AD 92-27-09

final rule
Data completeness: 70%

BRITISH AEROSPACE Model BAe/HS/DH/BH 125 Series Airplanes

AD Number
92-27-09
Status
final_rule
Effective Date
Product Category
aircraft
Docket
91-NM-205-AD
FR Citation
This information is not available.

Applicability

TypeManufacturerModelDetails
aircraft Textron Aviation Inc. BAe.125 Series 1000B BRITISH AEROSPACE Model BAe/HS/DH/BH 125 Series Airplanes
aircraft Textron Aviation Inc. BAe.125 Series 800A BRITISH AEROSPACE Model BAe/HS/DH/BH 125 Series Airplanes
aircraft Textron Aviation Inc. BAe.125 Series 800A (C-29A) BRITISH AEROSPACE Model BAe/HS/DH/BH 125 Series Airplanes
aircraft Textron Aviation Inc. BAe.125 Series 800A (U-125) BRITISH AEROSPACE Model BAe/HS/DH/BH 125 Series Airplanes
aircraft Textron Aviation Inc. BAe.125 Series 800B BRITISH AEROSPACE Model BAe/HS/DH/BH 125 Series Airplanes
aircraft Textron Aviation Inc. BH.125 Series 400A BRITISH AEROSPACE Model BAe/HS/DH/BH 125 Series Airplanes
aircraft Textron Aviation Inc. BH.125 Series 600A BRITISH AEROSPACE Model BAe/HS/DH/BH 125 Series Airplanes
aircraft Textron Aviation Inc. DH.125 Series 1A BRITISH AEROSPACE Model BAe/HS/DH/BH 125 Series Airplanes
aircraft Textron Aviation Inc. DH.125 Series 1A-522 BRITISH AEROSPACE Model BAe/HS/DH/BH 125 Series Airplanes
aircraft Textron Aviation Inc. DH.125 Series 1A/R-522 BRITISH AEROSPACE Model BAe/HS/DH/BH 125 Series Airplanes

Unsafe Condition

Failure of the main landing gear (MLG) sidestay upper arm assembly due to fatigue cracking could result in collapse of the MLG during landing, leading to loss of control of the airplane.

AI-generated summary from the source AD text. Verify against the official source before acting.

Required Actions

Replace the MLG sidestay upper arm assembly prior to 12,000 landings or within 9 months after January 27, 1993, whichever is later. Subsequent replacements must occur before 12,000 landings on each assembly. Overhauled assemblies without recorded landings must be assumed to have 8,000 landings at installation.

AI-generated summary from the source AD text. Verify against the official source before acting.

Compliance Time

Prior to the accumulation of 12,000 landings on any MLG sidestay upper arm assembly, or within 9 months after the effective date of this AD, whichever occurs later.

AI-generated summary from the source AD text. Verify against the official source before acting.

Affected Aircraft

British Aerospace Model BAe/HS/DH/BH 125 series airplanes excluding Model BAe 125-1000A series; certificated in any category.

AI-generated summary from the source AD text. Verify against the official source before acting.

Source: Official FAA Source ↗

Retrieved: Apr 8, 2026

Rights: U.S. Government Public Domain

This site is not affiliated with or endorsed by the FAA. Always verify with official sources.