AD 98-18-19

final rule
Data completeness: 70%

Airworthiness Directives; McDonnell Douglas Model MD-90-30 Series Airplanes

AD Number
98-18-19
Status
final_rule
Effective Date
Product Category
aircraft
Docket
98-NM-255-AD
FR Citation
(Federal Register: September 03, 1998 (Volume 63, Number 171))

Applicability

TypeManufacturerModelDetails
aircraft The Boeing Company MD-90-30 Airworthiness Directives; McDonnell Douglas Model MD-90-30 Series Airplanes

Unsafe Condition

Improper installation of actuator attach bolts of the elevator load feel (ELF) mechanism during manufacture could result in disconnection of the ELF mechanism and consequent loss of pitch control of the airplane.

AI-generated summary from the source AD text. Verify against the official source before acting.

Required Actions

Perform a one-time visual inspection of the left and right actuator attach bolts of the elevator load feel (ELF) under the forward cockpit floor. If improperly installed, tighten or replace the bolts prior to further flight. Submit inspection results to the FAA within 10 days.

AI-generated summary from the source AD text. Verify against the official source before acting.

Compliance Time

Within 30 days after the effective date of this AD (September 18, 1998). For corrective actions (tightening/installing new bolts), compliance is required prior to further flight.

AI-generated summary from the source AD text. Verify against the official source before acting.

Affected Aircraft

McDonnell Douglas Model MD-90-30 series airplanes listed in Alert Service Bulletin MD90-27A032, dated June 22, 1998, certificated in any category.

AI-generated summary from the source AD text. Verify against the official source before acting.

Source: Official FAA Source ↗

Retrieved: Apr 8, 2026

Rights: U.S. Government Public Domain

This site is not affiliated with or endorsed by the FAA. Always verify with official sources.