Orlando Helicopter Airways, Inc. | Sikorsky Aircraft Corporation S62A Airworthiness Directives

Browse ADs indexed for this model. Applicability depends on your aircraft configuration.

Check your aircraft configuration

66-04-03

final rule

Airworthiness Directives; Sikorsky Models S-55 Series and S-62A Helicopters

Unsafe Condition: Fatigue cracks in the spar of a main rotor blade

Effective: Apr 27, 1976 Category: aircraft Compliance: Effective April 27, 1976
Technical illustration of a helicopter rotor hub assembly
Problem area Rotor system

75-04-02

final rule

Airworthiness Directives; Sikorsky Models S-55, S-55B, S-55C, and S-62A Helicopters Including Military Types HRS-1, HRS-3, CH-19, H-19B, H-19G, H-19A, H-19D, HO4S-3G, UH-19D, H19D5, UH-19B, and UH-19D Helicopters

Unsafe Condition: Cracks in the exposed areas of the lugs of main rotor spindles P/N S10-10-3325-1 and S10-10-3325-2.

Effective: Feb 19, 1975 Category: aircraft Compliance: within 10 hours' time in service after the effective date of this AD
Technical illustration of a helicopter rotor hub assembly
Problem area Rotor system

65-08-02

final rule

Airworthiness Directives; Sikorsky Models S-55, S-62, and S-61 Series Helicopters

Unsafe Condition: Pitting in main rotor blade spars has resulted in fatigue cracks.

Effective: Apr 9, 1965 Category: aircraft Compliance: Within 10 hours' time in service after the effective date and at intervals thereafter within 10 h...
Technical illustration of a helicopter rotor hub assembly
Problem area Rotor system