AD 91-05-17
Applicability
| Type | Manufacturer | Model | Details |
|---|---|---|---|
| aircraft | The Boeing Company | 747-100 Series | Airworthiness Directives; BOEING Model 747 Series Airplanes |
| aircraft | The Boeing Company | 747-100B Series | Airworthiness Directives; BOEING Model 747 Series Airplanes |
| aircraft | The Boeing Company | 747-100B SUD Series | Airworthiness Directives; BOEING Model 747 Series Airplanes |
| aircraft | The Boeing Company | 747-200B Series | Airworthiness Directives; BOEING Model 747 Series Airplanes |
| aircraft | The Boeing Company | 747-200C Series | Airworthiness Directives; BOEING Model 747 Series Airplanes |
| aircraft | The Boeing Company | 747-200F Series | Airworthiness Directives; BOEING Model 747 Series Airplanes |
| aircraft | The Boeing Company | 747-300 Series | Airworthiness Directives; BOEING Model 747 Series Airplanes |
| aircraft | The Boeing Company | 747-400 Series | Airworthiness Directives; BOEING Model 747 Series Airplanes |
| aircraft | The Boeing Company | 747-400D Series | Airworthiness Directives; BOEING Model 747 Series Airplanes |
| aircraft | The Boeing Company | 747-400F Series | Airworthiness Directives; BOEING Model 747 Series Airplanes |
| aircraft | The Boeing Company | 747SP Series | Airworthiness Directives; BOEING Model 747 Series Airplanes |
| aircraft | The Boeing Company | 747SR Series | Airworthiness Directives; BOEING Model 747 Series Airplanes |
Unsafe Condition
Cracks in the fuselage station 2598 bulkhead upper web in the corners of the access cut-out could lead to loss of the horizontal stabilizer.
AI-generated summary from the source AD text. Verify against the official source before acting.
Required Actions
Perform a close detailed visual inspection or high frequency eddy current (HFEC) inspection of the fuselage station 2598 bulkhead upper web within 30 days after April 13, 1990. Repeat inspections within 250 landings (if visual) or 1,000 landings (if HFEC). Remove fasteners, inspect open holes, replace with oversized fasteners, repair cracks under 1.5 inches prior to flight, or install terminating modification within 2 years of AD effective date.
AI-generated summary from the source AD text. Verify against the official source before acting.
Compliance Time
Within the next 30 days after April 13, 1990 (the effective date of Amendment 39-6556), and repeat as specified. Terminating modification must be accomplished within 2 years after the effective date of this AD.
AI-generated summary from the source AD text. Verify against the official source before acting.
Affected Aircraft
BOEING Model 747 series airplanes, line numbers 002 through 226, certificated in any category.
AI-generated summary from the source AD text. Verify against the official source before acting.
Federal Register Abstract
Fuselage inspection
Applicability Source Text
Show captured applicability text from the source AD
AD Final Rules - DRS_91-05-17.html Copy URL Print/Save as PDF Document Versions Feedback Details AD Number: 91-05-17 Document Type: AD Final Rules Docket Number: 90-NM-209-AD Subject Heading: Airworthiness Directives; BOEING Model 747 Series Airplanes Subject: Fuselage inspection Status: Current Citation: This information is not available. Citation Publish Date: Effective Date: 04/05/1991 Make: The Boeing Company Model: 747-100 Series | 747-100B Series | 747-100B SUD Series | 747-200B Series | 747-200C Series | 747-200...Show more Product Type: Aircraft Product Subtype: Large Airplane Affected AD: Superseded AD: Affected By: Superseded By: Service/Office: Office of Primary Responsibility: CFR Part Reference: Part 39 Comments: AIRWORTHINESS DIRECTIVES FINAL RULES: 91-05-17 CITATION: This information is not available. PAGE NUMBER: DOCKET NUMBER: 90-NM-209-AD AMENDMENT: 39-6917 AD NUMBER: 91-05-17 SUBJECT HEADING: Airworthiness Directives; BOEING Model 747 Series Airplanes ACTION: SUMMARY: DATES: Effective April 5, 1991. ADDRESSES: FOR FURTHER INFORMATION CONTACT: SUPPLEMENTARY INFORMATION: REGULATORY TEXT: 91-05-17 BOEING: Amendment 39-6917. Docket No. 90-NM-209-AD. Applicability: Model 747 series airplanes, line numbers 002 through 226, certificated in any category. Compliance: Required as indicated, unless previously accomplished. To prevent loss of the horizontal stabilizer, accomplish the following: A. Within the next 30 days after April 13, 1990 (the effective date of Amendment 39-6556), perform either a close detailed visual inspection or a high frequency eddy current (HFEC) inspection of the fuselage station 2598 bulkhead upper web in the corners of the access cut-out, in accordance with Boeing Alert Service Bulletin 747-53A2332, dated March 8, 1990. Repeat these inspections as follows: 1. If the immediately preceding inspection was accomplished visually, the next inspection must be conducted within 250 landings. 2. If the immediately preceding inspection was accomplished using HFEC, the next inspection must be conducted within 1,000 landings. B. If cracks less than 1.5 inches are found, repair prior to further flight, in accordance with repair procedures defined in Boeing Alert Service Bulletin 747-53A2332, dated March 8, 1990, or accomplish the terminating modification specified in paragraph E. of this AD. Inspect repairs for cracks in accordance with paragraph A. of this AD, until the terminating modification specified in paragraph E. of this AD, is accomplished. C. If cracks are found that are 1.5 inches or longer, modify prior to further flight by installing the terminating modification specified in paragraph E. of this AD. D. Within the next 30 days after April 13, 1990 (the effective date of Amendment 39-6556), remove the fastener common to the web and the tab on the vertical stiffener, at each corner of the upper bulkhead cut-out, and perform a high frequency eddy current inspection of the open hole in accordance with Boeing Alert Service Bulletin 747-53A2332, dated March 8, 1990. If no cracks are found, replace the fastener with a 1/16-inch oversized equivalent fastener. If any cracks are found, prior to further flight, accomplish the repair and inspections required by paragraph B. of this AD, or modify prior to further flight in accordance with the terminating modification specified in paragraph E. of this AD. E. Within the next 2 years after the effective date of this AD, accomplish the terminating modification specified in Boeing Alert Service Bulletin 747-53A2332, dated March 8, 1990. Installation of the modification constitutes terminating action for the inspections required by this AD. F. An alternate means of compliance or adjustment of the compliance time, which provides an acceptable level of safety, may be used when approved by the Manager, Seattle Aircraft Certification Office (ACO), FAA, Transport Airplane Directorate. NOTE: The request should be submitted directly to the Manager, Seattle ACO, and a copy sent to the cognizant FAA Principal Inspector (PI). The PI will then forward comments or concurrence to the Seattle ACO. NOTE: Any alternate means of compliance previously approved for paragraph G. of AD 90-07-11, Amendment 39-6556, constitutes an alternate means of compliance with paragraph F. of this AD. G. Special flight permits may be issued in accordance with FAR 21.197 and 21.199 to operate airplanes to a base in order to comply with the requirements of this AD. All persons affected by this directive who have not already received the appropriate service information from the manufacturer may obtain copies upon request to Boeing Commercial Airplane Group, P.O. Box 3707, Seattle, Washington 98124. This information may be examined at the FAA, Northwest Mountain Region, Transport Airplane Directorate, 1601 Lind Avenue SW., Renton, Washington. Airworthiness Directive 91-05-17 supersedes AD 90-07-11, Amendment 39-6556. This amendment (39-6917, AD 91-05-17) becomes effective on April 5, 1991. FOOTER:
Document Text
Show stored source text (verify against official source)
AD Final Rules - DRS_91-05-17.html Copy URL Print/Save as PDF Document Versions Feedback Details AD Number: 91-05-17 Document Type: AD Final Rules Docket Number: 90-NM-209-AD Subject Heading: Airworthiness Directives; BOEING Model 747 Series Airplanes Subject: Fuselage inspection Status: Current Citation: This information is not available. Citation Publish Date: Effective Date: 04/05/1991 Make: The Boeing Company Model: 747-100 Series | 747-100B Series | 747-100B SUD Series | 747-200B Series | 747-200C Series | 747-200...Show more Product Type: Aircraft Product Subtype: Large Airplane Affected AD: Superseded AD: Affected By: Superseded By: Service/Office: Office of Primary Responsibility: CFR Part Reference: Part 39 Comments: AIRWORTHINESS DIRECTIVES FINAL RULES: 91-05-17 CITATION: This information is not available. PAGE NUMBER: DOCKET NUMBER: 90-NM-209-AD AMENDMENT: 39-6917 AD NUMBER: 91-05-17 SUBJECT HEADING: Airworthiness Directives; BOEING Model 747 Series Airplanes ACTION: SUMMARY: DATES: Effective April 5, 1991. ADDRESSES: FOR FURTHER INFORMATION CONTACT: SUPPLEMENTARY INFORMATION: REGULATORY TEXT: 91-05-17 BOEING: Amendment 39-6917. Docket No. 90-NM-209-AD. Applicability: Model 747 series airplanes, line numbers 002 through 226, certificated in any category. Compliance: Required as indicated, unless previously accomplished. To prevent loss of the horizontal stabilizer, accomplish the following: A. Within the next 30 days after April 13, 1990 (the effective date of Amendment 39-6556), perform either a close detailed visual inspection or a high frequency eddy current (HFEC) inspection of the fuselage station 2598 bulkhead upper web in the corners of the access cut-out, in accordance with Boeing Alert Service Bulletin 747-53A2332, dated March 8, 1990. Repeat these inspections as follows: 1. If the immediately preceding inspection was accomplished visually, the next inspection must be conducted within 250 landings. 2. If the immediately preceding inspection was accomplished using HFEC, the next inspection must be conducted within 1,000 landings. B. If cracks less than 1.5 inches are found, repair prior to further flight, in accordance with repair procedures defined in Boeing Alert Service Bulletin 747-53A2332, dated March 8, 1990, or accomplish the terminating modification specified in paragraph E. of this AD. Inspect repairs for cracks in accordance with paragraph A. of this AD, until the terminating modification specified in paragraph E. of this AD, is accomplished. C. If cracks are found that are 1.5 inches or longer, modify prior to further flight by installing the terminating modification specified in paragraph E. of this AD. D. Within the next 30 days after April 13, 1990 (the effective date of Amendment 39-6556), remove the fastener common to the web and the tab on the vertical stiffener, at each corner of the upper bulkhead cut-out, and perform a high frequency eddy current inspection of the open hole in accordance with Boeing Alert Service Bulletin 747-53A2332, dated March 8, 1990. If no cracks are found, replace the fastener with a 1/16-inch oversized equivalent fastener. If any cracks are found, prior to further flight, accomplish the repair and inspections required by paragraph B. of this AD, or modify prior to further flight in accordance with the terminating modification specified in paragraph E. of this AD. E. Within the next 2 years after the effective date of this AD, accomplish the terminating modification specified in Boeing Alert Service Bulletin 747-53A2332, dated March 8, 1990. Installation of the modification constitutes terminating action for the inspections required by this AD. F. An alternate means of compliance or adjustment of the compliance time, which provides an acceptable level of safety, may be used when approved by the Manager, Seattle Aircraft Certification Office (ACO), FAA, Transport Airplane Directorate. NOTE: The request should be submitted directly to the Manager, Seattle ACO, and a copy sent to the cognizant FAA Principal Inspector (PI). The PI will then forward comments or concurrence to the Seattle ACO. NOTE: Any alternate means of compliance previously approved for paragraph G. of AD 90-07-11, Amendment 39-6556, constitutes an alternate means of compliance with paragraph F. of this AD. G. Special flight permits may be issued in accordance with FAR 21.197 and 21.199 to operate airplanes to a base in order to comply with the requirements of this AD. All persons affected by this directive who have not already received the appropriate service information from the manufacturer may obtain copies upon request to Boeing Commercial Airplane Group, P.O. Box 3707, Seattle, Washington 98124. This information may be examined at the FAA, Northwest Mountain Region, Transport Airplane Directorate, 1601 Lind Avenue SW., Renton, Washington. Airworthiness Directive 91-05-17 supersedes AD 90-07-11, Amendment 39-6556. This amendment (39-6917, AD 91-05-17) becomes effective on April 5, 1991. FOOTER:
Source: Official FAA Source ↗
Retrieved: Apr 8, 2026
Rights: U.S. Government Public Domain
This site is not affiliated with or endorsed by the FAA. Always verify with official sources.