Airworthiness Directives; Siai-Marchetti Model F.260 Airplanes

Document Number
75-17-19
Type
ad
Published
N/A
Effective
August 19, 1975
Status
active
Rights
U.S. Government Public Domain

Abstract

Landing Gear

Document Text

AD Final Rules - DRS_75-17-19.html
Copy URL
Print/Save as PDF
Document Versions
 Feedback
Details
AD Number:
75-17-19
Document Type:
AD Final Rules
Docket Number:
Unknown
Subject Heading:
Airworthiness Directives; Siai-Marchetti Model F.260 Airplanes
Subject:
Landing Gear
Status:
Current
Citation:
This information is not available.
Citation Publish Date:
Effective Date:
08/19/1975
Make:
Aermacchi S.p.A.
Model:
F.260
Product Type:
Aircraft
Product Subtype:
Small Airplane
Affected AD:
Superseded AD:
Affected By:
Superseded By:
Service/Office:
Office of Primary Responsibility:
CFR Part Reference:
Part 39
Comments:
AIRWORTHINESS DIRECTIVES FINAL RULES: 75-17-19
CITATION:   This information is not available.

PAGE NUMBER:  

DOCKET NUMBER:   Unknown

AMENDMENT:   39-2321

AD NUMBER:   75-17-19

SUBJECT HEADING:   Airworthiness Directives; Siai-Marchetti Model F.260 Airplanes

ACTION:  

SUMMARY:  

DATES:   Effective August 19, 1975.

ADDRESSES:  

FOR FURTHER INFORMATION CONTACT:  

SUPPLEMENTARY INFORMATION:  

REGULATORY TEXT:   75-17-19 SIAI-MARCHETTI: Amendment 39-2321. Applies to SIAI Marchetti F.260 airplanes, Serial Numbers 101 thru 125; 2-26 thru 2-57; 2-59 thru 2-61; 3-76 thru 3-81 and 502, certificated in all categories.

Compliance is required as indicated, unless already accomplished.

To prevent possible failure of the landing gear, accomplish the following:

(a) Within the next 25 hours' time in service after the effective date of this AD, and thereafter at intervals not to exceed 50 hours' time in service from the last inspection, until replaced in accordance with paragraph (b) or (c) of this AD, inspect the landing gear actuator brackets, P/N 260-05-1413 and -14, or P/N 260-05-14-25 and -26, installed on Bulkhead No. 5, for cracks in accordance with paragraph (a) of SIAI Marchetti Service Bulletin No. 260B13, dated March 10, 1975, or an FAA-approved equivalent.

(b) If cracks are found during an inspection required by paragraph (a) of this AD, before further flight, replace the brackets with new brackets, P/N 260-05-201-03, in accordance with paragraph (b) of SIAI Marchetti Service Bulletin No. 260B13, dated March 10, 1975, or an FAA-approved equivalent.

(c) If no cracks are found during an inspection required by paragraph (a) of this AD, within the next 500 hours' time in service after the effective date of this AD, replace the brackets with new brackets, P/N 260-05-201-03, in accordance with paragraph 9b) of SIAI Marchetti Service Bulletin No. 260B13, dated March 10, 1975, or an FAA-approved equivalent.

This amendment becomes effective August 19, 1975.

FOOTER:

Source: Official FAA Source ↗

Retrieved: Apr 8, 2026

Rights: U.S. Government Public Domain

This site is not affiliated with or endorsed by the FAA. Always verify with official sources.