AD 88-24-08 R2

final rule

Airworthiness Directives; MCDONNELL DOUGLAS DC-9-10, -20, -30, -40, -50, and C-9 (Military) Series Airplanes

AD Number
88-24-08 R2
Status
final_rule
Effective Date
Product Category
aircraft
Docket
89-NM-41-AD
FR Citation
This information is not available.
Technical illustration of a riveted aircraft structural panel and frame
Problem area Airframe structure

Applicability

TypeManufacturerModelDetails
aircraft The Boeing Company DC-9-11 Airworthiness Directives; MCDONNELL DOUGLAS DC-9-10, -20, -30, -40, -50, and C-9 (Military) Series Airplanes
aircraft The Boeing Company DC-9-12 Airworthiness Directives; MCDONNELL DOUGLAS DC-9-10, -20, -30, -40, -50, and C-9 (Military) Series Airplanes
aircraft The Boeing Company DC-9-13 Airworthiness Directives; MCDONNELL DOUGLAS DC-9-10, -20, -30, -40, -50, and C-9 (Military) Series Airplanes
aircraft The Boeing Company DC-9-14 Airworthiness Directives; MCDONNELL DOUGLAS DC-9-10, -20, -30, -40, -50, and C-9 (Military) Series Airplanes
aircraft The Boeing Company DC-9-15 Airworthiness Directives; MCDONNELL DOUGLAS DC-9-10, -20, -30, -40, -50, and C-9 (Military) Series Airplanes
aircraft The Boeing Company DC-9-15F Airworthiness Directives; MCDONNELL DOUGLAS DC-9-10, -20, -30, -40, -50, and C-9 (Military) Series Airplanes
aircraft The Boeing Company DC-9-21 Airworthiness Directives; MCDONNELL DOUGLAS DC-9-10, -20, -30, -40, -50, and C-9 (Military) Series Airplanes
aircraft The Boeing Company DC-9-31 Airworthiness Directives; MCDONNELL DOUGLAS DC-9-10, -20, -30, -40, -50, and C-9 (Military) Series Airplanes
aircraft The Boeing Company DC-9-32 Airworthiness Directives; MCDONNELL DOUGLAS DC-9-10, -20, -30, -40, -50, and C-9 (Military) Series Airplanes
aircraft The Boeing Company DC-9-32 (VC-9C) Airworthiness Directives; MCDONNELL DOUGLAS DC-9-10, -20, -30, -40, -50, and C-9 (Military) Series Airplanes
aircraft The Boeing Company DC-9-32F Airworthiness Directives; MCDONNELL DOUGLAS DC-9-10, -20, -30, -40, -50, and C-9 (Military) Series Airplanes
aircraft The Boeing Company DC-9-32F (C-9A) Airworthiness Directives; MCDONNELL DOUGLAS DC-9-10, -20, -30, -40, -50, and C-9 (Military) Series Airplanes
aircraft The Boeing Company DC-9-32F (C-9B) Airworthiness Directives; MCDONNELL DOUGLAS DC-9-10, -20, -30, -40, -50, and C-9 (Military) Series Airplanes
aircraft The Boeing Company DC-9-33F Airworthiness Directives; MCDONNELL DOUGLAS DC-9-10, -20, -30, -40, -50, and C-9 (Military) Series Airplanes
aircraft The Boeing Company DC-9-34 Airworthiness Directives; MCDONNELL DOUGLAS DC-9-10, -20, -30, -40, -50, and C-9 (Military) Series Airplanes
aircraft The Boeing Company DC-9-34F Airworthiness Directives; MCDONNELL DOUGLAS DC-9-10, -20, -30, -40, -50, and C-9 (Military) Series Airplanes
aircraft The Boeing Company DC-9-41 Airworthiness Directives; MCDONNELL DOUGLAS DC-9-10, -20, -30, -40, -50, and C-9 (Military) Series Airplanes
aircraft The Boeing Company DC-9-51 Airworthiness Directives; MCDONNELL DOUGLAS DC-9-10, -20, -30, -40, -50, and C-9 (Military) Series Airplanes

Unsafe Condition

Fatigue cracking and subsequent failure of the fuselage skin or longerons.

AI-generated summary from the source AD text. Verify against the official source before acting.

Required Actions

Perform initial external low and high frequency eddy current inspections of the fuselage skin and longerons from longeron 7 left through 7 right within specified fuselage stations as per Service Bulletin A53-230, Revision 3. Conduct aided visual inspections of longerons 10 left through 10 right from inside the fuselage, and repeat inspections at intervals not exceeding 5,800 or 2,500 landings depending on chosen option. Repair detected cracks per the service bulletin and consider rework drawing SR09530132 for terminating actions.

AI-generated summary from the source AD text. Verify against the official source before acting.

Compliance Time

Prior to the accumulation of 45,000 landings or within 30 days after January 28, 1989, whichever occurs later, and subsequent intervals as specified.

AI-generated summary from the source AD text. Verify against the official source before acting.

Affected Aircraft

McDonnell Douglas DC-9-10, -20, -30, -40, -50, and C-9 (Military) series airplanes, certificated in any category.

AI-generated summary from the source AD text. Verify against the official source before acting.

Federal Register Abstract

Inspect For Cracks

Applicability Source Text

Show captured applicability text from the source AD
AD Final Rules - DRS_88-24-08_R.html
Copy URL
Print/Save as PDF
Document Versions
 Feedback
Details
AD Number:
88-24-08 R2
Document Type:
AD Final Rules
Docket Number:
89-NM-41-AD
Subject Heading:
Airworthiness Directives; MCDONNELL DOUGLAS DC-9-10, -20, -30, -40, -50, and C-9 (Military) Series Airplanes
Subject:
Inspect For Cracks
Status:
Current
Citation:
This information is not available.
Citation Publish Date:
Effective Date:
02/12/1990
Make:
The Boeing Company
Model:
DC-9-11 | DC-9-12 | DC-9-13 | DC-9-14 | DC-9-15 | DC-9-15F | DC-9-21 | DC-9-31 | DC-9-32 | DC-9-32 (...Show more
Product Type:
Aircraft
Product Subtype:
Large Airplane
Affected AD:
Superseded AD:
Affected By:
Superseded By:
Service/Office:
Office of Primary Responsibility:
CFR Part Reference:
Part 39
Comments:
AIRWORTHINESS DIRECTIVES FINAL RULES: 88-24-08 R2
CITATION:   This information is not available.

PAGE NUMBER:  

DOCKET NUMBER:   89-NM-41-AD

AMENDMENT:   39-6469

AD NUMBER:   88-24-08 R2

SUBJECT HEADING:   Airworthiness Directives; MCDONNELL DOUGLAS DC-9-10, -20, -30, -40, -50, and C-9 (Military) Series Airplanes

ACTION:  

SUMMARY:  

DATES:   Effective February 12, 1990.

ADDRESSES:  

FOR FURTHER INFORMATION CONTACT:  

SUPPLEMENTARY INFORMATION:  

REGULATORY TEXT:  
88-24-08 R2 MCDONNELL DOUGLAS: Amendment 39-6071, as revised by Amendment 39-6108, is further revised by Amendment 39-6469. Docket No. 89-NM-41-AD.

Applicability: Model DC-9-10, -20, -30, -40, -50, and C-9 (Military) series airplanes, certificated in any category.

Compliance: Required as indicated, unless previously accomplished.

To prevent fatigue cracking and subsequent failure of the fuselage skin or longerons, accomplish the following:

A. Prior to the accumulation of 45,000 landings, or within 30 days after January 28, 1989, (the effective date of Amendment 39-6108), whichever occurs later, unless accomplished within the last 2,500 landings, perform initial external low and high frequency eddy current inspections of the fuselage skin and longerons from longeron 7 left through 7 right, in accordance with the accomplishment instructions of McDonnell Douglas DC-9 Alert Service Bulletin A53-230, Revision 3, dated September 28, 1989, within the range of fuselage stations for the particular series airplanes as specified in Table 1 of that service bulletin.

NOTE: Inspections performed in accordance with McDonnell Douglas DC-9 Alert Service Bulletin A53-230, N/C, dated November 2, 1988, Revision 1, dated December 22, 1988, or Revision 2, dated April 21, 1989, meet the requirements of this paragraph.

B. Prior to the accumulation of 30,000 landings, or within 90 days after the effective date of this amendment, whichever occurs later, unless accomplished within the last 2,500 landings, perform initial external low and high frequency eddy current inspections of the fuselage skin and longerons from longeron 7 left through 7 right, in accordance with the accomplishment instructions of McDonnell Douglas DC-9 Alert Service Bulletin A53-230, Revision 3, dated September 28, 1989, within the range of fuselage stations for the particular series airplanes as specified in Table 1 of that Service Bulletin.

NOTE: Inspections performed in accordance with McDonnell Douglas DC-9 Alert Service Bulletin A53-230, N/C, dated November 2, 1988; Revision 1, dated December 22, 1988; or Revision 2, dated April 21, 1989; meet the requirements of this paragraph.

C. Prior to the accumulation of 2,500 landings after the accomplishment of the external inspections in accordance with paragraph A. or B., above, perform an aided visual inspection of the longerons from longeron 10 left through 10 right from inside the fuselage, in accordance with the accomplishment instructions of McDonnell Douglas DC-9 Alert Service Bulletin A53-230, Revision 3, dated September 28, 1989, within the range of fuselage stations for the particular series airplanes as specified in Table 2 of that Service Bulletin.

D. As an option to the initial visual inspection required by paragraph C., above, for airplanes that have previously accomplished an internal visual inspection of only longerons 7 left through 7 right prior to the effective date of this amendment: Prior to the accumulation of 2,500 landings after that internal visual inspection, perform an external high frequency eddy current inspection of longerons 8 left through 10 left, and 8 right through 10 right, within the range of fuselage stations for the particular series airplanes, as specified in Table 2 of McDonnell Douglas DC-9 Alert Service Bulletin A53-230, Revision 3, dated September 28, 1989. Repeat this external eddy current inspection at intervals not to exceed 2,500 landings until the internal visual inspection (of longerons 10 left through 10 right) required by paragraph C., above, is accomplished prior to the accumulation of 7,500 landings after the effective date of this amendment.

E. Except as provided by paragraph D., above, conduct repetitive inspections according to either paragraph E.1. or E.2., below:

1. Repeat the external eddy current and internal visual inspections as required by paragraphs A., or B., and C., above, at intervals not to exceed 5,800 landings: or

2. Repeat the external eddy current inspections as required by paragraph A. or B., above, from longerons 10 left through 10 right at intervals not to exceed 2,500 landings.

F. If cracks are detected prior to further flight, repair in accordance with McDonnell Douglas DC-9 Alert Service Bulletin A53-230, Revision 3, dated September 28, 1989. If Option II, Condition 2, of the Service Bulletin is selected, accomplish removal of interim repair doubler(s) and accomplish permanent longeron repair(s) within 2,500 landings after installation of the interim repair doublers.

G. Completion of the rework procedure defined in McDonnell Douglas Service Rework Drawing SR09530132, Revision B, dated July 28, 1989, constitutes terminating action for the repetitive inspection requirements of this AD.

H. An alternate means of compliance or adjustment of the compliance time, which provides an acceptable level of safety, may be used when approved by the Manager, Los Angeles Aircraft Certification Office, FAA, Northwest Mountain Region.

NOTE: The request should be forwarded through an FAA Principal Maintenance Inspector (PMI), who will either concur or comment and then send it to the Manager, Los Angeles Aircraft Certification Office, FAA, Northwest Mountain Region.

I. Special flight permits may be issued in accordance with FAR 21.197 and 21.199 to operate airplanes to a base in order to comply with the requirements of this AD.

All persons affected by this directive who have not already received the appropriate service documents from the manufacturer may obtain copies upon request to McDonnell Douglas Corporation, 3855 Lakewood Boulevard, Long Beach, California 90846, Attention: Business Unit Manager of Publications, CI-HCO (54-60). These documents may be examined at the FAA, Northwest Mountain Region, Transport Airplane Directorate, 17900 Pacific Highway South, Seattle, Washington, or the Los Angeles Aircraft Certification Office, 3229 East Spring Street, Long Beach, California.

This AD revises AD 88-24-08 R1 (Amendment 39-6108) which revised AD 88-24-08 (Amendment 39-6071).

This amendment (39-6469, AD 88-24-08 R2) becomes effective on February 12, 1990.


FOOTER:

Document Text

Show stored source text (verify against official source)
AD Final Rules - DRS_88-24-08_R.html
Copy URL
Print/Save as PDF
Document Versions
 Feedback
Details
AD Number:
88-24-08 R2
Document Type:
AD Final Rules
Docket Number:
89-NM-41-AD
Subject Heading:
Airworthiness Directives; MCDONNELL DOUGLAS DC-9-10, -20, -30, -40, -50, and C-9 (Military) Series Airplanes
Subject:
Inspect For Cracks
Status:
Current
Citation:
This information is not available.
Citation Publish Date:
Effective Date:
02/12/1990
Make:
The Boeing Company
Model:
DC-9-11 | DC-9-12 | DC-9-13 | DC-9-14 | DC-9-15 | DC-9-15F | DC-9-21 | DC-9-31 | DC-9-32 | DC-9-32 (...Show more
Product Type:
Aircraft
Product Subtype:
Large Airplane
Affected AD:
Superseded AD:
Affected By:
Superseded By:
Service/Office:
Office of Primary Responsibility:
CFR Part Reference:
Part 39
Comments:
AIRWORTHINESS DIRECTIVES FINAL RULES: 88-24-08 R2
CITATION:   This information is not available.

PAGE NUMBER:  

DOCKET NUMBER:   89-NM-41-AD

AMENDMENT:   39-6469

AD NUMBER:   88-24-08 R2

SUBJECT HEADING:   Airworthiness Directives; MCDONNELL DOUGLAS DC-9-10, -20, -30, -40, -50, and C-9 (Military) Series Airplanes

ACTION:  

SUMMARY:  

DATES:   Effective February 12, 1990.

ADDRESSES:  

FOR FURTHER INFORMATION CONTACT:  

SUPPLEMENTARY INFORMATION:  

REGULATORY TEXT:  
88-24-08 R2 MCDONNELL DOUGLAS: Amendment 39-6071, as revised by Amendment 39-6108, is further revised by Amendment 39-6469. Docket No. 89-NM-41-AD.

Applicability: Model DC-9-10, -20, -30, -40, -50, and C-9 (Military) series airplanes, certificated in any category.

Compliance: Required as indicated, unless previously accomplished.

To prevent fatigue cracking and subsequent failure of the fuselage skin or longerons, accomplish the following:

A. Prior to the accumulation of 45,000 landings, or within 30 days after January 28, 1989, (the effective date of Amendment 39-6108), whichever occurs later, unless accomplished within the last 2,500 landings, perform initial external low and high frequency eddy current inspections of the fuselage skin and longerons from longeron 7 left through 7 right, in accordance with the accomplishment instructions of McDonnell Douglas DC-9 Alert Service Bulletin A53-230, Revision 3, dated September 28, 1989, within the range of fuselage stations for the particular series airplanes as specified in Table 1 of that service bulletin.

NOTE: Inspections performed in accordance with McDonnell Douglas DC-9 Alert Service Bulletin A53-230, N/C, dated November 2, 1988, Revision 1, dated December 22, 1988, or Revision 2, dated April 21, 1989, meet the requirements of this paragraph.

B. Prior to the accumulation of 30,000 landings, or within 90 days after the effective date of this amendment, whichever occurs later, unless accomplished within the last 2,500 landings, perform initial external low and high frequency eddy current inspections of the fuselage skin and longerons from longeron 7 left through 7 right, in accordance with the accomplishment instructions of McDonnell Douglas DC-9 Alert Service Bulletin A53-230, Revision 3, dated September 28, 1989, within the range of fuselage stations for the particular series airplanes as specified in Table 1 of that Service Bulletin.

NOTE: Inspections performed in accordance with McDonnell Douglas DC-9 Alert Service Bulletin A53-230, N/C, dated November 2, 1988; Revision 1, dated December 22, 1988; or Revision 2, dated April 21, 1989; meet the requirements of this paragraph.

C. Prior to the accumulation of 2,500 landings after the accomplishment of the external inspections in accordance with paragraph A. or B., above, perform an aided visual inspection of the longerons from longeron 10 left through 10 right from inside the fuselage, in accordance with the accomplishment instructions of McDonnell Douglas DC-9 Alert Service Bulletin A53-230, Revision 3, dated September 28, 1989, within the range of fuselage stations for the particular series airplanes as specified in Table 2 of that Service Bulletin.

D. As an option to the initial visual inspection required by paragraph C., above, for airplanes that have previously accomplished an internal visual inspection of only longerons 7 left through 7 right prior to the effective date of this amendment: Prior to the accumulation of 2,500 landings after that internal visual inspection, perform an external high frequency eddy current inspection of longerons 8 left through 10 left, and 8 right through 10 right, within the range of fuselage stations for the particular series airplanes, as specified in Table 2 of McDonnell Douglas DC-9 Alert Service Bulletin A53-230, Revision 3, dated September 28, 1989. Repeat this external eddy current inspection at intervals not to exceed 2,500 landings until the internal visual inspection (of longerons 10 left through 10 right) required by paragraph C., above, is accomplished prior to the accumulation of 7,500 landings after the effective date of this amendment.

E. Except as provided by paragraph D., above, conduct repetitive inspections according to either paragraph E.1. or E.2., below:

1. Repeat the external eddy current and internal visual inspections as required by paragraphs A., or B., and C., above, at intervals not to exceed 5,800 landings: or

2. Repeat the external eddy current inspections as required by paragraph A. or B., above, from longerons 10 left through 10 right at intervals not to exceed 2,500 landings.

F. If cracks are detected prior to further flight, repair in accordance with McDonnell Douglas DC-9 Alert Service Bulletin A53-230, Revision 3, dated September 28, 1989. If Option II, Condition 2, of the Service Bulletin is selected, accomplish removal of interim repair doubler(s) and accomplish permanent longeron repair(s) within 2,500 landings after installation of the interim repair doublers.

G. Completion of the rework procedure defined in McDonnell Douglas Service Rework Drawing SR09530132, Revision B, dated July 28, 1989, constitutes terminating action for the repetitive inspection requirements of this AD.

H. An alternate means of compliance or adjustment of the compliance time, which provides an acceptable level of safety, may be used when approved by the Manager, Los Angeles Aircraft Certification Office, FAA, Northwest Mountain Region.

NOTE: The request should be forwarded through an FAA Principal Maintenance Inspector (PMI), who will either concur or comment and then send it to the Manager, Los Angeles Aircraft Certification Office, FAA, Northwest Mountain Region.

I. Special flight permits may be issued in accordance with FAR 21.197 and 21.199 to operate airplanes to a base in order to comply with the requirements of this AD.

All persons affected by this directive who have not already received the appropriate service documents from the manufacturer may obtain copies upon request to McDonnell Douglas Corporation, 3855 Lakewood Boulevard, Long Beach, California 90846, Attention: Business Unit Manager of Publications, CI-HCO (54-60). These documents may be examined at the FAA, Northwest Mountain Region, Transport Airplane Directorate, 17900 Pacific Highway South, Seattle, Washington, or the Los Angeles Aircraft Certification Office, 3229 East Spring Street, Long Beach, California.

This AD revises AD 88-24-08 R1 (Amendment 39-6108) which revised AD 88-24-08 (Amendment 39-6071).

This amendment (39-6469, AD 88-24-08 R2) becomes effective on February 12, 1990.


FOOTER:

Source: Official FAA Source ↗

Retrieved: Apr 8, 2026

Rights: U.S. Government Public Domain

This site is not affiliated with or endorsed by the FAA. Always verify with official sources.