AD 89-09-06
Applicability
| Type | Manufacturer | Model | Details |
|---|---|---|---|
| aircraft | Airbus SAS | BAC 1-11 200 Series | Airworthiness Directives; BRITISH AEROSPACE Model BAC 1-11 200 and 400 Series Airplanes |
| aircraft | Airbus SAS | BAC 1-11 400 Series | Airworthiness Directives; BRITISH AEROSPACE Model BAC 1-11 200 and 400 Series Airplanes |
Unsafe Condition
Collapse of the main landing gear due to undetected cracks in the support beams.
AI-generated summary from the source AD text. Verify against the official source before acting.
Required Actions
Perform initial and repetitive ultrasonic and eddy current inspections of the main landing gear support beams as per BAe Alert Service Bulletin 57-A-PM6000. Repair cracks prior to further flight. Install part number EDO3-5007/8 (Modification PM5928) to terminate AD requirements. Alternate compliance may be approved by the FAA Manager.
AI-generated summary from the source AD text. Verify against the official source before acting.
Compliance Time
Initial inspections must be completed within specified timeframes (e.g., 300 landings after July 30, 1987, or within 3/6/8 years since installation) depending on airplane serial number and modification status. Repetitive inspections at intervals not exceeding 12, 36, or 24 months as specified.
AI-generated summary from the source AD text. Verify against the official source before acting.
Affected Aircraft
British Aerospace Model BAC 1-11 200 and 400 series airplanes with Modification PM3070 installed and PM5928 not installed.
AI-generated summary from the source AD text. Verify against the official source before acting.
Federal Register Abstract
Main Landing Gear
Applicability Source Text
Show captured applicability text from the source AD
AD Final Rules - DRS_89-09-06.html Copy URL Print/Save as PDF Document Versions Feedback Details AD Number: 89-09-06 Document Type: AD Final Rules Docket Number: Unknown Subject Heading: Airworthiness Directives; BRITISH AEROSPACE Model BAC 1-11 200 and 400 Series Airplanes Subject: Main Landing Gear Status: Current Citation: This information is not available. Citation Publish Date: Effective Date: 05/16/1989 Make: Airbus SAS Model: BAC 1-11 200 Series | BAC 1-11 400 Series Product Type: Aircraft Product Subtype: Large Airplane Affected AD: Superseded AD: Affected By: Superseded By: Service/Office: Office of Primary Responsibility: CFR Part Reference: Part 39 Comments: AIRWORTHINESS DIRECTIVES FINAL RULES: 89-09-06 CITATION: This information is not available. PAGE NUMBER: DOCKET NUMBER: Unknown AMENDMENT: 39-6193 AD NUMBER: 89-09-06 SUBJECT HEADING: Airworthiness Directives; BRITISH AEROSPACE Model BAC 1-11 200 and 400 Series Airplanes ACTION: SUMMARY: DATES: Effective on May 16, 1989. ADDRESSES: FOR FURTHER INFORMATION CONTACT: SUPPLEMENTARY INFORMATION: REGULATORY TEXT: 89-09-06 BRITISH AEROSPACE: Amendment 39-6193. Applicability: All Model BAC 1-11 200 and 400 series airplanes, on which British Aerospace (BAe) main landing gear support structure Modification PM3070 is installed and Modification PM5928 has not been installed, certificated in any category. Compliance: Required as indicated, unless previously accomplished. To prevent collapse of a main landing gear, accomplish the following: A. Perform initial and repetitive ultrasonic and eddy current inspections of the main landing gear support beams at initial times and repetitive intervals shown in Table I of this AD using procedures in BAe Alert Service Bulletin 57-A-PM6000, Issue 2, dated February 17, 1988. TABLE I Airplane Identification Modification PM6000 Accomplishment Status Initial Inspection Compliance Time Repetitive Compliance Time Interval After Initial Inspection Serial Numbers up to and including 402 Not Accomplished Whichever occurs later: -within 300 landings after July 30, 1987, (the effective date of AD 87-13-03, Amendment 39-5654); or -within 3 years since installation of new left and right main support beams. Ultrasonic inspection: at intervals not to exceed 12 months. Eddy current inspections: at intervals not to exceed 36 months. Airplane Identification Modification PM6000 Accomplishment Status Initial Inspection Compliance Time Repetitive Compliance Time Interval After Initial Inspection Serial Numbers 403 and subsequent Not Accomplished Whichever occurs later: -within the next 300 landings after July 30, 1987 (the effective date AD 87-13-03 Amendment 39-5654); or -within 6 years since new; or -within 6 years since installation of new left and right main support beams. Ultrasonic inspections: at intervals not to exceed 12 months. Eddy current inspections: at intervals not to exceed 36 months. For all A/P's on which Mod. PM6000 is accomplished prior to assembly of main support beam into wing Accomplished Whichever occurs later: -within 8 years since new; or -within 8 years since new right and left main support beams are installed. Ultrasonic inspections: at intervals not to exceed 2 years. For all A/P's on which Mod. PM6000 is accomplished after assembly of main support beam into wing. Accomplished Within 2 years after installation of Modification PM6000 Ultrasonic inspections: at intervals not to exceed 2 years B. Cracks in the main landing gear main support beam must be repaired, prior to further flight, in a manner approved by the Manager, Standardization Branch, ANM-113, FAA, Northwest Mountain Region. C. Installation of main support beam, part number EDO3-5007/8 (Modification PM5928) constitutes terminating action for the requirements of this AD. D. An alternate means of compliance or adjustment of the compliance time, which provides an acceptable level of safety, may be used when approved by the Manager, Standardization Branch, ANM-113, FAA, Northwest Mountain Region. NOTE: The request should be forwarded through an FAA Principal Maintenance Inspector (PMI), who may add any comments and then send it to the Manager, Standardization Branch, ANM-113. E. Special flight permits may be issued in accordance with FAR 21.197 and 21.199 to operate airplanes to a base for the accomplishment of the modifications required by this AD. All persons affected by this directive who have not already received the appropriate service documents from the manufacturer may obtain copies upon request to British Aerospace PLC, Librarian for Service Bulletins, P.O. Box 17414, Dulles International Airport, Washington, D.C. 20041. These documents may be examined at the FAA, Northwest Mountain Region, 17900 Pacific Highway South, Seattle, Washington, or Seattle Aircraft Certification Office, 9010 East Marginal Way South, Seattle, Washington. This AD supersedes AD 87-13-03 (Amendment 39-5654) which became effective on July 30, 1987. This amendment (39-6193, AD 89-09-06) becomes effective on May 16, 1989. FOOTER:
Document Text
Show stored source text (verify against official source)
AD Final Rules - DRS_89-09-06.html Copy URL Print/Save as PDF Document Versions Feedback Details AD Number: 89-09-06 Document Type: AD Final Rules Docket Number: Unknown Subject Heading: Airworthiness Directives; BRITISH AEROSPACE Model BAC 1-11 200 and 400 Series Airplanes Subject: Main Landing Gear Status: Current Citation: This information is not available. Citation Publish Date: Effective Date: 05/16/1989 Make: Airbus SAS Model: BAC 1-11 200 Series | BAC 1-11 400 Series Product Type: Aircraft Product Subtype: Large Airplane Affected AD: Superseded AD: Affected By: Superseded By: Service/Office: Office of Primary Responsibility: CFR Part Reference: Part 39 Comments: AIRWORTHINESS DIRECTIVES FINAL RULES: 89-09-06 CITATION: This information is not available. PAGE NUMBER: DOCKET NUMBER: Unknown AMENDMENT: 39-6193 AD NUMBER: 89-09-06 SUBJECT HEADING: Airworthiness Directives; BRITISH AEROSPACE Model BAC 1-11 200 and 400 Series Airplanes ACTION: SUMMARY: DATES: Effective on May 16, 1989. ADDRESSES: FOR FURTHER INFORMATION CONTACT: SUPPLEMENTARY INFORMATION: REGULATORY TEXT: 89-09-06 BRITISH AEROSPACE: Amendment 39-6193. Applicability: All Model BAC 1-11 200 and 400 series airplanes, on which British Aerospace (BAe) main landing gear support structure Modification PM3070 is installed and Modification PM5928 has not been installed, certificated in any category. Compliance: Required as indicated, unless previously accomplished. To prevent collapse of a main landing gear, accomplish the following: A. Perform initial and repetitive ultrasonic and eddy current inspections of the main landing gear support beams at initial times and repetitive intervals shown in Table I of this AD using procedures in BAe Alert Service Bulletin 57-A-PM6000, Issue 2, dated February 17, 1988. TABLE I Airplane Identification Modification PM6000 Accomplishment Status Initial Inspection Compliance Time Repetitive Compliance Time Interval After Initial Inspection Serial Numbers up to and including 402 Not Accomplished Whichever occurs later: -within 300 landings after July 30, 1987, (the effective date of AD 87-13-03, Amendment 39-5654); or -within 3 years since installation of new left and right main support beams. Ultrasonic inspection: at intervals not to exceed 12 months. Eddy current inspections: at intervals not to exceed 36 months. Airplane Identification Modification PM6000 Accomplishment Status Initial Inspection Compliance Time Repetitive Compliance Time Interval After Initial Inspection Serial Numbers 403 and subsequent Not Accomplished Whichever occurs later: -within the next 300 landings after July 30, 1987 (the effective date AD 87-13-03 Amendment 39-5654); or -within 6 years since new; or -within 6 years since installation of new left and right main support beams. Ultrasonic inspections: at intervals not to exceed 12 months. Eddy current inspections: at intervals not to exceed 36 months. For all A/P's on which Mod. PM6000 is accomplished prior to assembly of main support beam into wing Accomplished Whichever occurs later: -within 8 years since new; or -within 8 years since new right and left main support beams are installed. Ultrasonic inspections: at intervals not to exceed 2 years. For all A/P's on which Mod. PM6000 is accomplished after assembly of main support beam into wing. Accomplished Within 2 years after installation of Modification PM6000 Ultrasonic inspections: at intervals not to exceed 2 years B. Cracks in the main landing gear main support beam must be repaired, prior to further flight, in a manner approved by the Manager, Standardization Branch, ANM-113, FAA, Northwest Mountain Region. C. Installation of main support beam, part number EDO3-5007/8 (Modification PM5928) constitutes terminating action for the requirements of this AD. D. An alternate means of compliance or adjustment of the compliance time, which provides an acceptable level of safety, may be used when approved by the Manager, Standardization Branch, ANM-113, FAA, Northwest Mountain Region. NOTE: The request should be forwarded through an FAA Principal Maintenance Inspector (PMI), who may add any comments and then send it to the Manager, Standardization Branch, ANM-113. E. Special flight permits may be issued in accordance with FAR 21.197 and 21.199 to operate airplanes to a base for the accomplishment of the modifications required by this AD. All persons affected by this directive who have not already received the appropriate service documents from the manufacturer may obtain copies upon request to British Aerospace PLC, Librarian for Service Bulletins, P.O. Box 17414, Dulles International Airport, Washington, D.C. 20041. These documents may be examined at the FAA, Northwest Mountain Region, 17900 Pacific Highway South, Seattle, Washington, or Seattle Aircraft Certification Office, 9010 East Marginal Way South, Seattle, Washington. This AD supersedes AD 87-13-03 (Amendment 39-5654) which became effective on July 30, 1987. This amendment (39-6193, AD 89-09-06) becomes effective on May 16, 1989. FOOTER:
Source: Official FAA Source ↗
Retrieved: Apr 8, 2026
Rights: U.S. Government Public Domain
This site is not affiliated with or endorsed by the FAA. Always verify with official sources.