AD 93-15-04

final rule

PRATT AND WHITNEY Models JT9D-59A, -70A, -7Q, and -7Q3 Engines

AD Number
93-15-04
Status
final_rule
Effective Date
Product Category
engine
Docket
90-ANE-20
FR Citation
This information is not available.
Technical illustration of an aircraft fuel pump, filter, valve, and lines
Problem area Fuel system

Applicability

TypeManufacturerModelDetails
engine Pratt & Whitney Division JT9D-59A PRATT AND WHITNEY Models JT9D-59A, -70A, -7Q, and -7Q3 Engines
engine Pratt & Whitney Division JT9D-70A PRATT AND WHITNEY Models JT9D-59A, -70A, -7Q, and -7Q3 Engines
engine Pratt & Whitney Division JT9D-7Q PRATT AND WHITNEY Models JT9D-59A, -70A, -7Q, and -7Q3 Engines
engine Pratt & Whitney Division JT9D-7Q3 PRATT AND WHITNEY Models JT9D-59A, -70A, -7Q, and -7Q3 Engines

Unsafe Condition

Fuel nozzle distress which can result in an uncontained lenticular seal failure, and an inflight engine shutdown.

AI-generated summary from the source AD text. Verify against the official source before acting.

Required Actions

Modify the fuel nozzle and support assembly with Part Numbers 795094, 5004189-01, 795090, and 5003981-01 in accordance with Part 1 and Part 2 of Pratt & Whitney Service Bulletin 5566, Revision 4. Alternative methods of compliance may be approved by the Engine Certification Office.

AI-generated summary from the source AD text. Verify against the official source before acting.

Compliance Time

Required prior to June 30, 1994, unless accomplished previously.

AI-generated summary from the source AD text. Verify against the official source before acting.

Affected Aircraft

Pratt & Whitney JT9D-59A, -70A, -7Q, and -7Q3 engines installed on Boeing 747, Airbus A300, and McDonnell Douglas DC10 aircraft.

AI-generated summary from the source AD text. Verify against the official source before acting.

Federal Register Abstract

Fuel Nozzle And Support Assembly

Applicability Source Text

Show captured applicability text from the source AD
AD Final Rules - DRS_93-15-04.html
Copy URL
Print/Save as PDF
Document Versions
 Feedback
Details
AD Number:
93-15-04
Document Type:
AD Final Rules
Docket Number:
90-ANE-20
Subject Heading:
PRATT AND WHITNEY Models JT9D-59A, -70A, -7Q, and -7Q3 Engines
Subject:
Fuel Nozzle And Support Assembly
Status:
Current
Citation:
This information is not available.
Citation Publish Date:
Effective Date:
11/19/1993
Make:
Pratt & Whitney Division
Model:
JT9D-59A | JT9D-70A | JT9D-7Q | JT9D-7Q3
Product Type:
Engine
Product Subtype:
Affected AD:
Superseded AD:
Affected By:
Superseded By:
Service/Office:
Office of Primary Responsibility:
CFR Part Reference:
Part 39
Comments:
AIRWORTHINESS DIRECTIVES FINAL RULES: 93-15-04
CITATION:   This information is not available.

PAGE NUMBER:  

DOCKET NUMBER:   90-ANE-20

AMENDMENT:   39-8650

AD NUMBER:   93-15-04

SUBJECT HEADING:   PRATT AND WHITNEY Models JT9D-59A, -70A, -7Q, and -7Q3 Engines

ACTION:  

SUMMARY:  

DATES:   Effective November 19, 1993.

ADDRESSES:  

FOR FURTHER INFORMATION CONTACT:  

SUPPLEMENTARY INFORMATION:  

REGULATORY TEXT:   93-15-04 PRATT AND WHITNEY: Amendment 39-8650. Docket No. 90-ANE-20.
Applicability: Pratt and Whitney (PW) JT9D-59A, -70A, -7Q, and -7Q3 turbofan engines installed on, but not limited to, Boeing 747, Airbus A300, and McDonnell Douglas DC10 aircraft.
Compliance: Required prior to June 30, 1994, unless accomplished previously.
To prevent fuel nozzle distress which can result in an uncontained lenticular seal failure, and an inflight engine shutdown, accomplish the following:
(a) Modify the fuel nozzle and support assembly, Part Numbers 795094, 5004189-01, 795090, and 5003981-01, in accordance with Part 1 and Part 2 of the Accomplishment Instructions, contained in PW Service Bulletin (SB) No. 5566, Revision 4, dated June 23, 1988.
(b) An alternative method of compliance or adjustment of the compliance time that provides an acceptable level of safety may be used if approved by the Manager, Engine Certification Office. The request should be forwarded through an appropriate FAA Principal Maintenance Inspector, who may add comments and then send it to the Manager, Engine Certification Office. NOTE: Information concerning the existence of approved alternative methods of compliance with this airworthiness directive, if any, may be obtained from the Engine Certification Office.
(c) Special flight permits may be issued, in accordance with FAR 21.197 and 21.199, to operate the airplane to a location where the requirements of this AD can be accomplished.
(d) The modifications for the fuel nozzle and support assembly shall be done in accordance with the following Pratt & Whitney service bulletin:

Pratt & Whitney
Service Bulletin No. 5566
PAGE NO.	REVISION NO.	DATE
1	4	June 23, 1988
2	2	December 10, 1986
3	3	December 10, 1987
4	4	June 23, 1988
5	2	December 10, 1986
6 and 7	3	December 10, 1987
8 through 12	2	December 10, 1986
13 through 15	3	December 10, 1987
16 through 21	2	December 10, 1986
22	4	June 23, 1988
This incorporation by reference was approved by the Director of the Federal Register, in accordance with 5 U.S.C. 552(a) and 1 CFR Part 51. Copies may be obtained from Pratt and Whitney, Publication Department, P.O. Box 611, Middletown, Connecticut 06457. Copies may be inspected at the FAA, New England Region, Office of the Assistant Chief Counsel, 12 New England Executive Park, Burlington, Massachusetts 01803-5299; or at the Office of the Federal Register, 800 North Capitol Street NW., suite 700, Washington, DC.
(f) This amendment becomes effective on November 19, 1993

FOOTER:

Document Text

Show stored source text (verify against official source)
AD Final Rules - DRS_93-15-04.html
Copy URL
Print/Save as PDF
Document Versions
 Feedback
Details
AD Number:
93-15-04
Document Type:
AD Final Rules
Docket Number:
90-ANE-20
Subject Heading:
PRATT AND WHITNEY Models JT9D-59A, -70A, -7Q, and -7Q3 Engines
Subject:
Fuel Nozzle And Support Assembly
Status:
Current
Citation:
This information is not available.
Citation Publish Date:
Effective Date:
11/19/1993
Make:
Pratt & Whitney Division
Model:
JT9D-59A | JT9D-70A | JT9D-7Q | JT9D-7Q3
Product Type:
Engine
Product Subtype:
Affected AD:
Superseded AD:
Affected By:
Superseded By:
Service/Office:
Office of Primary Responsibility:
CFR Part Reference:
Part 39
Comments:
AIRWORTHINESS DIRECTIVES FINAL RULES: 93-15-04
CITATION:   This information is not available.

PAGE NUMBER:  

DOCKET NUMBER:   90-ANE-20

AMENDMENT:   39-8650

AD NUMBER:   93-15-04

SUBJECT HEADING:   PRATT AND WHITNEY Models JT9D-59A, -70A, -7Q, and -7Q3 Engines

ACTION:  

SUMMARY:  

DATES:   Effective November 19, 1993.

ADDRESSES:  

FOR FURTHER INFORMATION CONTACT:  

SUPPLEMENTARY INFORMATION:  

REGULATORY TEXT:   93-15-04 PRATT AND WHITNEY: Amendment 39-8650. Docket No. 90-ANE-20.
Applicability: Pratt and Whitney (PW) JT9D-59A, -70A, -7Q, and -7Q3 turbofan engines installed on, but not limited to, Boeing 747, Airbus A300, and McDonnell Douglas DC10 aircraft.
Compliance: Required prior to June 30, 1994, unless accomplished previously.
To prevent fuel nozzle distress which can result in an uncontained lenticular seal failure, and an inflight engine shutdown, accomplish the following:
(a) Modify the fuel nozzle and support assembly, Part Numbers 795094, 5004189-01, 795090, and 5003981-01, in accordance with Part 1 and Part 2 of the Accomplishment Instructions, contained in PW Service Bulletin (SB) No. 5566, Revision 4, dated June 23, 1988.
(b) An alternative method of compliance or adjustment of the compliance time that provides an acceptable level of safety may be used if approved by the Manager, Engine Certification Office. The request should be forwarded through an appropriate FAA Principal Maintenance Inspector, who may add comments and then send it to the Manager, Engine Certification Office. NOTE: Information concerning the existence of approved alternative methods of compliance with this airworthiness directive, if any, may be obtained from the Engine Certification Office.
(c) Special flight permits may be issued, in accordance with FAR 21.197 and 21.199, to operate the airplane to a location where the requirements of this AD can be accomplished.
(d) The modifications for the fuel nozzle and support assembly shall be done in accordance with the following Pratt & Whitney service bulletin:

Pratt & Whitney
Service Bulletin No. 5566
PAGE NO.	REVISION NO.	DATE
1	4	June 23, 1988
2	2	December 10, 1986
3	3	December 10, 1987
4	4	June 23, 1988
5	2	December 10, 1986
6 and 7	3	December 10, 1987
8 through 12	2	December 10, 1986
13 through 15	3	December 10, 1987
16 through 21	2	December 10, 1986
22	4	June 23, 1988
This incorporation by reference was approved by the Director of the Federal Register, in accordance with 5 U.S.C. 552(a) and 1 CFR Part 51. Copies may be obtained from Pratt and Whitney, Publication Department, P.O. Box 611, Middletown, Connecticut 06457. Copies may be inspected at the FAA, New England Region, Office of the Assistant Chief Counsel, 12 New England Executive Park, Burlington, Massachusetts 01803-5299; or at the Office of the Federal Register, 800 North Capitol Street NW., suite 700, Washington, DC.
(f) This amendment becomes effective on November 19, 1993

FOOTER:

Source: Official FAA Source ↗

Retrieved: Apr 8, 2026

Rights: U.S. Government Public Domain

This site is not affiliated with or endorsed by the FAA. Always verify with official sources.