Airworthiness Directives; Grumman Model G-21A Aircraft
Abstract
Fuel Tank Baffles
Document Text
AD Final Rules - DRS_49-16-01.html Copy URL Print/Save as PDF Document Versions Feedback Details AD Number: 49-16-01 Document Type: AD Final Rules Docket Number: Unknown Subject Heading: Airworthiness Directives; Grumman Model G-21A Aircraft Subject: Fuel Tank Baffles Status: Current Citation: This information is not available. Citation Publish Date: Effective Date: Make: Grumman American Aviation Corporation Model: G-21A (Army OA-9, Navy JRF-1, -2, -3, -4, -5, and -6B) Product Type: Aircraft Product Subtype: Small Airplane Affected AD: Superseded AD: Affected By: Superseded By: Service/Office: Office of Primary Responsibility: CFR Part Reference: Part 39 Comments: AIRWORTHINESS DIRECTIVES FINAL RULES: 49-16-01 CITATION: This information is not available. PAGE NUMBER: DOCKET NUMBER: Unknown AMENDMENT: AD NUMBER: 49-16-01 SUBJECT HEADING: Airworthiness Directives; Grumman Model G-21A Aircraft ACTION: SUMMARY: DATES: ADDRESSES: FOR FURTHER INFORMATION CONTACT: SUPPLEMENTARY INFORMATION: REGULATORY TEXT: 49-16-01 GRUMMAN: Applies to Model G-21A Aircraft Serial Numbers B-34, B-35, B- 38 Through B-42, B-45 Through B-51, B-53, B-54, B-55, B-57 Through B-61, B-63, B-64, B-65, B-67, B-68, B-70, B-71, B-74, B-76, B-77, B-82, B-83, B-85 Through B-90, B-92, B-96 Through B-99, B-101, B-106, B-107, B-111, B-116, B-118, B-119, B-120, B-124, B-125, B-127 Through B-134, B-137 Through B-141, B-143, B-144, and B-145. Compliance required as indicated. By June 1, 1949, inspect the fuel tank baffles at wing Stations 42, 54, and 75 through the handholds in bottom of integral fuel tanks. If baffles are found riveted to angle stiffness, no further action is required. If baffle stiffeners are attached by spotwelds, inspect for cracks. Airplane may continue in service, if no cracks are found in baffles, providing inspection is repeated each 100 hours. If cracking is not extensive and no spotwelds are broken from ribs, the airplane may be operated if inspected each 50 hours. Extensively cracked baffles should be repaired by replacing spotwelded baffles with riveted baffles. For further details, contact Grumman Aircraft Engineering Corporation, Bethpage, N.Y. FOOTER:
Source: Official FAA Source ↗
Retrieved: Apr 8, 2026
Rights: U.S. Government Public Domain
This site is not affiliated with or endorsed by the FAA. Always verify with official sources.