Airworthiness Directives; Beech Model AT-11 Airplanes
Abstract
Generator Relay Control Switch
Document Text
AD Final Rules - DRS_47-30-06.html Copy URL Print/Save as PDF Document Versions Feedback Details AD Number: 47-30-06 Document Type: AD Final Rules Docket Number: Unknown Subject Heading: Airworthiness Directives; Beech Model AT-11 Airplanes Subject: Generator Relay Control Switch Status: Current Citation: This information is not available. Citation Publish Date: Effective Date: Make: Textron Aviation Inc. Model: Army AT-11 Product Type: Aircraft Product Subtype: Small Airplane Affected AD: Superseded AD: Affected By: Superseded By: Service/Office: Office of Primary Responsibility: CFR Part Reference: Part 39 Comments: AIRWORTHINESS DIRECTIVES FINAL RULES: 47-30-06 CITATION: This information is not available. PAGE NUMBER: DOCKET NUMBER: Unknown AMENDMENT: AD NUMBER: 47-30-06 SUBJECT HEADING: Airworthiness Directives; Beech Model AT-11 Airplanes ACTION: SUMMARY: DATES: ADDRESSES: FOR FURTHER INFORMATION CONTACT: SUPPLEMENTARY INFORMATION: REGULATORY TEXT: 47-30-06 BEECH: (Was Mandatory Note 2 of AD-2-582-2.) Applies Only to AT-11 Airplanes Equipped With M-3 Generators Which Do Not Have Three-Pole-Single-Throw Relays Installed for Generator Control. To be accomplished prior to certification or, if certificated, on next periodic inspection but not later than October 1, 1947. In accordance with Figure 1 install a three-pole-single-throw relay, General Electric No. CR2791-B100G3 or equivalent, for the control of each generator. The operating coil of the left generator relay should be controlled by a single-pole-single- throw "ON-OFF" switch mounted on the pilot's control panel adjacent to the left battery switch, and should be labeled "LEFT GEN. SW.". The operating coil of the right generator relay should be controlled by a single-pole-single-throw "ON-OFF" switch mounted on the pilot's control panel adjacent to the right battery switch and should be labeled "RIGHT GEN. SW.". The battery and generator switches should be located adjacent to each other in the order shown on Figure 1, and should be provided with a suitable gangbar such that pilot can throw the four switches to the "OFF" position in a single operation. The generator control relays may be mounted in any convenient junction box or in a separate box provided therefore. Choice of relay location should be such that the length of generator field leads are kept to a minimum. FOOTER:
Source: Official FAA Source ↗
Retrieved: Apr 8, 2026
Rights: U.S. Government Public Domain
This site is not affiliated with or endorsed by the FAA. Always verify with official sources.