus Service Bulletin A300-53-6042,
Revision 03, dated August 30, 2012. As of the effective date of this
AD, use only Airbus Service Bulletin A300-53-6042, Revision 03,
dated August 30, 2012, to do the actions required by this paragraph.
(2) At the later of the times specified in paragraphs (g)(2)(i)
and (g)(2)(ii) of this AD: Perform a visual and an eddy current
inspection to detect cracks and corrosion of Area 3 of the lower
horizontal stabilizer cutout longeron, in accordance with Airbus
Service Bulletin A300-53-6042, Revision 1, dated February 20, 1995;
or the Accomplishment Instructions of Airbus Service Bulletin A300-
53-6042, Revision 03, dated August 30, 2012. As of the effective
date of this AD, use only Airbus Service Bulletin A300-53-6042,
Revision 03, dated August 30, 2012, to do the actions required by
this paragraph.
(i) Prior to the accumulation of 24,000 total landings, but not
before the accumulation of 18,000 total landings; or
(ii) Prior to the accumulation of 2,000 landings after July 30,
1998 (the effective date of AD 98-13-23, Amendment 39-10614 (63 FR
34576, June 25, 1998)).
(3) If no cracking is detected during any inspection required by
paragraph (g)(1) or (g)(2) of this AD: Before further flight, cold
work and ream the vacated fastener holes, in accordance with Airbus
Service Bulletin A300-53-6042, Revision 1, dated February 20, 1995;
or the Accomplishment Instructions of Airbus Service Bulletin A300-
53-6042, Revision 03, dated August 30, 2012; and perform the
requirements of paragraph (g)(3)(i) or (g)(3)(ii) of this AD, as
applicable. As of the effective date of this AD, use only Airbus
Service Bulletin A300-53-6042, Revision 03, dated August 30, 2012,
to do the actions required by this paragraph.
(i) For airplanes on which no cracking is found in Area 1 or 2:
Repeat the inspections required by paragraph (g)(1) of this AD
thereafter at intervals not to exceed 6,000 flight cycles.
(ii) For airplanes on which no cracking is found in Area 3:
Perform the various follow-on actions in accordance with Airbus
Service Bulletin A300-53-6042, Revision 1, dated February 20, 1995;
or the Accomplishment Instructions of Airbus Service Bulletin A300-
53-6042, Revision 03, dated August 30, 2012. (The follow-on actions
include installing a new corner fitting, installing a new longeron,
and performing a cold working procedure.) After accomplishment of
these follow-on actions, no further action is required by this AD.
After the effective date of this AD, use only Airbus Service
Bulletin A300-53-6042, Revision 03, dated August 30, 2012, to do the
actions required by this paragraph.
(4) If any cracking is detected during any inspection required
by paragraph (g)(1) or (g)(2) of this AD, perform the requirements
of paragraph (g)(4)(i) or (g)(4)(ii) of this AD, as applicable.
(i) If any cracking is found in Area 1 or 3 that is within the
limits specified in Airbus Service Bulletin A300-53-6042, Revision
1, dated February 20, 1995; or Airbus Service Bulletin A300-53-6042,
Revision 03, dated August 30, 2012: Before further flight, repair in
accordance with Airbus Service Bulletin A300-53-6042, Revision 1,
dated February 20, 1995; or the Accomplishment Instructions of
Airbus Service Bulletin A300-53-6042, Revision 03, dated August 30,
2012. As of the effective date of this AD, use only Airbus Service
Bulletin A300-53-6042, Revision 03, dated August 30, 2012, to do the
actions required by this paragraph.
(ii) If any cracking is found in Area 2, or if any cracking is
found in any area and that cracking is beyond the limits described
in Airbus Service Bulletin A300-53-6042, Revision 1, dated February
20, 1995; or Airbus Service Bulletin A300-53-6042, Revision 03,
dated August 30, 2012: Before further flight, repair using a method
approved by the Manager, International Branch, ANM-116, Transport
Airplane Directorate, FAA; or the European Aviation Safety Agency
(EASA), or Airbus's EASA Design Organization Approval (DOA).
(5) If any corrosion is detected during any inspection required
by paragraph (g) of this AD, prior to further flight, repair the
corrosion, in accordance with Airbus Service Bulletin A300-53-6042,
Revision 1, dated February 20, 1995; or the Accomplishment
Instructions of Airbus Service Bulletin A300-53-6042, Revision 03,
dated August 30, 2012. As of the effective date of this AD, use only
Airbus Service Bulletin A300-53-6042, Revision 03, dated August 30,
2012, to do the actions required by this paragraph.
(h) New Inspections
At the applicable times specified in paragraph 1.E.,
``Compliance,'' of Airbus Service Bulletin A300-53-6042, Revision
03, dated August 30, 2012, except as provided by paragraphs (j)(1)
and (j)(2) of this AD: Do the actions specified in paragraphs
(h)(1), (h)(2), and (h)(3) of this AD, in accordance with the
Accomplishment Instructions of Airbus Service Bulletin A300-53-6042,
Revision 03, dated August 30, 2012. Repeat the inspections,
thereafter, at the applicable intervals specified in paragraph 1.E.,
``Compliance,'' of Airbus Service Bulletin A300-53-6042, Revision
03, dated August 30, 2012. Doing the initial inspections required by
paragraph (h) of this AD and applicable corrective actions required
by paragraph (i) of this AD terminates the requirements of paragraph
(g) of this AD.
(1) Do a general visual inspection for cracking and corrosion of
the lower horizontal stabilizer cut-out longeron, the corner
fitting, the skin strap, and the skin between frame (FR)87 and FR89
and between stringers (STGR)24 and STGR27, left- and right-hand
sides.
(2) Do a high frequency eddy current (HFEC) inspection for
cracking of the flanges of the lower corner fittings and the edges
of the outer skin and the edges of the longeron, the skin strap, and
the skin at the run-out of the corner fitting above the last eight
fasteners.
(3) Do a rotating probe inspection for cracking of the fastener
holes. If no cracking is found during the rotating probe inspection,
before further flight, do a cold expansion of the fastener holes, in
accordance with the Accomplishment Instructions of Airbus Service
Bulletin A300-53-6042, Revision 03, dated August 30, 2012.
(i) New Corrective Actions
(1) If any corrosion is found during any inspection required by
paragraph (h) of this AD, before further flight, repair, in
accordance with the Accomplishment Instructions of Airbus Service
Bulletin A300-53-6042, Revision 03, dated August 30, 2012.
(2) If any cracking is found during any inspection required by
paragraph (h) of this AD, before further flight, repair in
accordance with the Accomplishment Instructions of Airbus Service
Bulletin A300-53-6042, Revision 03, dated August 30, 2012, except
where Airbus Service Bulletin A300-53-6042, Revision 03, dated
August 30, 2012, specifies to contact Airbus, before further flight,
repair using a method approved by the Manager, International Branch,
ANM-116, Transport Airplane Directorate, FAA; or EASA, or Airbus's
EASA DOA.
(j) Exception
(1) Where Airbus Service Bulletin A300-53-6042, Revision 03,
dated August 30, 2012, specifies a grace period of 1950 flight
cycles or 4100 flight hours, this AD specifies the grace period
after the effective date of this AD.
(2) Where Airbus Service Bulletin A300-53-6042, Revision 03,
dated August 30, 2012, specifies a compliance time ``after receipt
of this service bulletin,'' this AD requires compliance within the
specified compliance time after the effective date of this AD.
(k) Credit for Previous Actions
(1) This paragraph provides credit for the corresponding actions
required by paragraph (g) of this AD, if those actions were
performed before the effective date of this AD using Airbus Service
Bulletin A300-53-6042, Revision 02, dated April 28, 1998, which is
not incorporated by reference in this AD.
(2) This paragraph provides credit for the corresponding actions
required by paragraph (h)(3) of this AD, if those actions were
performed before the effective date of this AD using Airbus Service
Bulletin A300-53-6042, Revision 1, dated February 20, 1995, which
was incorporated by reference in AD 98-13-23, Amendment 39-10614 (63
FR 34576, June 25, 1998), and continues to be incorporated by
reference in this AD; or Airbus Service Bulletin A300-53-6042,
Revision 02, dated April 28, 1998, which is not incorporated by
reference in this AD.
(l) Other FAA AD Provisions
The following provisions also apply to this AD:
(1) Alternative Methods of Compliance (AMOCs): The Manager,
International Branch, ANM-116, Transport Airplane
[[Page 43936]]
Directorate, FAA, has the authority to approve AMOCs for this AD, if
requested using the procedures found in 14 CFR 39.19. In accordance
with 14 CFR 39.19, send your request to your principal inspector or
local Flight Standards District Office, as appropriate. If sending
information directly to the International Branch, send it to ATTN:
Dan Rodina, Aerospace Engineer, International Branch, ANM-116,
Transport Airplane Directorate, FAA, 1601 Lind Avenue SW., Renton,
WA 98057-3356; telephone 425-227-2125; fax 425-227-1149. Information
may be emailed to: <a href="/cdn-cgi/l/email-protection#93aabed2dddebea2a2a5bed2dedcd0bec1d6c2c6d6c0c7c0d3f5f2f2bdf4fce5"><span class="__cf_email__" data-cfemail="023b2f434c4f2f3333342f434f4d412f5047535747515651426463632c656d74">[email protected]</span></a>.
(i) Before using any approved AMOC, notify your appropriate
principal inspector, or lacking a principal inspector, the manager
of the local flight standards district office/certificate holding
district office. The AMOC approval letter must specifically
reference this AD.
(ii) AMOCs approved for AD 98-13-23, Amendment 39-10614 (63 FR
34576, June 25, 1998), are approved as AMOCs for the corresponding
requirements of this AD.
(2) Contacting the Manufacturer: As of the effective date of
this AD, for any requirement in this AD to obtain corrective actions
from a manufacturer, the action must be accomplished using a method
approved by the Manager, International Branch, ANM-116, Transport
Airplane Directorate, FAA; or the EASA; or Airbus's EASA DOA. If
approved by the DOA, the approval must include the DOA-authorized
signature.
(m) Related Information
(1) Refer to Mandatory Continuing Airworthiness Information
(MCAI) EASA Airworthiness Directive 2013-0048, dated March 4, 2013,
for related information. This MCAI may be found in the AD docket on
the Internet at <a href="http://www.regulations.gov">http://www.regulations.gov</a> by searching for and
locating Docket No. FAA-2014-0011.
(2) Service information identified in this AD that is not
incorporated by reference in this AD is available at the addresses
specified in paragraphs (n)(5) and (n)(6) of this AD.
(n) Material Incorporated by Reference
(1) The Director of the Federal Register approved the
incorporation by reference (IBR) of the service information listed
in this paragraph under 5 U.S.C. 552(a) and 1 CFR part 51.
(2) You must use this service information as applicable to do
the actions required by this AD, unless this AD specifies otherwise.
(3) The following service information was approved for IBR on
August 28, 2015.
(i) Airbus Service Bulletin A300-53-6042, Revision 03, dated
August 30, 2012.
(ii) Reserved.
(4) The following service information was approved for IBR on
July 30, 1998 (63 FR 34576, June 25, 1998).
(i) Airbus Service Bulletin A300-53-6042, Revision 1, dated
February 20, 1995.
(ii) Reserved.
(5) For service information identified in this AD, contact
Airbus SAS, Airworthiness Office--EAW, 1 Rond Point Maurice
Bellonte, 31707 Blagnac Cedex, France; telephone +33 5 61 93 36 96;
fax +33 5 61 93 44 51; email <a href="/cdn-cgi/l/email-protection#c4a5a7a7abb1aab0eaa5adb6b3abb6b0ace9a1a5b784a5adb6a6b1b7eaa7aba9"><span class="__cf_email__" data-cfemail="056466666a706b712b646c77726a77716d2860647645646c776770762b666a68">[email protected]</span></a>;
Internet <a href="http://www.airbus.com">http://www.airbus.com</a>.
(6) You may view this service information at the FAA, Transport
Airplane Directorate, 1601 Lind Avenue SW., Renton, WA. For
information on the availability of this material at the FAA, call
425-227-1221.
(7) You may view this service information that is incorporated
by reference at the National Archives and Records Administration
(NARA). For information on the availability of this material at
NARA, call 202-741-6030, or go to: <a href="http://www.archives.gov/federal-register/cfr/ibr-locations.html">http://www.archives.gov/federal-register/cfr/ibr-locations.html</a>.
Issued in Renton, Washington, on June 17, 2015.
Michael Kaszycki,
Acting Manager, Transport Airplane Directorate, Aircraft Certification
Service.
[FR Doc. 2015-17934 Filed 7-23-15; 8:45 am]
BILLING CODE 4910-13-P
Source: Official FAA Source ↗
Retrieved: Apr 6, 2026
Rights: U.S. Government Public Domain
This site is not affiliated with or endorsed by the FAA. Always verify with official sources.