LOCKHEED Models 49, 149, 649, 749, and 1049 Series Aircraft

Document Number
62-01-02
Type
ad
Published
N/A
Effective
January 9, 1962
Status
active
Rights
U.S. Government Public Domain

Abstract

Main Landing Gear Cylinders

Document Text

AD Final Rules - DRS_62-01-02.html
Copy URL
Print/Save as PDF
Document Versions
 Feedback
Details
AD Number:
62-01-02
Document Type:
AD Final Rules
Docket Number:
Unknown
Subject Heading:
LOCKHEED Models 49, 149, 649, 749, and 1049 Series Aircraft
Subject:
Main Landing Gear Cylinders
Status:
Current
Citation:
This information is not available.
Citation Publish Date:
Effective Date:
01/09/1962
Make:
Lockheed Aircraft Corporation
Model:
1049-54 | 1049B-55 (Navy R7V-1) | 1049C-55 | 1049D-55 | 1049E-55 | 1049F-55 (USAF C-121C) | 1049G-82...Show more
Product Type:
Aircraft
Product Subtype:
Large Airplane
Affected AD:
Superseded AD:
Affected By:
Superseded By:
Service/Office:
Office of Primary Responsibility:
CFR Part Reference:
Part 39
Comments:
AIRWORTHINESS DIRECTIVES FINAL RULES: 62-01-02
CITATION:   This information is not available.

PAGE NUMBER:  

DOCKET NUMBER:   Unknown

AMENDMENT:  

AD NUMBER:   62-01-02

SUBJECT HEADING:   LOCKHEED Models 49, 149, 649, 749, and 1049 Series Aircraft

ACTION:  

SUMMARY:  

DATES:   Effective January 9, 1962.

ADDRESSES:  

FOR FURTHER INFORMATION CONTACT:  

SUPPLEMENTARY INFORMATION:  

REGULATORY TEXT:  
62-01-02 LOCKHEED: Amdt. 384 Part 507 Federal Register January 9, 1962. Applies to All Models 49, 149, 649, 749, and 1049 Series Aircraft Incorporating Cleveland Pneumatic Tool Company Main Landing Gear Cylinders, P/N's 9040-2, 9040A-2, 9106-2, 9291-2, 9291B-2, 9291B-2B, or 9291D-2.

Compliance required as indicated.

As a result of failures of the cap weld on main landing gear cylinders which have been returned to service following compliance with the provisions of AD 59-07-03, as amended, all aircraft shall be inspected and/or modified as follows:

(a) Within the next 400 hours' time in service after the effective date of this AD, unless already accomplished, all landing gear cylinders with cap welds which previously have been inspected by the double-wall gamma radiographic technique in compliance with AD 59-07-03 shall be reinspected in accordance with (c), or shall be replaced with cylinders which have been inspected in accordance with (c) and found to exhibit no evidence of cracks.

(b) Within the next 1,200 hours' time in service after the effective date of this AD, unless already accomplished, all landing gear cylinders with cap welds which previously have been radiographically inspected by a method other than the double-wall gamma technique in compliance with AD 59-07-03, shall be reinspected in accordance with (c), or shall be replaced with cylinders which have been inspected in accordance with (c) and found to exhibit no evidence of cracks.

(c) The inspection techniques and procedures to be applied to all cylinders noted in (a) and (b) shall be those prescribed by Section B of Lockheed Field Service Letter No. FS/254049L, dated August 29, 1961, or FAA engineering approved equivalent. The entire periphery of the cap weld shall be inspected.

(d) Any cylinder with a cap weld which is found to exhibit any evidence of cracks when inspected as required by (a) or (b), shall be replaced prior to further flight of the aircraft. Cracked cylinders are not eligible for any further use in certificated aircraft.

(e) The cap welds on all cylinders which have been installed or which have been inspected, found to exhibit no evidence of cracks, and returned to service in accordance with (a) or (b), shall be reinspected in accordance with (c), at periods thereafter not to exceed 5,000 hours' time in service. The first periodic reinspection of any cylinder in service which, prior to the effective date of this AD, was inspected in the manner prescribed by (c) shall be accomplished within 5,000 hours' time in service following the date of that inspection.

(f) Cylinders with the cap welds which exhibit any evidence of cracks during any of these periodic reinspections shall be replaced prior to further flight of the aircraft. Cracked cylinders are not eligible for any further use in certificated aircraft.

(g) Upon request of the operator, an FAA maintenance inspector, subject to prior approval of the Chief, Engineering and Manufacturing Branch, FAA Western Region, may adjust the repetitive inspection intervals specified in this AD to permit compliance at an established inspection period of the operator if the request contains substantiating data to justify the increase for such operator.

(h) When the cylinders described are replaced with new cylinders, TPC Co. P/N's 9040A-2A, 9106-2A, and 9291D-2A, incorporating flash welded caps, the inspections specified in (a) through (g), may be discontinued.

(Lockheed Field Service Letter FS/254049L covers this same subject.)

This supersedes AD 59-07-03.

This directive effective January 9, 1962.

FOOTER:

Source: Official FAA Source ↗

Retrieved: Apr 8, 2026

Rights: U.S. Government Public Domain

This site is not affiliated with or endorsed by the FAA. Always verify with official sources.