AD 93-24-04

final rule

Airworthiness Directives; FOKKER Model F28 Mark 0100 Series Airplanes

AD Number
93-24-04
Status
final_rule
Effective Date
Product Category
aircraft
Docket
93-NM-100-AD
FR Citation
This information is not available.
Technical illustration of a riveted aircraft structural panel and frame
Problem area Airframe structure

Applicability

TypeManufacturerModelDetails
aircraft Fokker F28 0100 Airworthiness Directives; FOKKER Model F28 Mark 0100 Series Airplanes

Unsafe Condition

Cracking and reduced structural capability of the forward partial pressure bulkhead and subsequent decompression of the airplane.

AI-generated summary from the source AD text. Verify against the official source before acting.

Required Actions

Install a doubler assembly on the forward partial pressure bulkhead in accordance with Fokker 100 Service Bulletin SBF100-53-052, Revision 1, dated June 7, 1993. Operators who previously installed the doubler per the original Service Bulletin SBF100-53-052 dated January 17, 1992, are considered compliant.

AI-generated summary from the source AD text. Verify against the official source before acting.

Compliance Time

Prior to the accumulation of 15,000 total flight cycles, or within 3 months after the effective date of this AD, whichever occurs later.

AI-generated summary from the source AD text. Verify against the official source before acting.

Affected Aircraft

FOKKER Model F28 Mark 0100 series airplanes with serial numbers 11244 to 11286 inclusive, 11289, 11291, 11292, 11293, 11295, 11297, 11300, 11303, 11306, and 11308.

AI-generated summary from the source AD text. Verify against the official source before acting.

Federal Register Abstract

Forward Partial Pressure Bulkhead

Applicability Source Text

Show captured applicability text from the source AD
AD Final Rules - DRS_93-24-04.html
Copy URL
Print/Save as PDF
Document Versions
 Feedback
Details
AD Number:
93-24-04
Document Type:
AD Final Rules
Docket Number:
93-NM-100-AD
Subject Heading:
Airworthiness Directives; FOKKER Model F28 Mark 0100 Series Airplanes
Subject:
Forward Partial Pressure Bulkhead
Status:
Current
Citation:
This information is not available.
Citation Publish Date:
Effective Date:
01/20/1994
Make:
Model:
F.28 Mark 0100
Product Type:
Aircraft
Product Subtype:
Large Airplane
Affected AD:
Superseded AD:
Affected By:
Superseded By:
Service/Office:
Office of Primary Responsibility:
CFR Part Reference:
Part 39
Comments:
AIRWORTHINESS DIRECTIVES FINAL RULES: 93-24-04
CITATION:   This information is not available.

PAGE NUMBER:  

DOCKET NUMBER:   93-NM-100-AD

AMENDMENT:   39-8753

AD NUMBER:   93-24-04

SUBJECT HEADING:   Airworthiness Directives; FOKKER Model F28 Mark 0100 Series Airplanes

ACTION:  

SUMMARY:  

DATES:   Effective January 20, 1994.

ADDRESSES:  

FOR FURTHER INFORMATION CONTACT:  

SUPPLEMENTARY INFORMATION:  

REGULATORY TEXT:  
93-24-04 FOKKER: Amendment 39-8753. Docket 93-NM-100-AD.
Applicability: Model F28 Mark 0100 series airplanes; serial numbers 11244 to 11286 inclusive, 11289, 11291, 11292, 11293, 11295, 11297, 11300, 11303, 11306, and 11308; certificated in any category.

Compliance: Required as indicated, unless accomplished previously.

To prevent cracking and reduced structural capability of the forward partial pressure bulkhead and subsequent decompression of the airplane, accomplish the following:

(a) Prior to the accumulation of 15,000 total flight cycles, or within 3 months after the effective date of this AD, whichever occurs later, install a doubler assembly on the forward partial pressure bulkhead in accordance with Fokker 100 Service Bulletin SBF100-53-052, Revision 1, dated June 7, 1993.

NOTE: Operators who have accomplished the appropriate installation in accordance with the originally issued Fokker Service Bulletin SBF100-53-052, dated January 17, 1992, are considered to be in compliance with this paragraph.

(b) An alternative method of compliance or adjustment of the compliance time that provides an acceptable level of safety may be used if approved by the Manager, Standardization Branch, ANM-113. Operators shall submit their requests through an appropriate FAA Principal Maintenance Inspector, who may add comments and then send it to the Manager, Standardization Branch, ANM-113.

NOTE: Information concerning the existence of approved alternative methods of compliance with this AD, if any, may be obtained from the Standardization Branch, ANM-113.

(c) Special flight permits may be issued in accordance with FAR 21.197 and 21.199 to operate the airplane to a location where the requirements of this AD can be accomplished.

(d) The installation shall be done in accordance with Fokker Service Bulletin SBF100-53-052, Revision 1, dated June 7, 1993, which contains the following list of effective pages:

Page Number	
Revision Level
Shown on Page
	Date
Shown on Page
1-2, 8, 11-13	
1
	June 7, 1993
3-7, 9-10	
Original
	January 17, 1992

This incorporation by reference was approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR Part 51. Copies may be obtained from Fokker Aircraft USA, Inc., 1199 North Fairfax Street, Alexandria, Virginia 22314. Copies may be inspected at the FAA, Transport Airplane Directorate, 1601 Lind Avenue, SW., Renton, Washington; or at the Office of the Federal Register, 800 North Capitol Street, NW., suite 700, Washington, DC.

(e) This amendment becomes effective on January 20, 1994.

FOOTER:

Document Text

Show stored source text (verify against official source)
AD Final Rules - DRS_93-24-04.html
Copy URL
Print/Save as PDF
Document Versions
 Feedback
Details
AD Number:
93-24-04
Document Type:
AD Final Rules
Docket Number:
93-NM-100-AD
Subject Heading:
Airworthiness Directives; FOKKER Model F28 Mark 0100 Series Airplanes
Subject:
Forward Partial Pressure Bulkhead
Status:
Current
Citation:
This information is not available.
Citation Publish Date:
Effective Date:
01/20/1994
Make:
Model:
F.28 Mark 0100
Product Type:
Aircraft
Product Subtype:
Large Airplane
Affected AD:
Superseded AD:
Affected By:
Superseded By:
Service/Office:
Office of Primary Responsibility:
CFR Part Reference:
Part 39
Comments:
AIRWORTHINESS DIRECTIVES FINAL RULES: 93-24-04
CITATION:   This information is not available.

PAGE NUMBER:  

DOCKET NUMBER:   93-NM-100-AD

AMENDMENT:   39-8753

AD NUMBER:   93-24-04

SUBJECT HEADING:   Airworthiness Directives; FOKKER Model F28 Mark 0100 Series Airplanes

ACTION:  

SUMMARY:  

DATES:   Effective January 20, 1994.

ADDRESSES:  

FOR FURTHER INFORMATION CONTACT:  

SUPPLEMENTARY INFORMATION:  

REGULATORY TEXT:  
93-24-04 FOKKER: Amendment 39-8753. Docket 93-NM-100-AD.
Applicability: Model F28 Mark 0100 series airplanes; serial numbers 11244 to 11286 inclusive, 11289, 11291, 11292, 11293, 11295, 11297, 11300, 11303, 11306, and 11308; certificated in any category.

Compliance: Required as indicated, unless accomplished previously.

To prevent cracking and reduced structural capability of the forward partial pressure bulkhead and subsequent decompression of the airplane, accomplish the following:

(a) Prior to the accumulation of 15,000 total flight cycles, or within 3 months after the effective date of this AD, whichever occurs later, install a doubler assembly on the forward partial pressure bulkhead in accordance with Fokker 100 Service Bulletin SBF100-53-052, Revision 1, dated June 7, 1993.

NOTE: Operators who have accomplished the appropriate installation in accordance with the originally issued Fokker Service Bulletin SBF100-53-052, dated January 17, 1992, are considered to be in compliance with this paragraph.

(b) An alternative method of compliance or adjustment of the compliance time that provides an acceptable level of safety may be used if approved by the Manager, Standardization Branch, ANM-113. Operators shall submit their requests through an appropriate FAA Principal Maintenance Inspector, who may add comments and then send it to the Manager, Standardization Branch, ANM-113.

NOTE: Information concerning the existence of approved alternative methods of compliance with this AD, if any, may be obtained from the Standardization Branch, ANM-113.

(c) Special flight permits may be issued in accordance with FAR 21.197 and 21.199 to operate the airplane to a location where the requirements of this AD can be accomplished.

(d) The installation shall be done in accordance with Fokker Service Bulletin SBF100-53-052, Revision 1, dated June 7, 1993, which contains the following list of effective pages:

Page Number	
Revision Level
Shown on Page
	Date
Shown on Page
1-2, 8, 11-13	
1
	June 7, 1993
3-7, 9-10	
Original
	January 17, 1992

This incorporation by reference was approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR Part 51. Copies may be obtained from Fokker Aircraft USA, Inc., 1199 North Fairfax Street, Alexandria, Virginia 22314. Copies may be inspected at the FAA, Transport Airplane Directorate, 1601 Lind Avenue, SW., Renton, Washington; or at the Office of the Federal Register, 800 North Capitol Street, NW., suite 700, Washington, DC.

(e) This amendment becomes effective on January 20, 1994.

FOOTER:

Source: Official FAA Source ↗

Retrieved: Apr 8, 2026

Rights: U.S. Government Public Domain

This site is not affiliated with or endorsed by the FAA. Always verify with official sources.