AD 2003-25-04
Applicability
| Type | Manufacturer | Model | Details |
|---|---|---|---|
| aircraft | Airbus | A319 | Airworthiness Directives; Airbus Model A319, A320, and A321 Series Airplanes |
Unsafe Condition
Ignition sources and consequent fire/explosion in the fuel tank due to insufficient bonding and modification of fuel pipe couplings.
AI-generated summary from the source AD text. Verify against the official source before acting.
Required Actions
Modify fuel pipe couplings and install bonding leads in specified locations within the fuel tank. For certain airplanes, install an additional bonding lead and perform an electrical resistance check. For airplanes with an additional center fuel tank, modify the fuel system of the tank and perform an electrical resistance check.
AI-generated summary from the source AD text. Verify against the official source before acting.
Compliance Time
Within 36 months after August 28, 2000, for the restatement of AD 2000-14-15. Within 36 months after the effective date of this AD for additional bonding lead installation. Within 20 months after the effective date of this AD for modifications to the additional center fuel tank.
AI-generated summary from the source AD text. Verify against the official source before acting.
Affected Aircraft
Airbus Model A319, A320, and A321 series airplanes, certificated in any category, excluding those on which Airbus Modifications 27150, 27955, and 27472 have been installed.
AI-generated summary from the source AD text. Verify against the official source before acting.
Source: Official FAA Source ↗
Retrieved: Apr 6, 2026
Rights: U.S. Government Public Domain
This site is not affiliated with or endorsed by the FAA. Always verify with official sources.