AD 90-16-05
Applicability
| Type | Manufacturer | Model | Details |
|---|---|---|---|
| aircraft | The Boeing Company | DC-8-11 | Airworthiness Directives; MCDONNELL DOUGLAS DC-8 Series Airplanes |
| aircraft | The Boeing Company | DC-8-12 | Airworthiness Directives; MCDONNELL DOUGLAS DC-8 Series Airplanes |
| aircraft | The Boeing Company | DC-8-21 | Airworthiness Directives; MCDONNELL DOUGLAS DC-8 Series Airplanes |
| aircraft | The Boeing Company | DC-8-31 | Airworthiness Directives; MCDONNELL DOUGLAS DC-8 Series Airplanes |
| aircraft | The Boeing Company | DC-8-32 | Airworthiness Directives; MCDONNELL DOUGLAS DC-8 Series Airplanes |
| aircraft | The Boeing Company | DC-8-33 | Airworthiness Directives; MCDONNELL DOUGLAS DC-8 Series Airplanes |
| aircraft | The Boeing Company | DC-8-41 | Airworthiness Directives; MCDONNELL DOUGLAS DC-8 Series Airplanes |
| aircraft | The Boeing Company | DC-8-42 | Airworthiness Directives; MCDONNELL DOUGLAS DC-8 Series Airplanes |
| aircraft | The Boeing Company | DC-8-43 | Airworthiness Directives; MCDONNELL DOUGLAS DC-8 Series Airplanes |
| aircraft | The Boeing Company | DC-8-51 | Airworthiness Directives; MCDONNELL DOUGLAS DC-8 Series Airplanes |
| aircraft | The Boeing Company | DC-8-52 | Airworthiness Directives; MCDONNELL DOUGLAS DC-8 Series Airplanes |
| aircraft | The Boeing Company | DC-8-53 | Airworthiness Directives; MCDONNELL DOUGLAS DC-8 Series Airplanes |
| aircraft | The Boeing Company | DC-8-55 | Airworthiness Directives; MCDONNELL DOUGLAS DC-8 Series Airplanes |
| aircraft | The Boeing Company | DC-8-61 | Airworthiness Directives; MCDONNELL DOUGLAS DC-8 Series Airplanes |
| aircraft | The Boeing Company | DC-8-61F | Airworthiness Directives; MCDONNELL DOUGLAS DC-8 Series Airplanes |
| aircraft | The Boeing Company | DC-8-62 | Airworthiness Directives; MCDONNELL DOUGLAS DC-8 Series Airplanes |
| aircraft | The Boeing Company | DC-8-62F | Airworthiness Directives; MCDONNELL DOUGLAS DC-8 Series Airplanes |
| aircraft | The Boeing Company | DC-8-63 | Airworthiness Directives; MCDONNELL DOUGLAS DC-8 Series Airplanes |
| aircraft | The Boeing Company | DC-8-63F | Airworthiness Directives; MCDONNELL DOUGLAS DC-8 Series Airplanes |
| aircraft | The Boeing Company | DC-8-71 | Airworthiness Directives; MCDONNELL DOUGLAS DC-8 Series Airplanes |
| aircraft | The Boeing Company | DC-8-71F | Airworthiness Directives; MCDONNELL DOUGLAS DC-8 Series Airplanes |
| aircraft | The Boeing Company | DC-8-72 | Airworthiness Directives; MCDONNELL DOUGLAS DC-8 Series Airplanes |
| aircraft | The Boeing Company | DC-8-72F | Airworthiness Directives; MCDONNELL DOUGLAS DC-8 Series Airplanes |
| aircraft | The Boeing Company | DC-8-73 | Airworthiness Directives; MCDONNELL DOUGLAS DC-8 Series Airplanes |
| aircraft | The Boeing Company | DC-8-73F | Airworthiness Directives; MCDONNELL DOUGLAS DC-8 Series Airplanes |
| aircraft | The Boeing Company | DC-8F-54 | Airworthiness Directives; MCDONNELL DOUGLAS DC-8 Series Airplanes |
| aircraft | The Boeing Company | DC-8F-55 | Airworthiness Directives; MCDONNELL DOUGLAS DC-8 Series Airplanes |
Unsafe Condition
Structural failure due to cracks in the airframe.
AI-generated summary from the source AD text. Verify against the official source before acting.
Required Actions
Inspect for cracks within one repetitive inspection interval or at the inspection threshold specified in MDC K1579, repeat inspections at intervals per service bulletins. If cracks are found, repair or modify per approved data before further flight. Accomplish structural modifications within 4 years or by specified dates per MDC K1579.
AI-generated summary from the source AD text. Verify against the official source before acting.
Compliance Time
Within one repetitive inspection interval specified in the service bulletins listed in Table 2.1 of MDC K1579 after the effective date of this AD, or at the inspection threshold specified in MDC K1579, whichever is later. Modifications must be done within 4 years after the effective date or by incorporation thresholds listed in the document.
AI-generated summary from the source AD text. Verify against the official source before acting.
Affected Aircraft
McDonnell Douglas DC-8 series airplanes as listed in McDonnell Douglas Report No. MDC K1579, Revision A, dated March 1, 1990.
AI-generated summary from the source AD text. Verify against the official source before acting.
Federal Register Abstract
Report MDC K1579 - Inspect For Cracks
Applicability Source Text
Show captured applicability text from the source AD
AD Final Rules - DRS_90-16-05.html Copy URL Print/Save as PDF Document Versions Feedback Details AD Number: 90-16-05 Document Type: AD Final Rules Docket Number: 89-NM-196-AD Subject Heading: Airworthiness Directives; MCDONNELL DOUGLAS DC-8 Series Airplanes Subject: Report MDC K1579 - Inspect For Cracks Status: Current Citation: This information is not available. Citation Publish Date: Effective Date: 09/10/1990 Make: The Boeing Company Model: DC-8-11 | DC-8-12 | DC-8-21 | DC-8-31 | DC-8-32 | DC-8-33 | DC-8-41 | DC-8-42 | DC-8-43 | DC-8-51 | ...Show more Product Type: Aircraft Product Subtype: Large Airplane Affected AD: Superseded AD: Affected By: Superseded By: Service/Office: Office of Primary Responsibility: CFR Part Reference: Part 39 Comments: AIRWORTHINESS DIRECTIVES FINAL RULES: 90-16-05 CITATION: This information is not available. PAGE NUMBER: DOCKET NUMBER: 89-NM-196-AD AMENDMENT: 39-6614 AD NUMBER: 90-16-05 SUBJECT HEADING: Airworthiness Directives; MCDONNELL DOUGLAS DC-8 Series Airplanes ACTION: SUMMARY: DATES: Effective September 10, 1990. ADDRESSES: FOR FURTHER INFORMATION CONTACT: SUPPLEMENTARY INFORMATION: REGULATORY TEXT: 90-16-05 MCDONNELL DOUGLAS: Amendment 39-6614. Docket No. 89-NM-196-AD. Applicability: Model DC-8 series airplanes, as listed in McDonnell Douglas Report No. MDC K1579, Revision A, dated March 1, 1990, certificated in any category. Compliance: Required as indicated, unless previously accomplished. To prevent structural failure, accomplish the following: A. Within one repetitive inspection interval specified in the service bulletins listed in Table 2.1 of "DC-8 Aging Aircraft Service Action Requirements Document", McDonnell Douglas Report MDC K1579, Revision A, dated March 1, 1990 (hereinafter referred to as "The Document") after the effective date of this AD, or at the inspection threshold specified in McDonnell Douglas Report No. MDC K1579, Revision A, dated March 1, 1990, whichever is later (unless currently being accomplished), begin performing inspections for cracks in accordance with the service bulletins listed in Table 2.1 of The Document. Repeat these inspections at intervals specified in the applicable service bulletins listed in Table 2.1 of The Document. 1. If cracks are found during any inspection, prior to further flight, either accomplish the terminating modification in accordance with the applicable service bulletin, or repair in accordance with data approved by the Manager, Los Angeles Aircraft Certification Office, FAA, Northwest Mountain Region. NOTE: Detection of discrepancies other than cracking necessitates appropriate corrective action in accordance with the provisions of Part 43 of the Federal Aviation Regulations (FAR). 2. Modification in accordance with paragraph B. of this AD terminates individual inspection requirements of the applicable service bulletin. B. Except as provided below, prior to reaching the incorporation thresholds listed in The Document or within 4 years after the effective date of this AD, whichever occurs later, accomplish the structural modifications in accordance with the service bulletins listed in The Document. Modifications whose time for accomplishment is specified in The Document by a calendar date must be accomplished by that date in lieu of the 4 years specified in this paragraph. NOTE: The modification required by this paragraph does not terminate the inspection requirements of any other AD unless that AD specifies that any such modification constitutes terminating action for the inspection requirements. C. An alternate means of compliance or adjustment of the compliance time, which provides an acceptable level of safety, may be used when approved by the Manager, Los Angeles Aircraft Certification Office, FAA, Northwest Mountain Region. NOTE: The request should be forwarded through an FAA Principal Maintenance Inspector (PMI), who will either concur or comment, and then send it to the Manager, Los Angeles Aircraft Certification Office. D. Special flight permits may be issued in accordance with FAR 21.197 and 21.199 to operate airplanes to a base in order to comply with the requirements of this AD. The inspections and modifications shall be done in accordance with "DC-8 Aging Aircraft Service Action Requirements Document," McDonnell Douglas Report MDC K1579, Revision A, dated March 1, 1990, which incorporates the following list of effective pages: Page Number Revision Date i A March 1, 1990 ii Original September 12, 1989 iii - vii A March 1, 1990 1 - 4 Original September 12, 1989 5 - 12 A March 1, 1990 13 Original September 12, 1989 14 - 18 A March 1, 1990 19 Original September 12, 1989 20 - 21 A March 1, 1990 This incorporation by reference was approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR Part 51. Copies may be obtained from McDonnell Douglas Corporation, 3855 Lakewood Boulevard, Long Beach, California 90846-0001, Attention: Director, Publication and Training, C1-750 (54-60). Copies may be inspected at the FAA, Northwest Mountain Region, Transport Airplane Directorate, 17900 Pacific Highway South, Seattle, Washington; or at the Los Angeles Aircraft Certification Office, 3229 East Spring Street, Long Beach, California; or at the Office of the Federal Register, 1100 L Street, N.W., Room 8301, Washington, D.C. This amendment (39-6614, AD 90-16-05) becomes effective on September 10, 1990. FOOTER:
Document Text
Show stored source text (verify against official source)
AD Final Rules - DRS_90-16-05.html Copy URL Print/Save as PDF Document Versions Feedback Details AD Number: 90-16-05 Document Type: AD Final Rules Docket Number: 89-NM-196-AD Subject Heading: Airworthiness Directives; MCDONNELL DOUGLAS DC-8 Series Airplanes Subject: Report MDC K1579 - Inspect For Cracks Status: Current Citation: This information is not available. Citation Publish Date: Effective Date: 09/10/1990 Make: The Boeing Company Model: DC-8-11 | DC-8-12 | DC-8-21 | DC-8-31 | DC-8-32 | DC-8-33 | DC-8-41 | DC-8-42 | DC-8-43 | DC-8-51 | ...Show more Product Type: Aircraft Product Subtype: Large Airplane Affected AD: Superseded AD: Affected By: Superseded By: Service/Office: Office of Primary Responsibility: CFR Part Reference: Part 39 Comments: AIRWORTHINESS DIRECTIVES FINAL RULES: 90-16-05 CITATION: This information is not available. PAGE NUMBER: DOCKET NUMBER: 89-NM-196-AD AMENDMENT: 39-6614 AD NUMBER: 90-16-05 SUBJECT HEADING: Airworthiness Directives; MCDONNELL DOUGLAS DC-8 Series Airplanes ACTION: SUMMARY: DATES: Effective September 10, 1990. ADDRESSES: FOR FURTHER INFORMATION CONTACT: SUPPLEMENTARY INFORMATION: REGULATORY TEXT: 90-16-05 MCDONNELL DOUGLAS: Amendment 39-6614. Docket No. 89-NM-196-AD. Applicability: Model DC-8 series airplanes, as listed in McDonnell Douglas Report No. MDC K1579, Revision A, dated March 1, 1990, certificated in any category. Compliance: Required as indicated, unless previously accomplished. To prevent structural failure, accomplish the following: A. Within one repetitive inspection interval specified in the service bulletins listed in Table 2.1 of "DC-8 Aging Aircraft Service Action Requirements Document", McDonnell Douglas Report MDC K1579, Revision A, dated March 1, 1990 (hereinafter referred to as "The Document") after the effective date of this AD, or at the inspection threshold specified in McDonnell Douglas Report No. MDC K1579, Revision A, dated March 1, 1990, whichever is later (unless currently being accomplished), begin performing inspections for cracks in accordance with the service bulletins listed in Table 2.1 of The Document. Repeat these inspections at intervals specified in the applicable service bulletins listed in Table 2.1 of The Document. 1. If cracks are found during any inspection, prior to further flight, either accomplish the terminating modification in accordance with the applicable service bulletin, or repair in accordance with data approved by the Manager, Los Angeles Aircraft Certification Office, FAA, Northwest Mountain Region. NOTE: Detection of discrepancies other than cracking necessitates appropriate corrective action in accordance with the provisions of Part 43 of the Federal Aviation Regulations (FAR). 2. Modification in accordance with paragraph B. of this AD terminates individual inspection requirements of the applicable service bulletin. B. Except as provided below, prior to reaching the incorporation thresholds listed in The Document or within 4 years after the effective date of this AD, whichever occurs later, accomplish the structural modifications in accordance with the service bulletins listed in The Document. Modifications whose time for accomplishment is specified in The Document by a calendar date must be accomplished by that date in lieu of the 4 years specified in this paragraph. NOTE: The modification required by this paragraph does not terminate the inspection requirements of any other AD unless that AD specifies that any such modification constitutes terminating action for the inspection requirements. C. An alternate means of compliance or adjustment of the compliance time, which provides an acceptable level of safety, may be used when approved by the Manager, Los Angeles Aircraft Certification Office, FAA, Northwest Mountain Region. NOTE: The request should be forwarded through an FAA Principal Maintenance Inspector (PMI), who will either concur or comment, and then send it to the Manager, Los Angeles Aircraft Certification Office. D. Special flight permits may be issued in accordance with FAR 21.197 and 21.199 to operate airplanes to a base in order to comply with the requirements of this AD. The inspections and modifications shall be done in accordance with "DC-8 Aging Aircraft Service Action Requirements Document," McDonnell Douglas Report MDC K1579, Revision A, dated March 1, 1990, which incorporates the following list of effective pages: Page Number Revision Date i A March 1, 1990 ii Original September 12, 1989 iii - vii A March 1, 1990 1 - 4 Original September 12, 1989 5 - 12 A March 1, 1990 13 Original September 12, 1989 14 - 18 A March 1, 1990 19 Original September 12, 1989 20 - 21 A March 1, 1990 This incorporation by reference was approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR Part 51. Copies may be obtained from McDonnell Douglas Corporation, 3855 Lakewood Boulevard, Long Beach, California 90846-0001, Attention: Director, Publication and Training, C1-750 (54-60). Copies may be inspected at the FAA, Northwest Mountain Region, Transport Airplane Directorate, 17900 Pacific Highway South, Seattle, Washington; or at the Los Angeles Aircraft Certification Office, 3229 East Spring Street, Long Beach, California; or at the Office of the Federal Register, 1100 L Street, N.W., Room 8301, Washington, D.C. This amendment (39-6614, AD 90-16-05) becomes effective on September 10, 1990. FOOTER:
Source: Official FAA Source ↗
Retrieved: Apr 8, 2026
Rights: U.S. Government Public Domain
This site is not affiliated with or endorsed by the FAA. Always verify with official sources.