Airworthiness Directives; CESSNA Model 190 and 195 Airplanes

Document Number
50-39-01
Type
ad
Published
N/A
Effective
N/A
Status
active
Rights
U.S. Government Public Domain

Abstract

Rudder Cable Inspection

Document Text

AD Final Rules - DRS_50-39-01.html
Copy URL
Print/Save as PDF
Document Versions
 Feedback
Details
AD Number:
50-39-01
Document Type:
AD Final Rules
Docket Number:
Unknown
Subject Heading:
Airworthiness Directives; CESSNA Model 190 and 195 Airplanes
Subject:
Rudder Cable Inspection
Status:
Current
Citation:
This information is not available.
Citation Publish Date:
Effective Date:
Make:
Cessna Aircraft Company
Model:
190 | 195 | 195A | 195B
Product Type:
Aircraft
Product Subtype:
Small Airplane
Affected AD:
Superseded AD:
Affected By:
Superseded By:
Service/Office:
Office of Primary Responsibility:
CFR Part Reference:
Part 39
Comments:
AIRWORTHINESS DIRECTIVES FINAL RULES: 50-39-01
CITATION:   This information is not available.

PAGE NUMBER:  

DOCKET NUMBER:   Unknown

AMENDMENT:  

AD NUMBER:   50-39-01

SUBJECT HEADING:   Airworthiness Directives; CESSNA Model 190 and 195 Airplanes

ACTION:  

SUMMARY:  

DATES:  

ADDRESSES:  

FOR FURTHER INFORMATION CONTACT:  

SUPPLEMENTARY INFORMATION:  

REGULATORY TEXT:  
50-39-01 CESSNA: Applies to All Models 190 and 195 Aircraft, Up to and Including Serial Number 7586.

Inspection required not later than November 25, 1950, on aircraft having 300 hours or more service and at each 100 hours operation on all aircraft.

Service experience has indicated that close inspection of rudder cables is necessary in order to detect premature cable fraying at the forward pulley. Due to the difficulty of inspection and since some failures may have occurred in core strands, the following methods are recommended: Detach the rudder cable from the rudder bellcrank in the aft fuselage or at the rudder horn at the pedal and pull the cable through the inspection openings immediately aft of the rudder pedal or through the tunnel at the aircraft centerline in the cabin. The cable should then be carefully inspected, by flexing, at a point 9 to 10 inches aft of the swaged fitting at the forward end of the cable for broken strands. Replace all cables showing signs of breakage.

The above inspection may be discontinued when at least the next larger size pulleys are installed.

(Cessna Service Kit, SK 9050-1 provides the larger pulley and inspection opening for those aircraft prior to Serial No. 7587.)

FOOTER:

Source: Official FAA Source ↗

Retrieved: Apr 8, 2026

Rights: U.S. Government Public Domain

This site is not affiliated with or endorsed by the FAA. Always verify with official sources.