Airworthiness Directives; Fairchild All Model F-27 Series Aircraft

Document Number
59-12-01
Type
ad
Published
N/A
Effective
N/A
Status
active
Rights
U.S. Government Public Domain

Abstract

Combustion Heater Inspection

Document Text

AD Final Rules - DRS_59-12-01.html
Copy URL
Print/Save as PDF
Document Versions
 Feedback
Details
AD Number:
59-12-01
Document Type:
AD Final Rules
Docket Number:
Unknown
Subject Heading:
Airworthiness Directives; Fairchild All Model F-27 Series Aircraft
Subject:
Combustion Heater Inspection
Status:
Current
Citation:
This information is not available.
Citation Publish Date:
Effective Date:
Make:
Maryland Air Industries, Inc.
Model:
F-27 | F-27A | F-27B | F-27F | F-27G | F-27J | F-27M
Product Type:
Aircraft
Product Subtype:
Large Airplane
Affected AD:
Superseded AD:
Affected By:
Superseded By:
Service/Office:
Office of Primary Responsibility:
CFR Part Reference:
Part 39
Comments:
AIRWORTHINESS DIRECTIVES FINAL RULES: 59-12-01
CITATION:   This information is not available.

PAGE NUMBER:  

DOCKET NUMBER:   Unknown

AMENDMENT:  

AD NUMBER:   59-12-01

SUBJECT HEADING:   Airworthiness Directives; Fairchild All Model F-27 Series Aircraft

ACTION:  

SUMMARY:  

DATES:  

ADDRESSES:  

FOR FURTHER INFORMATION CONTACT:  

SUPPLEMENTARY INFORMATION:  

REGULATORY TEXT:  
59-12-01 FAIRCHILD: Applies to all F-27 Series aircraft equipped with the heater system.

Compliance required by July 15, 1959, and every 100 hours thereafter until forthcoming permanent fix is incorporated.

(1) An incident has been reported in which a loose "B" nut on the fuel line connection to the combustion heater fuel control unit caused fuel to leak out around the shroud. In order to preclude possibilities of leakage at the heater fuel system fittings, remove and retain shroud assemblies, P/N 27-774575-1, attached to tube assemblies, P/N's 27-683051-151 or -251 and 27-774512-11, connected to fuel control assembly, P/N 43C80. Also remove and retain shroud assembly, P/N 27-774575-1, attached to opposite end of tube assembly, P/N 27-774512-11, connected to heater assembly, P/N 49C65.

(2) At locations where shrouds were removed, inspect and determine that fittings of tube assemblies are torqued to proper values and no evidence of fuel leakage exists. Torque fittings of tube assembly, P/N 27-774512-11 to 135 in. lbs. min. - 150 in. lbs. max., and tube assembly P/N 27-683051-151 or -251 to 40 in. lbs. min. - 65 in. lbs. max.

(3) Operate heater to determine that no evidence of fuel leakage exists at tube assembly connections to fuel control and heater assemblies and reinstall shroud assemblies.

(Fairchild F-27 Service Bulletin No. 21-48 dated April 22, 1959, covers this same subject.)

FOOTER:

Source: Official FAA Source ↗

Retrieved: Apr 8, 2026

Rights: U.S. Government Public Domain

This site is not affiliated with or endorsed by the FAA. Always verify with official sources.