AD 87-24-10

final rule

AVIONS MARCEL DASSAULT - BREGUET AVIATION (AMD-BA) Model Falcon 10 Airplanes

AD Number
87-24-10
Status
final_rule
Effective Date
Product Category
aircraft
Docket
Unknown
FR Citation
This information is not available.
Technical illustration of an aircraft turbine engine assembly
Problem area Engine

Applicability

TypeManufacturerModelDetails
aircraft Dassault Aviation Falcon 10 AVIONS MARCEL DASSAULT - BREGUET AVIATION (AMD-BA) Model Falcon 10 Airplanes

Unsafe Condition

Structural damage to aircraft frames and skin in the vicinity of the electrical grounding connection for the air conditioning freon compressor motor due to electrical arcing across a loose grounding connection.

AI-generated summary from the source AD text. Verify against the official source before acting.

Required Actions

Conduct a visual inspection and resistance test of the electrical grounding connection on frame 35 within 30 days after the effective date, and every 30 days thereafter. If resistance exceeds limits, repair the grounding connection before further flight. If resistance cannot be obtained, install a new grounding cable before further flight. Install a new electrical grounding cable within 4 months after the effective date. Repair any structural damage from electrical arcing prior to further flight as approved by the FAA.

AI-generated summary from the source AD text. Verify against the official source before acting.

Compliance Time

Within 30 days after the effective date of this AD, and thereafter at intervals not to exceed 30 days; within 4 months after the effective date of this AD.

AI-generated summary from the source AD text. Verify against the official source before acting.

Affected Aircraft

All Falcon 10 airplanes certificated in any category, unless AMD-BA modification M736 has been accomplished.

AI-generated summary from the source AD text. Verify against the official source before acting.

Federal Register Abstract

Air Conditioning Freon Compressor Motor

Applicability Source Text

Show captured applicability text from the source AD
AD Final Rules - DRS_87-24-10.html
Copy URL
Print/Save as PDF
Document Versions
 Feedback
Details
AD Number:
87-24-10
Document Type:
AD Final Rules
Docket Number:
Unknown
Subject Heading:
AVIONS MARCEL DASSAULT - BREGUET AVIATION (AMD-BA) Model Falcon 10 Airplanes
Subject:
Air Conditioning Freon Compressor Motor
Status:
Current
Citation:
This information is not available.
Citation Publish Date:
Effective Date:
12/29/1987
Make:
Dassault Aviation
Model:
Falcon 10
Product Type:
Aircraft
Product Subtype:
Large Airplane
Affected AD:
Superseded AD:
Affected By:
Superseded By:
Service/Office:
Office of Primary Responsibility:
CFR Part Reference:
Part 39
Comments:
AIRWORTHINESS DIRECTIVES FINAL RULES: 87-24-10
CITATION:   This information is not available.

PAGE NUMBER:  

DOCKET NUMBER:   Unknown

AMENDMENT:   39-5776

AD NUMBER:   87-24-10

SUBJECT HEADING:   AVIONS MARCEL DASSAULT - BREGUET AVIATION (AMD-BA) Model Falcon 10 Airplanes

ACTION:  

SUMMARY:  

DATES:   Effective December 29, 1987.

ADDRESSES:  

FOR FURTHER INFORMATION CONTACT:  

SUPPLEMENTARY INFORMATION:  

REGULATORY TEXT:  
87-24-10 AVIONS MARCEL DASSAULT - BREGUET AVIATION (AMD-BA): Amendment 39-5776. Applies to all Falcon 10 airplanes, certificated in any category, unless AMD-BA modification M736 has been accomplished. Compliance is required as specified, unless previously accomplished.

To prevent structural damage to aircraft frames and skin in the vicinity of the electrical grounding connection for the air conditioning freon compressor motor, accomplish the following:

A. Within 30 days after the effective date of this AD, and thereafter at intervals not to exceed 30 days, conduct a visual inspection and a resistance test of the electrical grounding connection, located on frame 35, for the air conditioning freon compressor motor. Perform the inspection and test in accordance with the AMD-BA Service Bulletin F10-262, dated December 22, 1986 (reference Maintenance Manual Chapter 20-40-40).

1. If the measured resistance value of the grounding connection bonding exceeds the limits referenced in paragraph B. of the Accomplishment Instructions of the service bulletin, then prior to further flight, repair the grounding connection in accordance with the service bulletin.

2. If the resistance value specified for the grounding connection bonding cannot be obtained, then prior to further flight, install a new grounding cable in accordance with paragraph C. of the Accomplishment Instructions of the service bulletin.

B. Within 4 months after the effective date of this AD, install a new electrical grounding cable for the air conditioning freon compressor motor, in accordance with the Accomplishment Instructions of AMD-BA Service Bulletin F10-262, dated December 22, 1986.

C. Installation of a new electrical grounding cable for the air conditioning freon compressor motor, in accordance with AMD-BA Service Bulletin F10-262, dated December 22, 1986, constitutes terminating action for the repetitive inspection and testing requirements of paragraph A. above.

D. Any structural damage due to the effects of existing electrical arcing across a loose grounding connection identified during the inspections required by paragraph A., above, must be repaired, prior to further flight, in a manner approved by the FAA.

E. An alternate means of compliance or adjustment of the compliance time, which provides an acceptable level of safety, may be used when approved by the Manager, Standardization Branch, ANM-113, FAA, Northwest Mountain Region.

F. Special flight permits may be issued in accordance with FAR 21.197 and 21.199 to operate airplanes to a base for the accomplishment of inspections and/or modifications required by this AD.

All persons affected by this directive who have not already received the appropriate service documents from the manufacturer may obtain copies upon request to the AMD-BA Representative, c/o Falcon Jet Corporation, Teterboro Airport, Teterboro, N.J. 07608. These documents may be examined at the FAA, Northwest Mountain Region, 17900 Pacific Highway South, Seattle, Washington, or at the Seattle Aircraft Certification Office, 9010 East Marginal Way South, Seattle, Washington.

This amendment becomes effective December 29, 1987.

FOOTER:

Document Text

Show stored source text (verify against official source)
AD Final Rules - DRS_87-24-10.html
Copy URL
Print/Save as PDF
Document Versions
 Feedback
Details
AD Number:
87-24-10
Document Type:
AD Final Rules
Docket Number:
Unknown
Subject Heading:
AVIONS MARCEL DASSAULT - BREGUET AVIATION (AMD-BA) Model Falcon 10 Airplanes
Subject:
Air Conditioning Freon Compressor Motor
Status:
Current
Citation:
This information is not available.
Citation Publish Date:
Effective Date:
12/29/1987
Make:
Dassault Aviation
Model:
Falcon 10
Product Type:
Aircraft
Product Subtype:
Large Airplane
Affected AD:
Superseded AD:
Affected By:
Superseded By:
Service/Office:
Office of Primary Responsibility:
CFR Part Reference:
Part 39
Comments:
AIRWORTHINESS DIRECTIVES FINAL RULES: 87-24-10
CITATION:   This information is not available.

PAGE NUMBER:  

DOCKET NUMBER:   Unknown

AMENDMENT:   39-5776

AD NUMBER:   87-24-10

SUBJECT HEADING:   AVIONS MARCEL DASSAULT - BREGUET AVIATION (AMD-BA) Model Falcon 10 Airplanes

ACTION:  

SUMMARY:  

DATES:   Effective December 29, 1987.

ADDRESSES:  

FOR FURTHER INFORMATION CONTACT:  

SUPPLEMENTARY INFORMATION:  

REGULATORY TEXT:  
87-24-10 AVIONS MARCEL DASSAULT - BREGUET AVIATION (AMD-BA): Amendment 39-5776. Applies to all Falcon 10 airplanes, certificated in any category, unless AMD-BA modification M736 has been accomplished. Compliance is required as specified, unless previously accomplished.

To prevent structural damage to aircraft frames and skin in the vicinity of the electrical grounding connection for the air conditioning freon compressor motor, accomplish the following:

A. Within 30 days after the effective date of this AD, and thereafter at intervals not to exceed 30 days, conduct a visual inspection and a resistance test of the electrical grounding connection, located on frame 35, for the air conditioning freon compressor motor. Perform the inspection and test in accordance with the AMD-BA Service Bulletin F10-262, dated December 22, 1986 (reference Maintenance Manual Chapter 20-40-40).

1. If the measured resistance value of the grounding connection bonding exceeds the limits referenced in paragraph B. of the Accomplishment Instructions of the service bulletin, then prior to further flight, repair the grounding connection in accordance with the service bulletin.

2. If the resistance value specified for the grounding connection bonding cannot be obtained, then prior to further flight, install a new grounding cable in accordance with paragraph C. of the Accomplishment Instructions of the service bulletin.

B. Within 4 months after the effective date of this AD, install a new electrical grounding cable for the air conditioning freon compressor motor, in accordance with the Accomplishment Instructions of AMD-BA Service Bulletin F10-262, dated December 22, 1986.

C. Installation of a new electrical grounding cable for the air conditioning freon compressor motor, in accordance with AMD-BA Service Bulletin F10-262, dated December 22, 1986, constitutes terminating action for the repetitive inspection and testing requirements of paragraph A. above.

D. Any structural damage due to the effects of existing electrical arcing across a loose grounding connection identified during the inspections required by paragraph A., above, must be repaired, prior to further flight, in a manner approved by the FAA.

E. An alternate means of compliance or adjustment of the compliance time, which provides an acceptable level of safety, may be used when approved by the Manager, Standardization Branch, ANM-113, FAA, Northwest Mountain Region.

F. Special flight permits may be issued in accordance with FAR 21.197 and 21.199 to operate airplanes to a base for the accomplishment of inspections and/or modifications required by this AD.

All persons affected by this directive who have not already received the appropriate service documents from the manufacturer may obtain copies upon request to the AMD-BA Representative, c/o Falcon Jet Corporation, Teterboro Airport, Teterboro, N.J. 07608. These documents may be examined at the FAA, Northwest Mountain Region, 17900 Pacific Highway South, Seattle, Washington, or at the Seattle Aircraft Certification Office, 9010 East Marginal Way South, Seattle, Washington.

This amendment becomes effective December 29, 1987.

FOOTER:

Source: Official FAA Source ↗

Retrieved: Apr 8, 2026

Rights: U.S. Government Public Domain

This site is not affiliated with or endorsed by the FAA. Always verify with official sources.