AD 79-24-01 R3

final rule

Airworthiness Directives; MCDONNELL DOUGLAS DC-9 Series Airplanes

AD Number
79-24-01 R3
Status
final_rule
Effective Date
Product Category
aircraft
Docket
Unknown
FR Citation
This information is not available.
Technical illustration of a riveted aircraft structural panel and frame
Problem area Airframe structure

Applicability

TypeManufacturerModelDetails
aircraft The Boeing Company DC-9-11 Airworthiness Directives; MCDONNELL DOUGLAS DC-9 Series Airplanes
aircraft The Boeing Company DC-9-12 Airworthiness Directives; MCDONNELL DOUGLAS DC-9 Series Airplanes
aircraft The Boeing Company DC-9-13 Airworthiness Directives; MCDONNELL DOUGLAS DC-9 Series Airplanes
aircraft The Boeing Company DC-9-14 Airworthiness Directives; MCDONNELL DOUGLAS DC-9 Series Airplanes
aircraft The Boeing Company DC-9-15 Airworthiness Directives; MCDONNELL DOUGLAS DC-9 Series Airplanes
aircraft The Boeing Company DC-9-15F Airworthiness Directives; MCDONNELL DOUGLAS DC-9 Series Airplanes
aircraft The Boeing Company DC-9-21 Airworthiness Directives; MCDONNELL DOUGLAS DC-9 Series Airplanes
aircraft The Boeing Company DC-9-31 Airworthiness Directives; MCDONNELL DOUGLAS DC-9 Series Airplanes
aircraft The Boeing Company DC-9-32 Airworthiness Directives; MCDONNELL DOUGLAS DC-9 Series Airplanes
aircraft The Boeing Company DC-9-32 (VC-9C) Airworthiness Directives; MCDONNELL DOUGLAS DC-9 Series Airplanes
aircraft The Boeing Company DC-9-32F Airworthiness Directives; MCDONNELL DOUGLAS DC-9 Series Airplanes
aircraft The Boeing Company DC-9-32F (C-9A) Airworthiness Directives; MCDONNELL DOUGLAS DC-9 Series Airplanes
aircraft The Boeing Company DC-9-32F (C-9B) Airworthiness Directives; MCDONNELL DOUGLAS DC-9 Series Airplanes
aircraft The Boeing Company DC-9-33F Airworthiness Directives; MCDONNELL DOUGLAS DC-9 Series Airplanes
aircraft The Boeing Company DC-9-34 Airworthiness Directives; MCDONNELL DOUGLAS DC-9 Series Airplanes
aircraft The Boeing Company DC-9-34F Airworthiness Directives; MCDONNELL DOUGLAS DC-9 Series Airplanes
aircraft The Boeing Company DC-9-41 Airworthiness Directives; MCDONNELL DOUGLAS DC-9 Series Airplanes
aircraft The Boeing Company DC-9-51 Airworthiness Directives; MCDONNELL DOUGLAS DC-9 Series Airplanes
aircraft The Boeing Company DC-9-81 (MD-81) Airworthiness Directives; MCDONNELL DOUGLAS DC-9 Series Airplanes
aircraft The Boeing Company DC-9-82 (MD-82) Airworthiness Directives; MCDONNELL DOUGLAS DC-9 Series Airplanes
aircraft The Boeing Company DC-9-83 (MD-83) Airworthiness Directives; MCDONNELL DOUGLAS DC-9 Series Airplanes
aircraft The Boeing Company DC-9-87 (MD-87) Airworthiness Directives; MCDONNELL DOUGLAS DC-9 Series Airplanes

Unsafe Condition

Fatigue cracks in the aft pressure bulkhead emergency exit doorjamb structure could lead to failure of the aft pressure bulkhead.

AI-generated summary from the source AD text. Verify against the official source before acting.

Required Actions

Conduct initial visual and X-ray inspections of the emergency exit doorjamb structure within specified landing intervals, repair cracks before further flight as per service bulletins, and report inspection results. Alternative actions approved by FAA may be used.

AI-generated summary from the source AD text. Verify against the official source before acting.

Compliance Time

Within specified landing intervals (e.g., 10, 100, 250, 1,000, 2,000 landings) after the effective date or prior inspections, depending on aircraft modification status.

AI-generated summary from the source AD text. Verify against the official source before acting.

Affected Aircraft

McDonnell Douglas DC-9 series airplanes with non-ventral door aft pressure bulkhead P/N 5910163 and more than 10,000 landings, including models DC-9-11, DC-9-12, DC-9-13, DC-9-14, DC-9-15, DC-9-15F, DC-9-21, DC-9-31, DC-9-32, and others as listed.

AI-generated summary from the source AD text. Verify against the official source before acting.

Federal Register Abstract

Aft Pressure Bulkhead

Applicability Source Text

Show captured applicability text from the source AD
AD Final Rules - DRS_79-24-01_R.html
Copy URL
Print/Save as PDF
Document Versions
 Feedback
Details
AD Number:
79-24-01 R3
Document Type:
AD Final Rules
Docket Number:
Unknown
Subject Heading:
Airworthiness Directives; MCDONNELL DOUGLAS DC-9 Series Airplanes
Subject:
Aft Pressure Bulkhead
Status:
Current
Citation:
This information is not available.
Citation Publish Date:
Effective Date:
08/27/1981
Make:
The Boeing Company
Model:
DC-9-11 | DC-9-12 | DC-9-13 | DC-9-14 | DC-9-15 | DC-9-15F | DC-9-21 | DC-9-31 | DC-9-32 | DC-9-32 (...Show more
Product Type:
Aircraft
Product Subtype:
Large Airplane
Affected AD:
Superseded AD:
Affected By:
Superseded By:
Service/Office:
Office of Primary Responsibility:
CFR Part Reference:
Part 39
Comments:
AIRWORTHINESS DIRECTIVES FINAL RULES: 79-24-01 R3
CITATION:   This information is not available.

PAGE NUMBER:  

DOCKET NUMBER:   Unknown

AMENDMENT:   39-4191

AD NUMBER:   79-24-01 R3

SUBJECT HEADING:   Airworthiness Directives; MCDONNELL DOUGLAS DC-9 Series Airplanes

ACTION:  

SUMMARY:  

DATES:   Effective August 27, 1981.

ADDRESSES:  

FOR FURTHER INFORMATION CONTACT:  

SUPPLEMENTARY INFORMATION:  

REGULATORY TEXT:  
79-24-01 R3 MCDONNELL DOUGLAS: Amendment 39-3618 as amended by Amendment 39-3741 and 39-3841 is further amended by Amendment 39-4191. Applies to McDonnell Douglas Model DC-9 series airplanes, certificated in all categories, equipped with the non-ventral door aft pressure bulkhead P/N 5910163, and with more than 10,000 landings.

Compliance required as indicated.

To detect fatigue cracks and prevent failure of the aft pressure bulkhead, accomplish the following:

(a) For aircraft not previously modified or repaired in accordance with McDonnell Douglas DC-9 Service Bulletin 53-127 dated May 25, 1976, accomplish the following:

(1) Within 10 landings after the effective date of this AD, unless already accomplished in accordance with telegraphic AD T79WE13 dated September 18, 1979 or telegraphic AD T79WE15 dated September 28, 1979, conduct an initial visual inspection per Step 1, Figure 1, of McDonnell Douglas DC-9 Alert Service Bulletin A53-127, Revision 1, dated September 26, 1979. The visual inspection shall encompass the entire periphery of the emergency exit doorjamb structure.

(2) Within 100 landings after the effective date of this AD, unless already accomplished in accordance with telegraphic AD T79WE15 dated September 28, 1979, conduct both visual and X-ray inspections per Steps 3 through 10, Figure 1, of McDonnell Douglas DC-9 Alert Service Bulletin A53-127, Revision 1, dated September 26, 1979. The visual portion of the inspection shall encompass the entire periphery of the doorjamb structure.

(3) Within 250 landings of the inspection required by paragraph (a)(2) of this AD and thereafter at intervals not to exceed 250 landings, conduct a visual inspection per Step 1, Figure 1, of McDonnell Douglas DC-9 Alert Service Bulletin A53-127, Revision 1, dated September 26, 1979. The visual inspection shall encompass the entire periphery of the emergency exit doorjamb structure.

(4) Within 1,000 landings from the inspection required by paragraph (a)(2) and thereafter at intervals not to exceed 1,000 landings, conduct X-ray inspections per Steps 8 through 10 and a visual inspection per Step 1, Figure 1, of McDonnell Douglas DC-9 Alert Service Bulletin A53-127, Revision 1, dated September 26, 1979. The visual inspection shall encompass the entire periphery of the emergency exit doorjamb structure.

(b) For aircraft previously modified or repaired per McDonnell Douglas DC-9 Service Bulletin 53-127 dated May 25, 1976, accomplish the following:

(1) Within 100 landings after the effective date of this AD, unless already accomplished subsequent to September 25, 1979, conduct X-ray inspections per Steps 8 through 10, Figure 1, of McDonnell Douglas DC-9 Alert Service Bulletin A53-127, Revision 1, dated September 26, 1979, and a visual inspection of the entire periphery of the emergency exit doorjamb structure.

(2) Within 2,000 landings after inspection per paragraph (b)(1) of this AD and thereafter at intervals not to exceed 2,000 landings, conduct X-ray inspections of the jamb structure per Steps 8 through 10, Figure 1, of McDonnell Douglas DC-9 Alert Service Bulletin A53-127, Revision 1, dated September 26, 1979, and a visual inspection of the entire periphery of the emergency exit doorjamb structure.

(c) If cracks are found during any of the inspections required by this AD, repair before further flight in accordance with the following:

(1) For cracks which are limited to the emergency exit doorjamb, repair as shown for Condition 2, Figure 2, of McDonnell Douglas DC-9 Alert Service Bulletin A53-127, Revision 1, dated September 26, 1979.

(2) For cracks which extend through the emergency exit doorjamb and into the pressure bulkhead web, repair as shown for Condition 3, Figure 3, of McDonnell Douglas DC-9 Alert Service Bulletin A53-127, Revision 1, dated September 26, 1979.

(3) For cracks for which no repair is prescribed in McDonnell Douglas DC-9 Alert Service Bulletin A53-127, Revision 1, dated September 26, 1979, repair in accordance with data approved by the Chief, Aircraft Engineering Division, FAA Western Region.

(d) Within 24 hours after the initial inspections per paragraph (a)(2) and paragraph (b)(1), report the results of the initial inspections by Telex to the Chief, Aircraft Engineering Division, FAA Western Region. Include in the reporting information the date and condition of modification or repair per DC-9 Service Bulletin 53-127 or A53-127, McDonnell Douglas fuselage number, factory serial number, and registration number.

(e) Within the next 500 landings after April 14, 1980 or at the next inspection required by paragraph (a)(4) or (b)(2), whichever occurs first, visually inspect the auxiliary emergency exit door jamb for repairs in accordance with paragraph (2)(C) of McDonnell Douglas DC-9 Alert Service Bulletin A53-146, dated March 14, 1980 (hereinafter referred to as SB A53-146). Repairs not in accordance with SB A53-146 are to be modified as follows:

(1) For repairs to cracks which extend radially outboard, prior to further flight the repair must conform to the configuration defined by paragraph (2)(C) Condition III Type 3 of SB A53-146.

(2) For repairs to cracks which extend radially inboard, within the next 500 landings the repair must conform to the configuration defined by paragraph (2)(C) Condition III Type 2 of SB A53-146.

(3) For repairs to circumferentially oriented cracks, within the next 1,000 landings, the repair must conform to the configuration defined by paragraph (2)(C) Condition III Type 1 of SB A53-146.

(f) If a new replacement door jamb, P/N 5910163-9 or -255 is installed, within 10,000 landings after installation of the new door jamb, and thereafter at intervals not to exceed 2,000 landings, inspect the door jamb in accordance with paragraph (b)(2).

(g) Alternative inspections, modifications or other actions which provide an equivalent level of safety may be used when approved by the Chief, Aircraft Engineering Division, FAA Western Region.

(h) Special flight permits may be issued in accordance with FAR 21.197 and 21.199 to operate the airplanes unpressurized to a base where the inspections or crack repair can be performed.

(i) For the purposes of complying with this AD, subject to acceptance by the assigned FAA maintenance inspector, the number of landings may be determined by dividing each airplane's hours' time in service by the operator's fleet average time from takeoff to landing for the DC-9 airplane.

(j) The inspections and modifications required by this AD need not be accomplished if, after the effective date of this AD, the aircraft is operated without cabin pressurization and a placard is installed in the cockpit, in full view of the pilots, stating:

"Operation with Cabin Pressurization is Prohibited."

(k) The installation of a J060116-11 Jamb Assembly in accordance with McDonnell Douglas DC-9 Service Bulletin 53-145, Revision No. 1, dated January 29, 1981, or later revisions approved by the Chief, Los Angeles Area Aircraft Certification Office, Northwest Region, constitutes terminating action for the repetitive inspections required by paragraphs (a)(3), (a)(4) and (b)(2) of this AD.

The manufacturer's specifications and procedures identified and described in this directive are incorporated herein and made a part hereof pursuant to 5 U.S.C. 552(a)(1).

All persons affected by this directive who have not already received these documents from the manufacturer may obtain copies upon request to McDonnell Douglas Corporation, 3855 Lakewood Boulevard, Long Beach, California 90846, Attention: Director, Publications and Training, C1-750 (54-60).

These documents also may be examined at FAA Northwest Region, 9010 East Marginal Way South, Seattle, Washington 98108 or Los Angeles Area Aircraft Certification Office, 4344 Donald Douglas Drive, Long Beach, California 90808.

Amendment 39-3618 became effective December 24, 1979 and was effective upon receipt for all recipients of telegraphic AD T79WE13 dated September 18, 1979 and telegraphic AD T79WE15 dated September 28, 1979.

Amendment 39-3741 became effective April 14, 1980.

Amendment 39-3841 became effective July 17, 1980.

This Amendment 39-4191 becomes effective August 27, 1981.


FOOTER:

Document Text

Show stored source text (verify against official source)
AD Final Rules - DRS_79-24-01_R.html
Copy URL
Print/Save as PDF
Document Versions
 Feedback
Details
AD Number:
79-24-01 R3
Document Type:
AD Final Rules
Docket Number:
Unknown
Subject Heading:
Airworthiness Directives; MCDONNELL DOUGLAS DC-9 Series Airplanes
Subject:
Aft Pressure Bulkhead
Status:
Current
Citation:
This information is not available.
Citation Publish Date:
Effective Date:
08/27/1981
Make:
The Boeing Company
Model:
DC-9-11 | DC-9-12 | DC-9-13 | DC-9-14 | DC-9-15 | DC-9-15F | DC-9-21 | DC-9-31 | DC-9-32 | DC-9-32 (...Show more
Product Type:
Aircraft
Product Subtype:
Large Airplane
Affected AD:
Superseded AD:
Affected By:
Superseded By:
Service/Office:
Office of Primary Responsibility:
CFR Part Reference:
Part 39
Comments:
AIRWORTHINESS DIRECTIVES FINAL RULES: 79-24-01 R3
CITATION:   This information is not available.

PAGE NUMBER:  

DOCKET NUMBER:   Unknown

AMENDMENT:   39-4191

AD NUMBER:   79-24-01 R3

SUBJECT HEADING:   Airworthiness Directives; MCDONNELL DOUGLAS DC-9 Series Airplanes

ACTION:  

SUMMARY:  

DATES:   Effective August 27, 1981.

ADDRESSES:  

FOR FURTHER INFORMATION CONTACT:  

SUPPLEMENTARY INFORMATION:  

REGULATORY TEXT:  
79-24-01 R3 MCDONNELL DOUGLAS: Amendment 39-3618 as amended by Amendment 39-3741 and 39-3841 is further amended by Amendment 39-4191. Applies to McDonnell Douglas Model DC-9 series airplanes, certificated in all categories, equipped with the non-ventral door aft pressure bulkhead P/N 5910163, and with more than 10,000 landings.

Compliance required as indicated.

To detect fatigue cracks and prevent failure of the aft pressure bulkhead, accomplish the following:

(a) For aircraft not previously modified or repaired in accordance with McDonnell Douglas DC-9 Service Bulletin 53-127 dated May 25, 1976, accomplish the following:

(1) Within 10 landings after the effective date of this AD, unless already accomplished in accordance with telegraphic AD T79WE13 dated September 18, 1979 or telegraphic AD T79WE15 dated September 28, 1979, conduct an initial visual inspection per Step 1, Figure 1, of McDonnell Douglas DC-9 Alert Service Bulletin A53-127, Revision 1, dated September 26, 1979. The visual inspection shall encompass the entire periphery of the emergency exit doorjamb structure.

(2) Within 100 landings after the effective date of this AD, unless already accomplished in accordance with telegraphic AD T79WE15 dated September 28, 1979, conduct both visual and X-ray inspections per Steps 3 through 10, Figure 1, of McDonnell Douglas DC-9 Alert Service Bulletin A53-127, Revision 1, dated September 26, 1979. The visual portion of the inspection shall encompass the entire periphery of the doorjamb structure.

(3) Within 250 landings of the inspection required by paragraph (a)(2) of this AD and thereafter at intervals not to exceed 250 landings, conduct a visual inspection per Step 1, Figure 1, of McDonnell Douglas DC-9 Alert Service Bulletin A53-127, Revision 1, dated September 26, 1979. The visual inspection shall encompass the entire periphery of the emergency exit doorjamb structure.

(4) Within 1,000 landings from the inspection required by paragraph (a)(2) and thereafter at intervals not to exceed 1,000 landings, conduct X-ray inspections per Steps 8 through 10 and a visual inspection per Step 1, Figure 1, of McDonnell Douglas DC-9 Alert Service Bulletin A53-127, Revision 1, dated September 26, 1979. The visual inspection shall encompass the entire periphery of the emergency exit doorjamb structure.

(b) For aircraft previously modified or repaired per McDonnell Douglas DC-9 Service Bulletin 53-127 dated May 25, 1976, accomplish the following:

(1) Within 100 landings after the effective date of this AD, unless already accomplished subsequent to September 25, 1979, conduct X-ray inspections per Steps 8 through 10, Figure 1, of McDonnell Douglas DC-9 Alert Service Bulletin A53-127, Revision 1, dated September 26, 1979, and a visual inspection of the entire periphery of the emergency exit doorjamb structure.

(2) Within 2,000 landings after inspection per paragraph (b)(1) of this AD and thereafter at intervals not to exceed 2,000 landings, conduct X-ray inspections of the jamb structure per Steps 8 through 10, Figure 1, of McDonnell Douglas DC-9 Alert Service Bulletin A53-127, Revision 1, dated September 26, 1979, and a visual inspection of the entire periphery of the emergency exit doorjamb structure.

(c) If cracks are found during any of the inspections required by this AD, repair before further flight in accordance with the following:

(1) For cracks which are limited to the emergency exit doorjamb, repair as shown for Condition 2, Figure 2, of McDonnell Douglas DC-9 Alert Service Bulletin A53-127, Revision 1, dated September 26, 1979.

(2) For cracks which extend through the emergency exit doorjamb and into the pressure bulkhead web, repair as shown for Condition 3, Figure 3, of McDonnell Douglas DC-9 Alert Service Bulletin A53-127, Revision 1, dated September 26, 1979.

(3) For cracks for which no repair is prescribed in McDonnell Douglas DC-9 Alert Service Bulletin A53-127, Revision 1, dated September 26, 1979, repair in accordance with data approved by the Chief, Aircraft Engineering Division, FAA Western Region.

(d) Within 24 hours after the initial inspections per paragraph (a)(2) and paragraph (b)(1), report the results of the initial inspections by Telex to the Chief, Aircraft Engineering Division, FAA Western Region. Include in the reporting information the date and condition of modification or repair per DC-9 Service Bulletin 53-127 or A53-127, McDonnell Douglas fuselage number, factory serial number, and registration number.

(e) Within the next 500 landings after April 14, 1980 or at the next inspection required by paragraph (a)(4) or (b)(2), whichever occurs first, visually inspect the auxiliary emergency exit door jamb for repairs in accordance with paragraph (2)(C) of McDonnell Douglas DC-9 Alert Service Bulletin A53-146, dated March 14, 1980 (hereinafter referred to as SB A53-146). Repairs not in accordance with SB A53-146 are to be modified as follows:

(1) For repairs to cracks which extend radially outboard, prior to further flight the repair must conform to the configuration defined by paragraph (2)(C) Condition III Type 3 of SB A53-146.

(2) For repairs to cracks which extend radially inboard, within the next 500 landings the repair must conform to the configuration defined by paragraph (2)(C) Condition III Type 2 of SB A53-146.

(3) For repairs to circumferentially oriented cracks, within the next 1,000 landings, the repair must conform to the configuration defined by paragraph (2)(C) Condition III Type 1 of SB A53-146.

(f) If a new replacement door jamb, P/N 5910163-9 or -255 is installed, within 10,000 landings after installation of the new door jamb, and thereafter at intervals not to exceed 2,000 landings, inspect the door jamb in accordance with paragraph (b)(2).

(g) Alternative inspections, modifications or other actions which provide an equivalent level of safety may be used when approved by the Chief, Aircraft Engineering Division, FAA Western Region.

(h) Special flight permits may be issued in accordance with FAR 21.197 and 21.199 to operate the airplanes unpressurized to a base where the inspections or crack repair can be performed.

(i) For the purposes of complying with this AD, subject to acceptance by the assigned FAA maintenance inspector, the number of landings may be determined by dividing each airplane's hours' time in service by the operator's fleet average time from takeoff to landing for the DC-9 airplane.

(j) The inspections and modifications required by this AD need not be accomplished if, after the effective date of this AD, the aircraft is operated without cabin pressurization and a placard is installed in the cockpit, in full view of the pilots, stating:

"Operation with Cabin Pressurization is Prohibited."

(k) The installation of a J060116-11 Jamb Assembly in accordance with McDonnell Douglas DC-9 Service Bulletin 53-145, Revision No. 1, dated January 29, 1981, or later revisions approved by the Chief, Los Angeles Area Aircraft Certification Office, Northwest Region, constitutes terminating action for the repetitive inspections required by paragraphs (a)(3), (a)(4) and (b)(2) of this AD.

The manufacturer's specifications and procedures identified and described in this directive are incorporated herein and made a part hereof pursuant to 5 U.S.C. 552(a)(1).

All persons affected by this directive who have not already received these documents from the manufacturer may obtain copies upon request to McDonnell Douglas Corporation, 3855 Lakewood Boulevard, Long Beach, California 90846, Attention: Director, Publications and Training, C1-750 (54-60).

These documents also may be examined at FAA Northwest Region, 9010 East Marginal Way South, Seattle, Washington 98108 or Los Angeles Area Aircraft Certification Office, 4344 Donald Douglas Drive, Long Beach, California 90808.

Amendment 39-3618 became effective December 24, 1979 and was effective upon receipt for all recipients of telegraphic AD T79WE13 dated September 18, 1979 and telegraphic AD T79WE15 dated September 28, 1979.

Amendment 39-3741 became effective April 14, 1980.

Amendment 39-3841 became effective July 17, 1980.

This Amendment 39-4191 becomes effective August 27, 1981.


FOOTER:

Source: Official FAA Source ↗

Retrieved: Apr 8, 2026

Rights: U.S. Government Public Domain

This site is not affiliated with or endorsed by the FAA. Always verify with official sources.