Airworthiness Directives; DOUGLAS All Models C-54 and DC-4 Aircraft
Abstract
Bolt Replacement
Document Text
AD Final Rules - DRS_49-38-02.html Copy URL Print/Save as PDF Document Versions Feedback Details AD Number: 49-38-02 Document Type: AD Final Rules Docket Number: Unknown Subject Heading: Airworthiness Directives; DOUGLAS All Models C-54 and DC-4 Aircraft Subject: Bolt Replacement Status: Current Citation: This information is not available. Citation Publish Date: Effective Date: Make: The Boeing Company Model: C54-DC | C54A-DC | C54B-DC | C54D-DC | C54E-DC | C54G-DC | DC-4 Product Type: Aircraft Product Subtype: Large Airplane Affected AD: Superseded AD: Affected By: Superseded By: Service/Office: Office of Primary Responsibility: CFR Part Reference: Part 39 Comments: AIRWORTHINESS DIRECTIVES FINAL RULES: 49-38-02 CITATION: This information is not available. PAGE NUMBER: DOCKET NUMBER: Unknown AMENDMENT: AD NUMBER: 49-38-02 SUBJECT HEADING: Airworthiness Directives; DOUGLAS All Models C-54 and DC-4 Aircraft ACTION: SUMMARY: DATES: ADDRESSES: FOR FURTHER INFORMATION CONTACT: SUPPLEMENTARY INFORMATION: REGULATORY TEXT: 49-38-02 DOUGLAS: Applies to All Models C-54 and DC-4 Aircraft. To be accomplished at every 9,000 hours total airplane flight time. In those cases where the present bolts have or will have accumulated more than 9,000 hours time prior to the next regular overhaul period, the first replacement time may be extended, at the discretion of the CAA Inspector, to coincide with a regular overhaul period but in no case should the adjustment time exceed 1,500 hours accumulated after January 26, 1948. Thereafter the bolt replacement shall be at the 9,000- or 18,000-hour period, whichever is applicable. Replace the following bolts: Fuselage to Center Wing Attachment; Outer Wing to Center Wing Attachment; Vertical Stabilizer Attachment to Fuselage Tail, Station 953; Engine Mount to Fire Wall Attachment; Horizontal Stabilizer to Fuselage Tail Assembly Attachment. The 9,000-hour period may be extended to 18,000 hours when studs 4105725-1 and -2 in outer wing attachment have been replaced with special studs Nos. 4357723-1 and -2 having letter "R" stamped on thread end and bolts in all other attachments listed are replaced with NAS bolts with threads rolled after heat treatment. The bolt part numbers and the number of bolts required are shown on pages 4 and 5 of the Douglas Service Magazine of August 1947. Bolts removed from the airplane are to be scrapped and are not to be used again. (Douglas Service Letter No. 66, Supplement No. 2, dated July 18, 1951, covers this same subject relative to wing alignment at Station 421.) This supersedes AD 48-04-03. FOOTER:
Source: Official FAA Source ↗
Retrieved: Apr 8, 2026
Rights: U.S. Government Public Domain
This site is not affiliated with or endorsed by the FAA. Always verify with official sources.