AD 93-12-03

final rule
Data completeness: 70%

Airworthiness Directives; MCDONNELL DOUGLAS MD-11 Series Airplanes

AD Number
93-12-03
Status
final_rule
Effective Date
Product Category
aircraft
Docket
93-NM-81-AD
FR Citation
This information is not available.

Applicability

TypeManufacturerModelDetails
aircraft The Boeing Company MD-11 Airworthiness Directives; MCDONNELL DOUGLAS MD-11 Series Airplanes
aircraft The Boeing Company MD-11F Airworthiness Directives; MCDONNELL DOUGLAS MD-11 Series Airplanes

Unsafe Condition

Fuel leakage into the center cargo bilge area that could lead to a fire in the cargo compartment.

AI-generated summary from the source AD text. Verify against the official source before acting.

Required Actions

Modify the plumbing on the forward spar of the tail fuel tank within 30 days after the effective date. Perform a pressure check of the fuel shroud drain system before further flight. If the system fails the check, repair or replace the failed line, repeat the pressure check, and inspect/replace fuel-contaminated insulation blankets. If the system passes, no further action is required.

AI-generated summary from the source AD text. Verify against the official source before acting.

Compliance Time

Within 30 days after the effective date of this AD

AI-generated summary from the source AD text. Verify against the official source before acting.

Affected Aircraft

Model MD-11 series airplanes as listed in McDonnell Douglas MD-11 Alert Service Bulletin A28-56, Revision 1, dated June 14, 1993, certificated in any category.

AI-generated summary from the source AD text. Verify against the official source before acting.

Source: Official FAA Source ↗

Retrieved: Apr 8, 2026

Rights: U.S. Government Public Domain

This site is not affiliated with or endorsed by the FAA. Always verify with official sources.