Airworthiness Directives; Gulfstream American (Formerly Grumman American Aviation Corporation) Model GA-7 Airplanes

Document Number
79-05-06
Type
ad
Published
N/A
Effective
March 9, 1979
Status
active
Rights
U.S. Government Public Domain

Abstract

Chafing and Leakage of Main Fuel Line

Document Text

AD Final Rules - DRS_79-05-06.html
Copy URL
Print/Save as PDF
Document Versions
 Feedback
Details
AD Number:
79-05-06
Document Type:
AD Final Rules
Docket Number:
Unknown
Subject Heading:
Airworthiness Directives; Gulfstream American (Formerly Grumman American Aviation Corporation) Mode...Show more
Subject:
Chafing and Leakage of Main Fuel Line
Status:
Current
Citation:
This information is not available.
Citation Publish Date:
Effective Date:
03/09/1979
Make:
SOCATA - Groupe Aerospatiale
Model:
GA-7
Product Type:
Aircraft
Product Subtype:
Small Airplane
Affected AD:
Superseded AD:
Affected By:
Superseded By:
Service/Office:
Office of Primary Responsibility:
CFR Part Reference:
Part 39
Comments:
AIRWORTHINESS DIRECTIVES FINAL RULES: 79-05-06
CITATION:   This information is not available.

PAGE NUMBER:  

DOCKET NUMBER:   Unknown

AMENDMENT:   39-3423

AD NUMBER:   79-05-06

SUBJECT HEADING:   Airworthiness Directives; Gulfstream American (Formerly Grumman American Aviation Corporation) Model GA-7 Airplanes

ACTION:  

SUMMARY:  

DATES:   Effective March 9, 1979.

ADDRESSES:  

FOR FURTHER INFORMATION CONTACT:  

SUPPLEMENTARY INFORMATION:  

REGULATORY TEXT:  
79-05-06 GULFSTREAM AMERICAN (Formerly Grumman American Aviation Corporation): Amendment 39-3423. Applies to Model GA-7 airplanes, certificated in all categories, serial numbers GA-7-0001 through GA-7-0076.

Compliance is required within the next 25 hours' time in service after the effective date of this AD, unless already accomplished.

To prevent chafing, and possible leakage, of the main fuel feed line by the propeller control cable behind the firewall in the left hand engine nacelle, accomplish the following:

(a) Within the next 25 hours' time in service, after the effective date of this AD, determine the clearance between the main fuel line and the propeller control cable in accordance with Gulfstream American Service Bulletin ME-14, dated December 23, 1978, or later revision approved by the Chief, Engineering and Manufacturing Branch, FAA Southern Region.

(b) If the clearance measured is less than one-half inch, replace the fuel line before further flight.

(c) If the clearance measured is one-half inch or greater, replace the fuel line not later than 100 hours' time in service after the effective date of this AD.

(d) Equivalent methods of compliance with this AD may be acceptable if approved by the Chief, Engineering and Manufacturing Branch, FAA, Southern Region.

(e) Airplanes may be flown in accordance with FAR 21.197 to a location where the needed inspection and work required by this AD can be accomplished.

This amendment becomes effective March 9, 1979.

FOOTER:

Source: Official FAA Source ↗

Retrieved: Apr 8, 2026

Rights: U.S. Government Public Domain

This site is not affiliated with or endorsed by the FAA. Always verify with official sources.