AD 76-24-03

final rule

PRATT & WHITNEY AIRCRAFT Model JT9D Engines

AD Number
76-24-03
Status
final_rule
Effective Date
Product Category
engine
Docket
Unknown
FR Citation
This information is not available.

Applicability

TypeManufacturerModelDetails
engine Pratt & Whitney Division JT9D-20 PRATT & WHITNEY AIRCRAFT Model JT9D Engines
engine Pratt & Whitney Division JT9D-20J PRATT & WHITNEY AIRCRAFT Model JT9D Engines
engine Pratt & Whitney Division JT9D-3A PRATT & WHITNEY AIRCRAFT Model JT9D Engines
engine Pratt & Whitney Division JT9D-59A PRATT & WHITNEY AIRCRAFT Model JT9D Engines
engine Pratt & Whitney Division JT9D-7 PRATT & WHITNEY AIRCRAFT Model JT9D Engines
engine Pratt & Whitney Division JT9D-70A PRATT & WHITNEY AIRCRAFT Model JT9D Engines
engine Pratt & Whitney Division JT9D-7A PRATT & WHITNEY AIRCRAFT Model JT9D Engines
engine Pratt & Whitney Division JT9D-7AH PRATT & WHITNEY AIRCRAFT Model JT9D Engines
engine Pratt & Whitney Division JT9D-7F PRATT & WHITNEY AIRCRAFT Model JT9D Engines
engine Pratt & Whitney Division JT9D-7H PRATT & WHITNEY AIRCRAFT Model JT9D Engines
engine Pratt & Whitney Division JT9D-7J PRATT & WHITNEY AIRCRAFT Model JT9D Engines
engine Pratt & Whitney Division JT9D-7Q PRATT & WHITNEY AIRCRAFT Model JT9D Engines
engine Pratt & Whitney Division JT9D-7Q3 PRATT & WHITNEY AIRCRAFT Model JT9D Engines
engine Pratt & Whitney Division JT9D-7R4D PRATT & WHITNEY AIRCRAFT Model JT9D Engines
engine Pratt & Whitney Division JT9D-7R4D1 PRATT & WHITNEY AIRCRAFT Model JT9D Engines
engine Pratt & Whitney Division JT9D-7R4E PRATT & WHITNEY AIRCRAFT Model JT9D Engines
engine Pratt & Whitney Division JT9D-7R4E1 PRATT & WHITNEY AIRCRAFT Model JT9D Engines
engine Pratt & Whitney Division JT9D-7R4E4 PRATT & WHITNEY AIRCRAFT Model JT9D Engines
engine Pratt & Whitney Division JT9D-7R4G2 PRATT & WHITNEY AIRCRAFT Model JT9D Engines
engine Pratt & Whitney Division JT9D-7R4H1 PRATT & WHITNEY AIRCRAFT Model JT9D Engines

Unsafe Condition

Failure of fan blades due to fatigue originating from undetected foreign object damage.

AI-generated summary from the source AD text. Verify against the official source before acting.

Required Actions

Visually inspect all fan blades within the next 600 hours time in service after the effective date, and every 600 hours time in service thereafter. Eddy current inspect all fan blades that have been previously damaged and blend repaired within the next 600 hours time in service. Eddy current inspect fan blades reworked per PWA Service Bulletins 4124 or 4262 within the next 3500 hours time in service.

AI-generated summary from the source AD text. Verify against the official source before acting.

Compliance Time

Within the next 600 hours time in service after the effective date of this AD, and every 600 hours time in service thereafter (for visual inspections); within the next 600 hours time in service (for eddy current inspections of previously damaged blades); within the next 3500 hours time in service (for eddy current inspections of reworked blades).

AI-generated summary from the source AD text. Verify against the official source before acting.

Affected Aircraft

Pratt & Whitney Aircraft JT9D turbofan engines with fan blades part numbers 658931, 718431, 726221, 734721, 735831, 735841, 740421, 740431, 740441, 740521, 741131, 741141, 748231, 748321, 748931, 750621, 750631, 758031, 758181, 758191, 758221, 760631, 760641, 760721, 760731, 760831, 760841, 760941, 761041, 761121, 761131, and 761141.

AI-generated summary from the source AD text. Verify against the official source before acting.

Federal Register Abstract

Fan Blades

Applicability Source Text

Show captured applicability text from the source AD
AD Final Rules - DRS_76-24-03.html
Copy URL
Print/Save as PDF
Document Versions
 Feedback
Details
AD Number:
76-24-03
Document Type:
AD Final Rules
Docket Number:
Unknown
Subject Heading:
PRATT & WHITNEY AIRCRAFT Model JT9D Engines
Subject:
Fan Blades
Status:
Current
Citation:
This information is not available.
Citation Publish Date:
Effective Date:
12/30/1976
Make:
Pratt & Whitney Division
Model:
JT9D-20 | JT9D-20J | JT9D-3A | JT9D-59A | JT9D-7 | JT9D-70A | JT9D-7A | JT9D-7AH | JT9D-7F | JT9D-7H...Show more
Product Type:
Engine
Product Subtype:
Affected AD:
Superseded AD:
Affected By:
Superseded By:
Service/Office:
Office of Primary Responsibility:
CFR Part Reference:
Part 39
Comments:
AIRWORTHINESS DIRECTIVES FINAL RULES: 76-24-03
CITATION:   This information is not available.

PAGE NUMBER:  

DOCKET NUMBER:   Unknown

AMENDMENT:   39-2776

AD NUMBER:   76-24-03

SUBJECT HEADING:   PRATT & WHITNEY AIRCRAFT Model JT9D Engines

ACTION:  

SUMMARY:  

DATES:   Effective December 30, 1976.

ADDRESSES:  

FOR FURTHER INFORMATION CONTACT:  

SUPPLEMENTARY INFORMATION:  

REGULATORY TEXT:   76-24-03 PRATT & WHITNEY AIRCRAFT: Amendment 39-2776. Applies to all Pratt & Whitney Aircraft JT9D turbofan engines containing fan blades, part numbers 658931, 718431, 726221, 734721, 735831, 735841, 740421, 740431, 740441, 740521, 741131, 741141, 748231, 748321, 748931, 750621, 750631, 758031, 758181, 758191, 758221, 760631, 760641, 760721, 760731, 760831, 760841, 760941, 761041, 761121, 761131, and 761141.
Compliance required as follows unless already accomplished.
To preclude failure of fan blades due to fatigue originating from undetected foreign object damage, inspect the critical areas of the blades in accordance with the procedures given in PWA ASB 4573, dated March 26, 1976, or later FAA approved revision, as follows:
1. Visually inspect all fan blades within the next 600 hours time in service after the effective date of this AD, and every 600 hours time in service thereafter.
2. Eddy current inspect all fan blades that have been previously damaged and blend repaired within the next 600 hours time in service after the effective date of this AD.
3. Eddy current inspect fan blades reworked per PWA Service Bulletins 4124 or 4262, without prior or subsequent damage or blend repairs, within the next 3500 hours time in service after the effective date of this AD.
If foreign object damage with a depth of .005 inch or more is found in the critical area, blend and inspect in accordance with Option 1 or Option 2 procedures given in PWA ASB No. 4573, dated March 26, 1976, or later FAA approved revision.
(NOTE: The AD does not change the present fan blade blend limits given in the JT9D engine manual.)
Upon request of the operator, an FAA maintenance inspector, subject to prior approval of the Chief, Engineering and Manufacturing Branch, FAA New England Region, may adjust the repetitive inspection intervals specified in this AD to permit compliance at an established inspection period of the operator if the request contains substantiating data to justify the increase for that operator.
The manufacturer's specifications and procedures identified and described in this directive are incorporated herein and made a part hereof pursuant to 5 U.S.C. 552(a)(1). All persons affected by this directive who have not already received these documents from the manufacturer may obtain copies upon request to Pratt & Whitney Aircraft, Division of United Technologies Corporation, 400 Main Street, East Hartford, Connecticut 06108. These documents may also be examined at Federal Aviation Administration, New England Region, 12 New England Executive Park, Burlington, Massachusetts 01803, and at FAA headquarters, 800 Independence Avenue, S.W., Washington, D.C.
A historical file on this AD which includes the incorporated material in full is maintained by the FAA at its headquarters in Washington, D.C., and at the New England Region.
This amendment becomes effective December 30, 1976.

FOOTER:

Document Text

Show stored source text (verify against official source)
AD Final Rules - DRS_76-24-03.html
Copy URL
Print/Save as PDF
Document Versions
 Feedback
Details
AD Number:
76-24-03
Document Type:
AD Final Rules
Docket Number:
Unknown
Subject Heading:
PRATT & WHITNEY AIRCRAFT Model JT9D Engines
Subject:
Fan Blades
Status:
Current
Citation:
This information is not available.
Citation Publish Date:
Effective Date:
12/30/1976
Make:
Pratt & Whitney Division
Model:
JT9D-20 | JT9D-20J | JT9D-3A | JT9D-59A | JT9D-7 | JT9D-70A | JT9D-7A | JT9D-7AH | JT9D-7F | JT9D-7H...Show more
Product Type:
Engine
Product Subtype:
Affected AD:
Superseded AD:
Affected By:
Superseded By:
Service/Office:
Office of Primary Responsibility:
CFR Part Reference:
Part 39
Comments:
AIRWORTHINESS DIRECTIVES FINAL RULES: 76-24-03
CITATION:   This information is not available.

PAGE NUMBER:  

DOCKET NUMBER:   Unknown

AMENDMENT:   39-2776

AD NUMBER:   76-24-03

SUBJECT HEADING:   PRATT & WHITNEY AIRCRAFT Model JT9D Engines

ACTION:  

SUMMARY:  

DATES:   Effective December 30, 1976.

ADDRESSES:  

FOR FURTHER INFORMATION CONTACT:  

SUPPLEMENTARY INFORMATION:  

REGULATORY TEXT:   76-24-03 PRATT & WHITNEY AIRCRAFT: Amendment 39-2776. Applies to all Pratt & Whitney Aircraft JT9D turbofan engines containing fan blades, part numbers 658931, 718431, 726221, 734721, 735831, 735841, 740421, 740431, 740441, 740521, 741131, 741141, 748231, 748321, 748931, 750621, 750631, 758031, 758181, 758191, 758221, 760631, 760641, 760721, 760731, 760831, 760841, 760941, 761041, 761121, 761131, and 761141.
Compliance required as follows unless already accomplished.
To preclude failure of fan blades due to fatigue originating from undetected foreign object damage, inspect the critical areas of the blades in accordance with the procedures given in PWA ASB 4573, dated March 26, 1976, or later FAA approved revision, as follows:
1. Visually inspect all fan blades within the next 600 hours time in service after the effective date of this AD, and every 600 hours time in service thereafter.
2. Eddy current inspect all fan blades that have been previously damaged and blend repaired within the next 600 hours time in service after the effective date of this AD.
3. Eddy current inspect fan blades reworked per PWA Service Bulletins 4124 or 4262, without prior or subsequent damage or blend repairs, within the next 3500 hours time in service after the effective date of this AD.
If foreign object damage with a depth of .005 inch or more is found in the critical area, blend and inspect in accordance with Option 1 or Option 2 procedures given in PWA ASB No. 4573, dated March 26, 1976, or later FAA approved revision.
(NOTE: The AD does not change the present fan blade blend limits given in the JT9D engine manual.)
Upon request of the operator, an FAA maintenance inspector, subject to prior approval of the Chief, Engineering and Manufacturing Branch, FAA New England Region, may adjust the repetitive inspection intervals specified in this AD to permit compliance at an established inspection period of the operator if the request contains substantiating data to justify the increase for that operator.
The manufacturer's specifications and procedures identified and described in this directive are incorporated herein and made a part hereof pursuant to 5 U.S.C. 552(a)(1). All persons affected by this directive who have not already received these documents from the manufacturer may obtain copies upon request to Pratt & Whitney Aircraft, Division of United Technologies Corporation, 400 Main Street, East Hartford, Connecticut 06108. These documents may also be examined at Federal Aviation Administration, New England Region, 12 New England Executive Park, Burlington, Massachusetts 01803, and at FAA headquarters, 800 Independence Avenue, S.W., Washington, D.C.
A historical file on this AD which includes the incorporated material in full is maintained by the FAA at its headquarters in Washington, D.C., and at the New England Region.
This amendment becomes effective December 30, 1976.

FOOTER:

Source: Official FAA Source ↗

Retrieved: Apr 8, 2026

Rights: U.S. Government Public Domain

This site is not affiliated with or endorsed by the FAA. Always verify with official sources.