Airworthiness Directives; DOUGLAS DC-6

Document Number
60-02-05
Type
ad
Published
January 16, 1960
Effective
N/A
Status
active
Rights
U.S. Government Public Domain

Abstract

Spar Cap

Document Text

AD Final Rules - DRS_60-02-05.html
Copy URL
Print/Save as PDF
Document Versions
 Feedback
Details
AD Number:
60-02-05
Document Type:
AD Final Rules
Docket Number:
Unknown
Subject Heading:
Airworthiness Directives; DOUGLAS DC-6
Subject:
Spar Cap
Status:
Current
Citation:
(Federal Register: January 16, 1960)
Citation Publish Date:
01/16/1960
Effective Date:
Make:
The Boeing Company
Model:
DC-6 | DC-6A | DC-6B
Product Type:
Aircraft
Product Subtype:
Large Airplane
Affected AD:
Superseded AD:
Affected By:
Superseded By:
Service/Office:
Office of Primary Responsibility:
CFR Part Reference:
Part 39
Comments:
AIRWORTHINESS DIRECTIVES FINAL RULES: 60-02-05
CITATION:   [Federal Register: January 16, 1960]

PAGE NUMBER:  

DOCKET NUMBER:   Unknown

AMENDMENT:  

AD NUMBER:   60-02-05

SUBJECT HEADING:   Airworthiness Directives; DOUGLAS DC-6

ACTION:  

SUMMARY:  

DATES:  

ADDRESSES:  

FOR FURTHER INFORMATION CONTACT:  

SUPPLEMENTARY INFORMATION:  

REGULATORY TEXT:  
60-02-05 DOUGLAS: Amdt. 84 Part 507 Federal Register January 16, 1960. Applies to the Following Aircraft: DC-6 Serial Numbers 42878, 43030 To 43033 Inclusive, 43136, 43148 To 43151 Inclusive, 43212 To 43214 Inclusive, and 43216 To 43218 Inclusive.

Compliance required as indicated.

To detect cracking of the lower front and center spar cap tangs at intersection with lower fuselage attach angle the following must be accomplished on affected DC-6 aircraft having in excess of 16,000 hours service time.

(a) Inspect lower front spar cap at the nearest maintenance inspection period to 200 hours service time unless similar inspection has been conducted within the last 1,250 hours service time.

(b) Inspect lower front and center spar caps at maintenance inspection period nearest to each succeeding 1,250 hours service time.

(1) At the first 1,250-hour inspection period, the holes located in aft tang of front spar lower cap and fuselage attach angle should be enlarged and new attachments installed. (Kit "A" of Douglas SB A-845 or equivalent.)

(2) At next regularly scheduled overhaul period, the holes located in forward tang of front spar lower cap should be enlarged and new attachments installed. (Kit "A" of Douglas SB A-845 or equivalent.)

(c) If spar cap cracks are found, temporary rework per Drawing No. 3645935 (Kit "B"), or permanent rework per Drawing No. 5765079 (Kit "C") or equivalent, must be accomplished. If temporary rework is installed, inspection must be repeated at 1,250-hour intervals for a maximum of 3,200 hours service time, at which time permanent rework per Drawing No. 5765079 (Kit "C"), or equivalent, must be accomplished.

(d) All aircraft must have permanent rework per Drawing No. 5765079 (Kit "C"), or equivalent, accomplished within next 6,400 hours service time.

(e) After installation of permanent rework per Kit "C", or equivalent, operators may revert to normal repetitive inspection periods not to exceed 3,200 hours service time.

(Douglas Service Bulletin DC-6 No. A-845 dated July 31, 1959, covers this same subject.)


FOOTER:

Source: Official FAA Source ↗

Retrieved: Apr 8, 2026

Rights: U.S. Government Public Domain

This site is not affiliated with or endorsed by the FAA. Always verify with official sources.