AD 84-24-54 R2

final rule

ALLISON GAS TURBINE DIVISION, GENERAL MOTORS CORP. Model 250-C30 Series Engines

AD Number
84-24-54 R2
Status
final_rule
Effective Date
Product Category
engine
Docket
Unknown
FR Citation
This information is not available.
Technical illustration of an aircraft turbine engine assembly
Problem area Engine

Applicability

TypeManufacturerModelDetails
engine Rolls-Royce Corporation 250-C30 ALLISON GAS TURBINE DIVISION, GENERAL MOTORS CORP. Model 250-C30 Series Engines
engine Rolls-Royce Corporation 250-C30P ALLISON GAS TURBINE DIVISION, GENERAL MOTORS CORP. Model 250-C30 Series Engines
engine Rolls-Royce Corporation 250-C30R (T703-AD-700) ALLISON GAS TURBINE DIVISION, GENERAL MOTORS CORP. Model 250-C30 Series Engines
engine Rolls-Royce Corporation 250-C30S ALLISON GAS TURBINE DIVISION, GENERAL MOTORS CORP. Model 250-C30 Series Engines

Unsafe Condition

Cracks in turbine-to-compressor coupling P/N 23008080, carbon buildup on turbine shafts and couplings causing shaft rub, or shafting misalignment leading to disconnect failure and subsequent overspeed uncontained failure of the gas producer turbine rotor.

AI-generated summary from the source AD text. Verify against the official source before acting.

Required Actions

Replace coupling P/N 23008080 with P/N 23032345 or temporary serviceable parts; inspect and clean turbine shafting/couplings, replace O-rings; modify spur adapter gearshaft and roller bearing configuration; and modify turbine-exhaust-collector as per specified CEBs. Compliance includes inspections at intervals not exceeding 300 hours time-in-service and modifications during repair/overhaul within specified deadlines.

AI-generated summary from the source AD text. Verify against the official source before acting.

Compliance Time

Before further flight, within 50 hours time-in-service after effective date (January 6, 1986), or at next turbine repair/overhaul shop visit, but not later than November 30, 1986/1987 depending on engine model and installation.

AI-generated summary from the source AD text. Verify against the official source before acting.

Affected Aircraft

Allison Model 250-C30, -C30P, -C30R (T703-AD-700), and -C30S engines with specified engine and turbine serial numbers installed in rotorcraft, except those incorporating listed Commercial Engine Bulletins.

AI-generated summary from the source AD text. Verify against the official source before acting.

Federal Register Abstract

Gas Producer Turbine Rotor

Applicability Source Text

Show captured applicability text from the source AD
AD Final Rules - DRS_84-24-54_R.html
Copy URL
Print/Save as PDF
Document Versions
 Feedback
Details
AD Number:
84-24-54 R2
Document Type:
AD Final Rules
Docket Number:
Unknown
Subject Heading:
ALLISON GAS TURBINE DIVISION, GENERAL MOTORS CORP. Model 250-C30 Series Engines
Subject:
Gas Producer Turbine Rotor
Status:
Current
Citation:
This information is not available.
Citation Publish Date:
Effective Date:
01/06/1986
Make:
Rolls-Royce Corporation
Model:
250-C30 | 250-C30P | 250-C30R (T703-AD-700) | 250-C30S
Product Type:
Engine
Product Subtype:
Affected AD:
Superseded AD:
Affected By:
Superseded By:
Service/Office:
Office of Primary Responsibility:
CFR Part Reference:
Part 39
Comments:
Updated RGL applicability to match AD applicability; CAR C-11-185
AIRWORTHINESS DIRECTIVES FINAL RULES: 84-24-54 R2
CITATION:   This information is not available.

PAGE NUMBER:  

DOCKET NUMBER:   Unknown

AMENDMENT:   39-5192

AD NUMBER:   84-24-54 R2

SUBJECT HEADING:   ALLISON GAS TURBINE DIVISION, GENERAL MOTORS CORP. Model 250-C30 Series Engines

ACTION:  

SUMMARY:  

DATES:   Effective January 6, 1986.

ADDRESSES:  

FOR FURTHER INFORMATION CONTACT:  

SUPPLEMENTARY INFORMATION:  

REGULATORY TEXT:   84-24-54 R2 ALLISON GAS TURBINE DIVISION, GENERAL MOTORS CORP. (ALLISON, formerly DETROIT DIESEL ALLISON): Amendment 39-5163 as amended by Amendment 39-5192. Applies to Allison Model 250-C30 Series engines installed in rotorcraft certificated in any category with the following engine and turbine serial numbers:


MODEL	ENGINE SERIAL NUMBER	TURBINE SERIAL NUMBER
250-C30	CAE 900001 thru 9000026	CAT 900001 thru 90683, 95001 thru 95336, 95338 thru 95347, 95349, 95350, 95352 thru 95365, 95368, 95370, 95372 thru 95374, 95376 thru 95394, 95396, 95398 thru 95407
250-C30, -C30S	CAE 890001 thru 890840,
890843 thru 890847,
890849 thru 890858,
890860, 890861, 890863	Same as above.
250-C30R	CAE 895068, 895077,
895078, 895082, 895084,
895085, 895096	Same as above.
250-C30P	CAE 895001 thru 895177	Same as above.

EXCEPT: Existing Model 250-C30 Series engines which have incorporated all of the following Allison Commercial Engine Bulletins (CEB's):


	SUBJECT
CEB-A-72-3134, Rev. 2 dated Sept. 15, 1985, or CEB-A-72-3135, Rev. 1 dated Sept. 15, 1985, or FAA approved equivalents; and	Engine, Turbine Assembly, Turbine-to-Compressor Coupling Shaft-Replace
CEB-72-3100, Rev. 1 dated Sept. 15, 1985, or FAA approved equivalent; and	Engine, Compressor Assembly, Spur Adapter Gearshaft - modified by adding Three Slots in Bore & Plugging Oil Feed Hole
CEB-72-3059, Rev. 4 dated
Sept. 15, 1985, or FAA approved
equivalent; and	Engine, Compressor and Gearbox Assemblies - modify to Roller Number 2 1/2 Bearing Configuration
CEB-72-3096, Rev. 1 dated Sept. 15, 1985, or FAA approved equivalent.	Engine, Turbine-Exhaust Collector Modifications

Compliance is required as indicated unless already accomplished.
To prevent possible cracks in turbine-to-compressor coupling P/N 23008080, or carbon buildup on turbine shafts and couplings that can cause shaft rub, or shafting misalignment from progressing to where a disconnect failure could occur and subsequently could result in an overspeed uncontained failure of the gas producer turbine rotor, accomplish the following:
(a) Model 250-C30 and -C30S engines installed in Sikorsky S-76A rotorcraft
(1) Before further flight, remove P/N 23008080 coupling and replace with P/N 23032345 in accordance with Allison CEB-A-72-3134, Revision 2 dated September 15, 1985, or FAA approved equivalent; or, as alternative temporary compliance, until next turbine repair/overhaul shop visit, but not later than November 30, 1986, replace P/N 23008080 coupling with serviceable P/N 6896895, or P/N 6889071, in accordance with Allison CEB-A-72-3134, Revision 2 dated September 15, 1985, or FAA approved equivalent.
(2) Within the next 50 hours time-in-service after the effective date of this AD, unless already accomplished within the last 250 hours time-in-service, and thereafter at intervals not to exceed 300 hours time- in-service from the last inspection, perform the following:
Inspect, clean turbine shafting/couplings, and replace the P/N AS 3085-018 O-ring (two for P/N 23032345 and one for P/N 6896895 or P/N 6889071) on the aft end of the spur adapter gearshaft in accordance with CEB-A-72-3108, Revision 3 dated September 15, 1985, or FAA approved equivalent.
(3) At the next engine repair/overhaul shop visit, when both the compressor and gearbox are disassembled to permit access, but not later than November 30, 1986, perform the following:
(i) Modify spur adapter gearshaft assembly P/N 23005276 in accordance with Allison CEB 72-3100, Revision 1 dated September 15, 1985, or FAA approved equivalent.
(ii) Modify engine compressor and gearbox assemblies to include the roller bearing configuration at the 2 1/2 bearing location in accordance with Allison CEB 72-3059, Revision 4 dated September 15, 1985, or FAA approved equivalent.
(iii) Replace turbine-to-compressor-coupling, P/N 6896895, or P/N 6889071, with P/N 23032345 and install two P/N AS 3085-018 O-rings on the aft end of the spur adapter gearshaft in accordance with Allison CEB-A-72-3134, Revision 2 dated September 15, 1985, or FAA approved equivalent.
(4) At the next turbine repair/overhaul shop visit, but not later than November 30, 1986, modify the turbine-exhaust-collector in accordance with Allison CEB 72-3096, Revision 1 dated September 15, 1985, or FAA approved equivalent.
(b) Model 250-C30, -C30P, -C30R and -C30S engines installed in other than Sikorsky S-76A rotorcraft
(1) Within the next 50 hours time-in-service after the effective date of this AD, unless already accomplished within the last 250 hours time-in-service, and thereafter at intervals not to exceed 300 hours time- in-service from the last inspection, perform the following:
Inspect, clean turbine shafting/couplings, and replace the P/N AS 3085-018 O-ring (two for P/N 23032345 and one for P/N 6896895 or P/N 6889071) on the aft end of the spur adapter gearshaft in accordance with CEB-A-72-3143 dated September 15, 1985, or FAA approved equivalent.
(2) Within the next 300 hours time in service after November 18, 1985, or within 100 hours time in service after the effective date of this amendment, or at next turbine repair/overhaul shop visit, whichever occurs first, but not later than March 6, 1986, perform the following:
Replace turbine-to-compressor coupling P/N 23008080 with P/N 23032345 and install two P/N AS 3085-018 O-rings on the aft end of the spur adapter gearshaft in accordance with Allison CEB-A-72- 3135, Revision 1 dated September 15, 1985, or FAA approved equivalent.
(3) At the next engine repair/overhaul shop visit when both the compressor and gearbox are disassembled to permit access, but not later than November 30, 1987, perform the following:
(i) Modify spur adapter gearshaft assembly P/N 23005276 in accordance with Allison CEB 72-3100, Revision 1 dated September 15, 1985, or FAA approved equivalent.
(ii) Modify engine compressor and gearbox assemblies to include the roller bearing configuration at the 2 1/2 bearing location in accordance with Allison CEB 72-3059, Revision 4 dated September 15, 1985, or FAA approved equivalent.
(iii) Replace turbine-to-compressor-coupling P/N 6896895, or P/N 6889071, with P/N 23032345 and install two P/N AS 3085-018 O-rings on the aft end of the spur adapter gearshaft in accordance with Allison CEB-A-72-3135, Revision 1 dated September 15, 1985, or FAA approved equivalent.
(4) At the next turbine repair/overhaul shop visit, but not later than November 30, 1987, modify the turbine-exhaust-collector in accordance with Allison CEB 72-3096, Revision 1 dated September 15, 1985, or FAA approved equivalent.
Aircraft may be ferried in accordance with the provisions of FAR 21.197 and 21.199 to a base where the AD can be accomplished.
Upon request, an equivalent means of compliance with the requirements of this AD may be approved by the Manager, Chicago Aircraft Certification Office, FAA, 2300 East Devon Avenue, Des Plaines, Illinois 60018.
Upon submission of substantiating data by an owner or operator through an FAA maintenance inspector, the Manager, Chicago Aircraft Certification Office may adjust the compliance time specified in this AD.
The following Allison Commercial Engine Bulletins are incorporated herein and made a part hereof pursuant to 5 U.S.C. 552(a)(1):
CEB-A-72-3134, Revision 2 dated September 15, 1985
CEB-A-72-3135, Revision 1 dated September 15, 1985
CEB-72-3100, Revision 1 dated September 15, 1985
CEB-72-3059, Revision 4 dated September 15, 1985
CEB-A-72-3108, Revision 3 dated September 15, 1985
CEB-72-3096, Revision 1 dated September 15, 1985
CEB-A-72-3143 dated September 15, 1985
All persons affected by this directive who have not already received these documents from the manufacturer may obtain copies upon request to Allison Gas Turbine Division, General Motors Corp., P.O. Box 420, Indianapolis, IN 46206-0420. These documents also may be examined at the Office of Regional Counsel, FAA, ATTN: Rules Docket No. 84-ANE-29, 12 New England Executive Park, Burlington, Massachusetts 01803, weekdays, except Federal holidays, between 8:00 a.m. and 4:30 p.m.
This amendment supersedes Amendment 39-4755, 48 FR 51287, AD 83-22-05.
Amendment 39-5163 became effective November 18, 1985, to all persons except those persons to whom it was made immediately effective by telegraphic AD T84-24-54, issued December 10, 1984, which contained this amendment.
This Amendment 39-5192 becomes effective January 6, 1986

FOOTER:

Document Text

Show stored source text (verify against official source)
AD Final Rules - DRS_84-24-54_R.html
Copy URL
Print/Save as PDF
Document Versions
 Feedback
Details
AD Number:
84-24-54 R2
Document Type:
AD Final Rules
Docket Number:
Unknown
Subject Heading:
ALLISON GAS TURBINE DIVISION, GENERAL MOTORS CORP. Model 250-C30 Series Engines
Subject:
Gas Producer Turbine Rotor
Status:
Current
Citation:
This information is not available.
Citation Publish Date:
Effective Date:
01/06/1986
Make:
Rolls-Royce Corporation
Model:
250-C30 | 250-C30P | 250-C30R (T703-AD-700) | 250-C30S
Product Type:
Engine
Product Subtype:
Affected AD:
Superseded AD:
Affected By:
Superseded By:
Service/Office:
Office of Primary Responsibility:
CFR Part Reference:
Part 39
Comments:
Updated RGL applicability to match AD applicability; CAR C-11-185
AIRWORTHINESS DIRECTIVES FINAL RULES: 84-24-54 R2
CITATION:   This information is not available.

PAGE NUMBER:  

DOCKET NUMBER:   Unknown

AMENDMENT:   39-5192

AD NUMBER:   84-24-54 R2

SUBJECT HEADING:   ALLISON GAS TURBINE DIVISION, GENERAL MOTORS CORP. Model 250-C30 Series Engines

ACTION:  

SUMMARY:  

DATES:   Effective January 6, 1986.

ADDRESSES:  

FOR FURTHER INFORMATION CONTACT:  

SUPPLEMENTARY INFORMATION:  

REGULATORY TEXT:   84-24-54 R2 ALLISON GAS TURBINE DIVISION, GENERAL MOTORS CORP. (ALLISON, formerly DETROIT DIESEL ALLISON): Amendment 39-5163 as amended by Amendment 39-5192. Applies to Allison Model 250-C30 Series engines installed in rotorcraft certificated in any category with the following engine and turbine serial numbers:


MODEL	ENGINE SERIAL NUMBER	TURBINE SERIAL NUMBER
250-C30	CAE 900001 thru 9000026	CAT 900001 thru 90683, 95001 thru 95336, 95338 thru 95347, 95349, 95350, 95352 thru 95365, 95368, 95370, 95372 thru 95374, 95376 thru 95394, 95396, 95398 thru 95407
250-C30, -C30S	CAE 890001 thru 890840,
890843 thru 890847,
890849 thru 890858,
890860, 890861, 890863	Same as above.
250-C30R	CAE 895068, 895077,
895078, 895082, 895084,
895085, 895096	Same as above.
250-C30P	CAE 895001 thru 895177	Same as above.

EXCEPT: Existing Model 250-C30 Series engines which have incorporated all of the following Allison Commercial Engine Bulletins (CEB's):


	SUBJECT
CEB-A-72-3134, Rev. 2 dated Sept. 15, 1985, or CEB-A-72-3135, Rev. 1 dated Sept. 15, 1985, or FAA approved equivalents; and	Engine, Turbine Assembly, Turbine-to-Compressor Coupling Shaft-Replace
CEB-72-3100, Rev. 1 dated Sept. 15, 1985, or FAA approved equivalent; and	Engine, Compressor Assembly, Spur Adapter Gearshaft - modified by adding Three Slots in Bore & Plugging Oil Feed Hole
CEB-72-3059, Rev. 4 dated
Sept. 15, 1985, or FAA approved
equivalent; and	Engine, Compressor and Gearbox Assemblies - modify to Roller Number 2 1/2 Bearing Configuration
CEB-72-3096, Rev. 1 dated Sept. 15, 1985, or FAA approved equivalent.	Engine, Turbine-Exhaust Collector Modifications

Compliance is required as indicated unless already accomplished.
To prevent possible cracks in turbine-to-compressor coupling P/N 23008080, or carbon buildup on turbine shafts and couplings that can cause shaft rub, or shafting misalignment from progressing to where a disconnect failure could occur and subsequently could result in an overspeed uncontained failure of the gas producer turbine rotor, accomplish the following:
(a) Model 250-C30 and -C30S engines installed in Sikorsky S-76A rotorcraft
(1) Before further flight, remove P/N 23008080 coupling and replace with P/N 23032345 in accordance with Allison CEB-A-72-3134, Revision 2 dated September 15, 1985, or FAA approved equivalent; or, as alternative temporary compliance, until next turbine repair/overhaul shop visit, but not later than November 30, 1986, replace P/N 23008080 coupling with serviceable P/N 6896895, or P/N 6889071, in accordance with Allison CEB-A-72-3134, Revision 2 dated September 15, 1985, or FAA approved equivalent.
(2) Within the next 50 hours time-in-service after the effective date of this AD, unless already accomplished within the last 250 hours time-in-service, and thereafter at intervals not to exceed 300 hours time- in-service from the last inspection, perform the following:
Inspect, clean turbine shafting/couplings, and replace the P/N AS 3085-018 O-ring (two for P/N 23032345 and one for P/N 6896895 or P/N 6889071) on the aft end of the spur adapter gearshaft in accordance with CEB-A-72-3108, Revision 3 dated September 15, 1985, or FAA approved equivalent.
(3) At the next engine repair/overhaul shop visit, when both the compressor and gearbox are disassembled to permit access, but not later than November 30, 1986, perform the following:
(i) Modify spur adapter gearshaft assembly P/N 23005276 in accordance with Allison CEB 72-3100, Revision 1 dated September 15, 1985, or FAA approved equivalent.
(ii) Modify engine compressor and gearbox assemblies to include the roller bearing configuration at the 2 1/2 bearing location in accordance with Allison CEB 72-3059, Revision 4 dated September 15, 1985, or FAA approved equivalent.
(iii) Replace turbine-to-compressor-coupling, P/N 6896895, or P/N 6889071, with P/N 23032345 and install two P/N AS 3085-018 O-rings on the aft end of the spur adapter gearshaft in accordance with Allison CEB-A-72-3134, Revision 2 dated September 15, 1985, or FAA approved equivalent.
(4) At the next turbine repair/overhaul shop visit, but not later than November 30, 1986, modify the turbine-exhaust-collector in accordance with Allison CEB 72-3096, Revision 1 dated September 15, 1985, or FAA approved equivalent.
(b) Model 250-C30, -C30P, -C30R and -C30S engines installed in other than Sikorsky S-76A rotorcraft
(1) Within the next 50 hours time-in-service after the effective date of this AD, unless already accomplished within the last 250 hours time-in-service, and thereafter at intervals not to exceed 300 hours time- in-service from the last inspection, perform the following:
Inspect, clean turbine shafting/couplings, and replace the P/N AS 3085-018 O-ring (two for P/N 23032345 and one for P/N 6896895 or P/N 6889071) on the aft end of the spur adapter gearshaft in accordance with CEB-A-72-3143 dated September 15, 1985, or FAA approved equivalent.
(2) Within the next 300 hours time in service after November 18, 1985, or within 100 hours time in service after the effective date of this amendment, or at next turbine repair/overhaul shop visit, whichever occurs first, but not later than March 6, 1986, perform the following:
Replace turbine-to-compressor coupling P/N 23008080 with P/N 23032345 and install two P/N AS 3085-018 O-rings on the aft end of the spur adapter gearshaft in accordance with Allison CEB-A-72- 3135, Revision 1 dated September 15, 1985, or FAA approved equivalent.
(3) At the next engine repair/overhaul shop visit when both the compressor and gearbox are disassembled to permit access, but not later than November 30, 1987, perform the following:
(i) Modify spur adapter gearshaft assembly P/N 23005276 in accordance with Allison CEB 72-3100, Revision 1 dated September 15, 1985, or FAA approved equivalent.
(ii) Modify engine compressor and gearbox assemblies to include the roller bearing configuration at the 2 1/2 bearing location in accordance with Allison CEB 72-3059, Revision 4 dated September 15, 1985, or FAA approved equivalent.
(iii) Replace turbine-to-compressor-coupling P/N 6896895, or P/N 6889071, with P/N 23032345 and install two P/N AS 3085-018 O-rings on the aft end of the spur adapter gearshaft in accordance with Allison CEB-A-72-3135, Revision 1 dated September 15, 1985, or FAA approved equivalent.
(4) At the next turbine repair/overhaul shop visit, but not later than November 30, 1987, modify the turbine-exhaust-collector in accordance with Allison CEB 72-3096, Revision 1 dated September 15, 1985, or FAA approved equivalent.
Aircraft may be ferried in accordance with the provisions of FAR 21.197 and 21.199 to a base where the AD can be accomplished.
Upon request, an equivalent means of compliance with the requirements of this AD may be approved by the Manager, Chicago Aircraft Certification Office, FAA, 2300 East Devon Avenue, Des Plaines, Illinois 60018.
Upon submission of substantiating data by an owner or operator through an FAA maintenance inspector, the Manager, Chicago Aircraft Certification Office may adjust the compliance time specified in this AD.
The following Allison Commercial Engine Bulletins are incorporated herein and made a part hereof pursuant to 5 U.S.C. 552(a)(1):
CEB-A-72-3134, Revision 2 dated September 15, 1985
CEB-A-72-3135, Revision 1 dated September 15, 1985
CEB-72-3100, Revision 1 dated September 15, 1985
CEB-72-3059, Revision 4 dated September 15, 1985
CEB-A-72-3108, Revision 3 dated September 15, 1985
CEB-72-3096, Revision 1 dated September 15, 1985
CEB-A-72-3143 dated September 15, 1985
All persons affected by this directive who have not already received these documents from the manufacturer may obtain copies upon request to Allison Gas Turbine Division, General Motors Corp., P.O. Box 420, Indianapolis, IN 46206-0420. These documents also may be examined at the Office of Regional Counsel, FAA, ATTN: Rules Docket No. 84-ANE-29, 12 New England Executive Park, Burlington, Massachusetts 01803, weekdays, except Federal holidays, between 8:00 a.m. and 4:30 p.m.
This amendment supersedes Amendment 39-4755, 48 FR 51287, AD 83-22-05.
Amendment 39-5163 became effective November 18, 1985, to all persons except those persons to whom it was made immediately effective by telegraphic AD T84-24-54, issued December 10, 1984, which contained this amendment.
This Amendment 39-5192 becomes effective January 6, 1986

FOOTER:

Source: Official FAA Source ↗

Retrieved: Apr 8, 2026

Rights: U.S. Government Public Domain

This site is not affiliated with or endorsed by the FAA. Always verify with official sources.