Airworthiness Directives; DOUGLAS C54-DC and DC-4

Document Number
48-12-02
Type
ad
Published
N/A
Effective
N/A
Status
active
Rights
U.S. Government Public Domain

Abstract

Nose And Cabin Heater Rework

Document Text

AD Final Rules - DRS_48-12-02.html
Copy URL
Print/Save as PDF
Document Versions
 Feedback
Details
AD Number:
48-12-02
Document Type:
AD Final Rules
Docket Number:
Unknown
Subject Heading:
Airworthiness Directives; DOUGLAS C54-DC and DC-4
Subject:
Nose And Cabin Heater Rework
Status:
Current
Citation:
This information is not available.
Citation Publish Date:
Effective Date:
Make:
The Boeing Company
Model:
C54-DC | C54A-DC | C54B-DC | C54D-DC | C54E-DC | C54G-DC | DC-4
Product Type:
Aircraft
Product Subtype:
Large Airplane
Affected AD:
Superseded AD:
Affected By:
Superseded By:
Service/Office:
Office of Primary Responsibility:
CFR Part Reference:
Part 39
Comments:
AIRWORTHINESS DIRECTIVES FINAL RULES: 48-12-02
CITATION:   This information is not available.

PAGE NUMBER:  

DOCKET NUMBER:   Unknown

AMENDMENT:  

AD NUMBER:   48-12-02

SUBJECT HEADING:   Airworthiness Directives; DOUGLAS C54-DC and DC-4

ACTION:  

SUMMARY:  

DATES:  

ADDRESSES:  

FOR FURTHER INFORMATION CONTACT:  

SUPPLEMENTARY INFORMATION:  

REGULATORY TEXT:  
48-12-02 DOUGLAS: Applies to All C54-DC Serial and the Following DC-4 Airplanes: 42904 Through 42943, 42948 Through 42952, 42982 Through 42996, 43065 Through 43068, 43071, 43072, 43093, 43094, and 43102.

To be accomplished not later than the date established in accordance with the provisions of Special Civil Air Regulation Serial Number SR-329, or any subsequent regulation affecting this compliance date.

As a result of investigation of heater fires, the following changes are to be accomplished in the nose and cabin heater installation:

1. Install steel firewall at Station 260 (cabin forward bulkhead) from ceiling level to top of bulkhead to provide isolation between heater compartment and the space between cabin ceiling and top of fuselage. Also, replace present wood panels under heaters with metal panels.

(Douglas Service Bulletin DC-4 No. 47 covers this same subject.)

2. (a) Install all heater control components in airtight steel containers.
(b) Replace present heater fuel supply pumps with a single electric driven pump attached to No. 2 main fuel tank.

(c) Provide shrouds around all heater fuel line fittings in fuselage.

(d) Install a fire detector and extinguisher system for the nose heater and cabin heaters.

(Douglas Service Bulletins DC-4 Nos. 64 and 64 addendum cover this same subject.)

In some cases, operators have obtained approval from FAA Regional Offices for systems which differ in arrangement and detail from the above provisions. Designs which have been separately approved in this manner are considered to meet the intent of this Note.

This supersedes AD 46-39-02.


FOOTER:

Source: Official FAA Source ↗

Retrieved: Apr 8, 2026

Rights: U.S. Government Public Domain

This site is not affiliated with or endorsed by the FAA. Always verify with official sources.