AD 91-21-03

final rule
Data completeness: 70%

Airworthiness Directives; MCDONNELL DOUGLAS DC-9 Series Airplanes

AD Number
91-21-03
Status
final_rule
Effective Date
Product Category
aircraft
Docket
91-NM-74-AD
FR Citation
This information is not available.

Applicability

TypeManufacturerModelDetails
aircraft The Boeing Company DC-9-11 Airworthiness Directives; MCDONNELL DOUGLAS DC-9 Series Airplanes
aircraft The Boeing Company DC-9-12 Airworthiness Directives; MCDONNELL DOUGLAS DC-9 Series Airplanes
aircraft The Boeing Company DC-9-13 Airworthiness Directives; MCDONNELL DOUGLAS DC-9 Series Airplanes
aircraft The Boeing Company DC-9-14 Airworthiness Directives; MCDONNELL DOUGLAS DC-9 Series Airplanes
aircraft The Boeing Company DC-9-15 Airworthiness Directives; MCDONNELL DOUGLAS DC-9 Series Airplanes
aircraft The Boeing Company DC-9-15F Airworthiness Directives; MCDONNELL DOUGLAS DC-9 Series Airplanes
aircraft The Boeing Company DC-9-21 Airworthiness Directives; MCDONNELL DOUGLAS DC-9 Series Airplanes
aircraft The Boeing Company DC-9-31 Airworthiness Directives; MCDONNELL DOUGLAS DC-9 Series Airplanes
aircraft The Boeing Company DC-9-32 Airworthiness Directives; MCDONNELL DOUGLAS DC-9 Series Airplanes
aircraft The Boeing Company DC-9-32 (VC-9C) Airworthiness Directives; MCDONNELL DOUGLAS DC-9 Series Airplanes

Unsafe Condition

Arcing, burning, or chafing of electrical wiring along the left and right overhead stowage compartment rail assemblies in the vicinity of each electrical bonding strap could lead to fire and smoke in the passenger cabin.

AI-generated summary from the source AD text. Verify against the official source before acting.

Required Actions

Visually inspect the electrical wiring along the overhead stowage compartment rail assemblies for damage, repair if necessary before further flight, modify the electrical bonding strap installation per Heath Tecna Alert Service Bulletin ESCI-25-A1, and comply with the service bulletin for modification requirements.

AI-generated summary from the source AD text. Verify against the official source before acting.

Compliance Time

within 18 months after the effective date of this AD, unless previously accomplished

AI-generated summary from the source AD text. Verify against the official source before acting.

Affected Aircraft

MCDONNELL DOUGLAS DC-9 series airplanes listed in Heath Tecna Service Bulletin ESCI-25-A1, dated April 30, 1990, certificated in any category.

AI-generated summary from the source AD text. Verify against the official source before acting.

Source: Official FAA Source ↗

Retrieved: Apr 8, 2026

Rights: U.S. Government Public Domain

This site is not affiliated with or endorsed by the FAA. Always verify with official sources.