Airworthiness Directives; AIRBUS INDUSTRIE Model A300 B2 and B4 Series Airplanes

Document Number
85-17-06
Type
ad
Published
N/A
Effective
September 19, 1985
Status
active
Rights
U.S. Government Public Domain

Abstract

Decompression Panels

Document Text

AD Final Rules - DRS_85-17-06.html
Copy URL
Print/Save as PDF
Document Versions
 Feedback
Details
AD Number:
85-17-06
Document Type:
AD Final Rules
Docket Number:
Unknown
Subject Heading:
Airworthiness Directives; AIRBUS INDUSTRIE Model A300 B2 and B4 Series Airplanes
Subject:
Decompression Panels
Status:
Current
Citation:
This information is not available.
Citation Publish Date:
Effective Date:
09/19/1985
Make:
Airbus
Model:
A300 B2-1A | A300 B2-1C | A300 B2-203 | A300 B2K-3C | A300 B4-103 | A300 B4-203 | A300 B4-2C
Product Type:
Aircraft
Product Subtype:
Large Airplane
Affected AD:
Superseded AD:
Affected By:
Superseded By:
Service/Office:
Office of Primary Responsibility:
CFR Part Reference:
Part 39
Comments:
AIRWORTHINESS DIRECTIVES FINAL RULES: 85-17-06
CITATION:   This information is not available.

PAGE NUMBER:  

DOCKET NUMBER:   Unknown

AMENDMENT:   39-5120

AD NUMBER:   85-17-06

SUBJECT HEADING:   Airworthiness Directives; AIRBUS INDUSTRIE Model A300 B2 and B4 Series Airplanes

ACTION:  

SUMMARY:  

DATES:   Effective September 19, 1985.

ADDRESSES:  

FOR FURTHER INFORMATION CONTACT:  

SUPPLEMENTARY INFORMATION:  

REGULATORY TEXT:   85-17-06 AIRBUS INDUSTRIE: Amendment 39-5120. Applies to Model A300 B2 and B4 series airplanes listed in Airbus Industrie Service Bulletin A300-25-138, Revision 8, dated June 27, 1983, certificated in any category. To prevent loss of fire protection due to separation of or damage to blowout panels in the ceiling and sidewalls of the forward cargo compartments, which could result in a degradation of the fire extinguishing capability in the aircraft, accomplish the following, unless previously accomplished:

A. Inspect the forward cargo compartment decompression panels for condition and attachment in the panel cut-outs in accordance with the accomplishment instructions of Airbus Industrie Service Bulletin A300-25-138, Revision 8, dated June 27, 1983, according to the following schedule:

(1) Daily, if Modifications 1878 and 2506, described in Airbus Industrie Service Bulletins A300-25-149, Revision 5, dated March 28, 1980, and A300-25-248, Revision 5, dated January 4, 1982, have not been incorporated;

(2) Within the next 600 hours time in service after the effective date of this AD and at subsequent intervals not to exceed 600 flight hours in service, if Modifications 1878 and 2506 have been incorporated.

B. If, during the inspections required by paragraph A. of this AD, damage to or separation of decompression panels is found, perform within the next 25 hours time of service from the last inspection the repair described in paragraph 2C of Airbus Industrie Service Bulletin A300- 25-138, Revision 8.

NOTE: Inspections and modifications accomplished in accordance with Amendment 39- 4070 constitute compliance with the requirements of paragraphs A. and B. of this Amendment.

C. Terminating action for the requirements of this AD is accomplished if Modification 3361, described in Airbus Industrie Service Bulletin A300-25-332, Revision 1, dated June 10, 1982, is incorporated.

D. Alternate means of compliance which provide an acceptable level of safety may be used when approved by the Manager, Seattle Aircraft Certification Office, FAA, Northwest Mountain Region.

E. Special flight permits may be issued in accordance with FAR 21.197 and 21.199 to operate airplanes to a base for the accomplishment of inspections and/or modifications required by this AD.

This amendment becomes effective September 19, 1985.

FOOTER:

Source: Official FAA Source ↗

Retrieved: Apr 8, 2026

Rights: U.S. Government Public Domain

This site is not affiliated with or endorsed by the FAA. Always verify with official sources.