AD 2006-24-01

Recurring final rule
Data completeness: 80%

Airworthiness Directives; Cessna Model 750 Airplanes

AD Number
2006-24-01
Status
final_rule
Effective Date
Product Category
aircraft
Docket
Docket No. FAA-2006-26352
FR Citation
71 FR 67295

Applicability

TypeManufacturerModelDetails
aircraft Cessna 750 Airworthiness Directives; Cessna Model 750 Airplanes

Unsafe Condition

Interference between the APU fuel tube assembly and elevator flight control cables, hydraulic lines, and high-temperature bleed air couplings can cause chafing, leading to fuel leaking into the tail cone area where ignition sources are present, and possible fire in an area without fire detection or extinguishing provisions.

AI-generated summary from the source AD text. Verify against the official source before acting.

Required Actions

Inspect for clearance and chafing of the APU fuel tube assembly in the tail cone area, and take corrective actions if necessary. Operators may also modify the APU fuel line by installing new fuel lines, fairleads, and clamping configurations as an optional terminating action for the repetitive inspections.

AI-generated summary from the source AD text. Verify against the official source before acting.

Compliance Time

Within 50 flight hours after the effective date of this AD.

AI-generated summary from the source AD text. Verify against the official source before acting.

Affected Aircraft

Cessna Model 750 airplanes, including additional airplanes subject to the existing requirements in AD 2005-09-01.

AI-generated summary from the source AD text. Verify against the official source before acting.

Source: Official FAA Source ↗

Retrieved: Apr 4, 2026

Rights: U.S. Government Public Domain

This site is not affiliated with or endorsed by the FAA. Always verify with official sources.