Airworthiness Directives; BOEING Model 727 Series Airplanes

Document Number
88-20-07
Type
ad
Published
N/A
Effective
November 1, 1988
Status
active
Rights
U.S. Government Public Domain

Abstract

Pivot Trunnion

Document Text

AD Final Rules - DRS_88-20-07.html
Copy URL
Print/Save as PDF
Document Versions
 Feedback
Details
AD Number:
88-20-07
Document Type:
AD Final Rules
Docket Number:
Unknown
Subject Heading:
Airworthiness Directives; BOEING Model 727 Series Airplanes
Subject:
Pivot Trunnion
Status:
Current
Citation:
This information is not available.
Citation Publish Date:
Effective Date:
11/01/1988
Make:
The Boeing Company
Model:
727-100 Series | 727-100C Series | 727-200 Series | 727-200F Series | 727 Series | 727C Series
Product Type:
Aircraft
Product Subtype:
Large Airplane
Affected AD:
Superseded AD:
Affected By:
Superseded By:
Service/Office:
Office of Primary Responsibility:
CFR Part Reference:
Part 39
Comments:
AIRWORTHINESS DIRECTIVES FINAL RULES: 88-20-07
CITATION:   This information is not available.

PAGE NUMBER:  

DOCKET NUMBER:   Unknown

AMENDMENT:   39-6024

AD NUMBER:   88-20-07

SUBJECT HEADING:   Airworthiness Directives; BOEING Model 727 Series Airplanes

ACTION:  

SUMMARY:  

DATES:   Effective November 1, 1988.

ADDRESSES:  

FOR FURTHER INFORMATION CONTACT:  

SUPPLEMENTARY INFORMATION:  

REGULATORY TEXT:  
88-20-07 BOEING: Amendment 39-6024. Applies to all Model 727 series airplanes, certificated in any category.

Compliance required as indicated, unless previously accomplished.

To prevent jamming of the main landing gear door actuator caused by fracturing of the pivot trunnion, accomplish the following:

A. Within the next 1,600 flight cycles after the effective date of this AD, accomplish the visual inspection of the main landing gear door actuator pivots in accordance with Boeing Service Bulletin 727-32-0358, dated May 31, 1988. Repeat this inspection at intervals not to exceed 800 flight cycles.

B. If any of the pivot trunnion shafts are found loose or missing during the inspection performed in accordance with paragraph A., above, prior to further flight, replace the pivot in accordance with Boeing Service Bulletin 727-32-0358, dated May 31, 1988.

C. Accomplishing the pivot replacement with a part number 3-3141-54 pivot, in accordance with Sargent Controls Service Bulletin 7-3141-32-06, Revision 1, dated November 2, 1987, constitutes terminating action for the initial and repetitive inspections required by paragraph A., above.

D. An alternate means of compliance or adjustment of the compliance time, which provides an acceptable level of safety, may be used when approved by the Manager, Seattle Aircraft Certification Office, FAA, Northwest Mountain Region.

NOTE: The request should be forwarded through an FAA Principal Maintenance Inspector (PMI), who may add any comments and then send it to the Manager, Seattle Aircraft Certification Office.

All persons affected by this directive who have not already received the appropriate service documents from the manufacturer may obtain copies upon request to Boeing Commercial Airplanes, P.O. Box 3707, Seattle, Washington, 98124. These documents may be examined at the FAA, Northwest Mountain Region, 17900 Pacific Highway South, Seattle, Washington or Seattle Aircraft Certification Office, FAA, Northwest Mountain Region, 9010 East Marginal Way South, Seattle, Washington.

This Amendment, 39-6024, becomes effective November 1, 1988.

FOOTER:

Source: Official FAA Source ↗

Retrieved: Apr 8, 2026

Rights: U.S. Government Public Domain

This site is not affiliated with or endorsed by the FAA. Always verify with official sources.