AD 78-03-02
Applicability
| Type | Manufacturer | Model | Details |
|---|---|---|---|
| aircraft | Gulfstream Aerospace Corporation | G-1159 | Airworthiness Directives; GRUMMAN AMERICAN AVIATION CORPORATION Model G-1159 Airplanes |
Unsafe Condition
Main landing gear failures due to the installation of part number 1159SC-L202-11 or 1159SC-L202-13 side brace/actuating cylinders.
AI-generated summary from the source AD text. Verify against the official source before acting.
Required Actions
Inspect main landing gear for part numbers 1159SC-L202-11 or 1159SC-L202-13 side brace/actuating cylinders before next flight. Replace P/N 1159SC-L202-13 actuators with modified 1159SC-L202-13A units within 10 landing gear cycles. Inspect P/N 1159SC-L202-11 actuators within 100 landing gear cycles and replace if defective. Remove and replace 1159SC-L202-11A or -13A actuators after 500 cycles. Alternate methods may be approved by FAA.
AI-generated summary from the source AD text. Verify against the official source before acting.
Compliance Time
before next flight after the effective date of this A.D. (February 3, 1978) for inspection; within the next ten landing gear operating cycles for replacement of P/N 1159SC-L202-13; within the next 100 landing gear operating cycles for inspection of P/N 1159SC-L202-11; and after accumulating more than 500 actuator cycles for removal and replacement.
AI-generated summary from the source AD text. Verify against the official source before acting.
Affected Aircraft
Grumman American Aviation Corporation Model G-1159 airplanes, all serial numbers certificated in all categories.
AI-generated summary from the source AD text. Verify against the official source before acting.
Federal Register Abstract
Main Landing Gear
Applicability Source Text
Show captured applicability text from the source AD
AD Final Rules - DRS_78-03-02.html Copy URL Print/Save as PDF Document Versions Feedback Details AD Number: 78-03-02 Document Type: AD Final Rules Docket Number: Unknown Subject Heading: Airworthiness Directives; GRUMMAN AMERICAN AVIATION CORPORATION Model G-1159 Airplanes Subject: Main Landing Gear Status: Current Citation: This information is not available. Citation Publish Date: Effective Date: 02/03/1978 Make: Gulfstream Aerospace Corporation Model: G-1159 Product Type: Aircraft Product Subtype: Large Airplane Affected AD: Superseded AD: Affected By: Superseded By: Service/Office: Office of Primary Responsibility: CFR Part Reference: Part 39 Comments: AIRWORTHINESS DIRECTIVES FINAL RULES: 78-03-02 CITATION: This information is not available. PAGE NUMBER: DOCKET NUMBER: Unknown AMENDMENT: 39-3134 AD NUMBER: 78-03-02 SUBJECT HEADING: Airworthiness Directives; GRUMMAN AMERICAN AVIATION CORPORATION Model G-1159 Airplanes ACTION: SUMMARY: DATES: Effective February 3, 1978. ADDRESSES: FOR FURTHER INFORMATION CONTACT: SUPPLEMENTARY INFORMATION: REGULATORY TEXT: 78-03-02 GRUMMAN AMERICAN AVIATION CORPORATION: Amendment 39- 3134. Applies to Grumman American Aviation Corporation Model G-1159 airplanes, all serial numbers certificated in all categories. COMPLIANCE: Compliance is required as indicated. To prevent possible main landing gear failures, accomplish the following: (A) Inspect the main landing gear prior to the next flight after the effective date of this A.D. to determine if part number 1159SC-L202-11 or 1159SC-L202-13 side brace/actuating cylinders are installed. (B) Within the next ten landing gear operating cycles after the effective date of this A.D., replace all P/N 1159SC-L202-13 actuators with modified units identified as 1159SC-L202- 13A in accordance with Grumman American Aviation Corporation Mandatory Customer Bulletin #261 dated January 27, 1978. (C) Within the next 100 landing gear operating cycles after the effective date of this A.D., inspect all P/N 1159SC-L202-11 actuators in accordance with Grumman American Mandatory Customer Bulletin #261 dated January 27, 1978, and if found defective, replace with modified units identified as 1159SC-L202-11A or -13A. (D) Remove from the aircraft any 1159SC-L202-11A or 1159SC-L202-13A actuator upon accumulating more than 500 actuator cycles and replace with an allowable actuator having less than 500 cycles. (E) An alternate method of compliance with paragraphs (B), (C), or (D) of this A.D. may be used if approved by the Chief, Engineering and Manufacturing Branch, Federal Aviation Administration, Southern Region. This amendment becomes effective February 3, 1978. FOOTER:
Document Text
Show stored source text (verify against official source)
AD Final Rules - DRS_78-03-02.html Copy URL Print/Save as PDF Document Versions Feedback Details AD Number: 78-03-02 Document Type: AD Final Rules Docket Number: Unknown Subject Heading: Airworthiness Directives; GRUMMAN AMERICAN AVIATION CORPORATION Model G-1159 Airplanes Subject: Main Landing Gear Status: Current Citation: This information is not available. Citation Publish Date: Effective Date: 02/03/1978 Make: Gulfstream Aerospace Corporation Model: G-1159 Product Type: Aircraft Product Subtype: Large Airplane Affected AD: Superseded AD: Affected By: Superseded By: Service/Office: Office of Primary Responsibility: CFR Part Reference: Part 39 Comments: AIRWORTHINESS DIRECTIVES FINAL RULES: 78-03-02 CITATION: This information is not available. PAGE NUMBER: DOCKET NUMBER: Unknown AMENDMENT: 39-3134 AD NUMBER: 78-03-02 SUBJECT HEADING: Airworthiness Directives; GRUMMAN AMERICAN AVIATION CORPORATION Model G-1159 Airplanes ACTION: SUMMARY: DATES: Effective February 3, 1978. ADDRESSES: FOR FURTHER INFORMATION CONTACT: SUPPLEMENTARY INFORMATION: REGULATORY TEXT: 78-03-02 GRUMMAN AMERICAN AVIATION CORPORATION: Amendment 39- 3134. Applies to Grumman American Aviation Corporation Model G-1159 airplanes, all serial numbers certificated in all categories. COMPLIANCE: Compliance is required as indicated. To prevent possible main landing gear failures, accomplish the following: (A) Inspect the main landing gear prior to the next flight after the effective date of this A.D. to determine if part number 1159SC-L202-11 or 1159SC-L202-13 side brace/actuating cylinders are installed. (B) Within the next ten landing gear operating cycles after the effective date of this A.D., replace all P/N 1159SC-L202-13 actuators with modified units identified as 1159SC-L202- 13A in accordance with Grumman American Aviation Corporation Mandatory Customer Bulletin #261 dated January 27, 1978. (C) Within the next 100 landing gear operating cycles after the effective date of this A.D., inspect all P/N 1159SC-L202-11 actuators in accordance with Grumman American Mandatory Customer Bulletin #261 dated January 27, 1978, and if found defective, replace with modified units identified as 1159SC-L202-11A or -13A. (D) Remove from the aircraft any 1159SC-L202-11A or 1159SC-L202-13A actuator upon accumulating more than 500 actuator cycles and replace with an allowable actuator having less than 500 cycles. (E) An alternate method of compliance with paragraphs (B), (C), or (D) of this A.D. may be used if approved by the Chief, Engineering and Manufacturing Branch, Federal Aviation Administration, Southern Region. This amendment becomes effective February 3, 1978. FOOTER:
Source: Official FAA Source ↗
Retrieved: Apr 8, 2026
Rights: U.S. Government Public Domain
This site is not affiliated with or endorsed by the FAA. Always verify with official sources.