BOEING Model 727-100 Series Airplanes

Document Number
79-09-01
Type
ad
Published
N/A
Effective
May 8, 1979
Status
active
Rights
U.S. Government Public Domain

Abstract

Electrical Leads/Hydraulic Lines Chafing

Document Text

AD Final Rules - DRS_79-09-01.html
Copy URL
Print/Save as PDF
Document Versions
 Feedback
Details
AD Number:
79-09-01
Document Type:
AD Final Rules
Docket Number:
Unknown
Subject Heading:
BOEING Model 727-100 Series Airplanes
Subject:
Electrical Leads/Hydraulic Lines Chafing
Status:
Current
Citation:
This information is not available.
Citation Publish Date:
Effective Date:
05/08/1979
Make:
The Boeing Company
Model:
727-100 Series
Product Type:
Aircraft
Product Subtype:
Large Airplane
Affected AD:
Superseded AD:
Affected By:
Superseded By:
Service/Office:
Office of Primary Responsibility:
CFR Part Reference:
Part 39
Comments:
Updated RGL applicability to match AD applicability; CAR C-11-185
AIRWORTHINESS DIRECTIVES FINAL RULES: 79-09-01
CITATION:   This information is not available.

PAGE NUMBER:  

DOCKET NUMBER:   Unknown

AMENDMENT:   39-3452

AD NUMBER:   79-09-01

SUBJECT HEADING:   BOEING Model 727-100 Series Airplanes

ACTION:  

SUMMARY:  

DATES:   Effective May 8, 1979.

ADDRESSES:  

FOR FURTHER INFORMATION CONTACT:  

SUPPLEMENTARY INFORMATION:  

REGULATORY TEXT:  
79-09-01 BOEING: Amendment 39-3452. Applies to Model 727-100 series airplanes certificated in all categories listed in Boeing 727 Service Bulletin No. 24-30, revised May 18, 1966, that complied with FAA AD 66-30-02 by having been modified to Option No. 2 in said service bulletin. Compliance required as indicated. To prevent generator electrical lead damage and possible hydraulic fire from cable clamp failure allowing the electrical leads to chafe against hydraulic lines or components, accomplish the following:
1. Within the next 100 hours time-in-service after the effective date of this AD, and every 2,000 hours time-in-service thereafter, inspect the No. 1 generator electrical leads from the pressure feed through fittings (below the floor level) to the engine strut feed through, all generator electrical lead clamps, hydraulic systems, and airframe for routing separation and insulation chafing. Repair or replace any electrical lead, hydraulic line, airframe part or clamp damage as required in accordance with approved maintenance procedures.
The repetitive 2,000 hour inspection interval may be adjusted by FAA air carrier maintenance inspectors to the nearest scheduled maintenance inspection period.
2. If the generator electrical leads are not routed with at least three (3) inches separation from hydraulic lines or components, provide additional physical protection with aircraft quality Skydrol resistant insulation wrap and clamp as required.
3. If generator electrical leads are routed with at least three (3) inches separation from hydraulic lines or components, no further action is required under this AD.
The manufacturer's specifications and procedures identified and described in this directive are incorporated herein and made a part hereof pursuant to 5 U.S.C. 552(a)(1). All persons affected by this directive who have not already received these documents from the manufacturer, may obtain copies upon request to Boeing Commercial Airplane Company, P.O. Box 3707, Seattle, Washington 98124. These documents may also be examined at FAA Northwest Region, 9010 East Marginal Way South, Seattle, Washington 98108.

This amendment becomes effective May 8, 1979.

FOOTER:

Source: Official FAA Source ↗

Retrieved: Apr 8, 2026

Rights: U.S. Government Public Domain

This site is not affiliated with or endorsed by the FAA. Always verify with official sources.