AD 76-14-06
Applicability
| Type | Manufacturer | Model | Details |
|---|---|---|---|
| aircraft | The Boeing Company | 747-100 Series | BOEING Model 747 Series Airplanes |
| aircraft | The Boeing Company | 747-100B Series | BOEING Model 747 Series Airplanes |
| aircraft | The Boeing Company | 747-100B SUD Series | BOEING Model 747 Series Airplanes |
| aircraft | The Boeing Company | 747-200B Series | BOEING Model 747 Series Airplanes |
| aircraft | The Boeing Company | 747-200C Series | BOEING Model 747 Series Airplanes |
| aircraft | The Boeing Company | 747-200F Series | BOEING Model 747 Series Airplanes |
| aircraft | The Boeing Company | 747-300 Series | BOEING Model 747 Series Airplanes |
| aircraft | The Boeing Company | 747-400 Series | BOEING Model 747 Series Airplanes |
| aircraft | The Boeing Company | 747-400D Series | BOEING Model 747 Series Airplanes |
| aircraft | The Boeing Company | 747-400F Series | BOEING Model 747 Series Airplanes |
| aircraft | The Boeing Company | 747SP Series | BOEING Model 747 Series Airplanes |
| aircraft | The Boeing Company | 747SR Series | BOEING Model 747 Series Airplanes |
Unsafe Condition
Fuel leaks in dry bay areas between outboard reserve tanks and surge tanks, and engine struts, which could lead to fluid accumulation and potential fire hazards.
AI-generated summary from the source AD text. Verify against the official source before acting.
Required Actions
Inspect dry bay areas for fuel leaks and verify clear drain paths; repair leaks exceeding limits before further flight. Inspect engine struts for fuel leakage and repair before flight. Inspect overwing fuel filler caps for approved part numbers and non-metallic lanyards, or provide approved corrective action. Report findings to FAA with serial number, total time, and leak details.
AI-generated summary from the source AD text. Verify against the official source before acting.
Compliance Time
Within 20 days after the effective date of this Airworthiness Directive
AI-generated summary from the source AD text. Verify against the official source before acting.
Affected Aircraft
All Boeing 747 series airplanes certificated in all categories, excluding 747-SP with active 2 and 3 reserve tanks and 747-200 with auxiliary fuel tanks.
AI-generated summary from the source AD text. Verify against the official source before acting.
Federal Register Abstract
Fuel Leak Prevention
Applicability Source Text
Show captured applicability text from the source AD
AD Final Rules - DRS_76-14-06.html Copy URL Print/Save as PDF Document Versions Feedback Details AD Number: 76-14-06 Document Type: AD Final Rules Docket Number: Unknown Subject Heading: BOEING Model 747 Series Airplanes Subject: Fuel Leak Prevention Status: Current Citation: This information is not available. Citation Publish Date: Effective Date: Make: The Boeing Company Model: 747-100 Series | 747-100B Series | 747-100B SUD Series | 747-200B Series | 747-200C Series | 747-200...Show more Product Type: Aircraft Product Subtype: Large Airplane Affected AD: Superseded AD: Affected By: Superseded By: Service/Office: Office of Primary Responsibility: CFR Part Reference: Part 39 Comments: AIRWORTHINESS DIRECTIVES FINAL RULES: 76-14-06 CITATION: This information is not available. PAGE NUMBER: DOCKET NUMBER: Unknown AMENDMENT: 39-2664 AD NUMBER: 76-14-06 SUBJECT HEADING: BOEING Model 747 Series Airplanes ACTION: SUMMARY: DATES: ADDRESSES: FOR FURTHER INFORMATION CONTACT: SUPPLEMENTARY INFORMATION: REGULATORY TEXT: 76-14-06 BOEING: Amendment 39-2664. Applies to all Boeing 747 series airplanes certificated in all categories. Compliance required as indicated. Within 20 days after the effective date of this Airworthiness Directive, accomplish the following: 1. Inspect the dry bay areas between the outboard reserve tanks, wing station 1280, and the surge tanks, wing station 1485, for evidence of fuel leaks, unless already accomplished per Boeing service letter 747-SL-28-3 dated June 11, 1976. Verify the existence of a clear drain path through each vent/drain hole and stringer limber hole to prevent accumulation of fluids. Repair leaks per Boeing 747 Maintenance Manual Chapter 28-11-00, Figure 802. Aircraft exhibiting leakage rates exceeding Maintenance Manual limits must be repaired before further flight, except that the airplane may be flown in accordance with FAR 21.197 to a base where the repair can be performed. Clean all dry bay access door clamp rings and wing skin mating surfaces. Tighten all attach bolts to 35-40 inch-pounds of torque. This inspection is not required on 747-SP airplanes with active 2 and 3 reserve tanks and 747-200 airplanes with auxiliary fuel tanks. 2. Unless already accomplished per Boeing service letter 747-SL-28-4 dated June 21, 1976, inspect all engine struts for evidence of fuel leakage. Inspections shall be accomplished by gaining access on the left side of each nacelle strut through the B, C, and D panels with prefix numbers 452, 462, 472, or 482. Repair all fuel leaks per Boeing Maintenance Manual Chapter 28-22-07 before further flight, except that the airplane may be flown in accordance with FAR 21.197 to a base where the repair can be performed. 3. Unless already accomplished per Boeing service letter 747-SL-28-5 dated June 21, 1976, inspect overwing fuel filler caps for approved part numbers 10-3297-119 (GABB P/N 38222-2) or 10-3297-147 (GABB P/N 38222-3) and determine that non-metallic lanyards are installed, or provide corrective action in a manner approved by the Chief, Engineering and Manufacturing Branch, FAA, Northwest Region. Report all findings to the Chief, Engineering and Manufacturing Branch, FAA, Northwest Region, 9010 East Marginal Way South, Seattle, Washington 98108 through the assigned FAA principal maintenance inspector. The report must include the following: (1) Airplane serial number. (2) Airplane total time. (3) Description of condition and location of leaks. (Reporting approved by the Office of Management and Budget under OMB No. 04-R0174). The manufacturer's specifications and procedures identified and described in this directive are incorporated herein and made a part hereof pursuant to 5 U.S.C. 552(a)(i). All persons affected by this directive who have not already received these documents may obtain copies by request to the Boeing Company, P. O. Box 3707, Seattle, Washington 98124. These documents may also be examined at FAA, Northwest Region, 9010 East Marginal Way South, Seattle, Washington. This amendment becomes effective upon publication in the Federal Register for all persons except those to whom it was made effective immediately by telegram dated June 25, 1976. FOOTER:
Document Text
Show stored source text (verify against official source)
AD Final Rules - DRS_76-14-06.html Copy URL Print/Save as PDF Document Versions Feedback Details AD Number: 76-14-06 Document Type: AD Final Rules Docket Number: Unknown Subject Heading: BOEING Model 747 Series Airplanes Subject: Fuel Leak Prevention Status: Current Citation: This information is not available. Citation Publish Date: Effective Date: Make: The Boeing Company Model: 747-100 Series | 747-100B Series | 747-100B SUD Series | 747-200B Series | 747-200C Series | 747-200...Show more Product Type: Aircraft Product Subtype: Large Airplane Affected AD: Superseded AD: Affected By: Superseded By: Service/Office: Office of Primary Responsibility: CFR Part Reference: Part 39 Comments: AIRWORTHINESS DIRECTIVES FINAL RULES: 76-14-06 CITATION: This information is not available. PAGE NUMBER: DOCKET NUMBER: Unknown AMENDMENT: 39-2664 AD NUMBER: 76-14-06 SUBJECT HEADING: BOEING Model 747 Series Airplanes ACTION: SUMMARY: DATES: ADDRESSES: FOR FURTHER INFORMATION CONTACT: SUPPLEMENTARY INFORMATION: REGULATORY TEXT: 76-14-06 BOEING: Amendment 39-2664. Applies to all Boeing 747 series airplanes certificated in all categories. Compliance required as indicated. Within 20 days after the effective date of this Airworthiness Directive, accomplish the following: 1. Inspect the dry bay areas between the outboard reserve tanks, wing station 1280, and the surge tanks, wing station 1485, for evidence of fuel leaks, unless already accomplished per Boeing service letter 747-SL-28-3 dated June 11, 1976. Verify the existence of a clear drain path through each vent/drain hole and stringer limber hole to prevent accumulation of fluids. Repair leaks per Boeing 747 Maintenance Manual Chapter 28-11-00, Figure 802. Aircraft exhibiting leakage rates exceeding Maintenance Manual limits must be repaired before further flight, except that the airplane may be flown in accordance with FAR 21.197 to a base where the repair can be performed. Clean all dry bay access door clamp rings and wing skin mating surfaces. Tighten all attach bolts to 35-40 inch-pounds of torque. This inspection is not required on 747-SP airplanes with active 2 and 3 reserve tanks and 747-200 airplanes with auxiliary fuel tanks. 2. Unless already accomplished per Boeing service letter 747-SL-28-4 dated June 21, 1976, inspect all engine struts for evidence of fuel leakage. Inspections shall be accomplished by gaining access on the left side of each nacelle strut through the B, C, and D panels with prefix numbers 452, 462, 472, or 482. Repair all fuel leaks per Boeing Maintenance Manual Chapter 28-22-07 before further flight, except that the airplane may be flown in accordance with FAR 21.197 to a base where the repair can be performed. 3. Unless already accomplished per Boeing service letter 747-SL-28-5 dated June 21, 1976, inspect overwing fuel filler caps for approved part numbers 10-3297-119 (GABB P/N 38222-2) or 10-3297-147 (GABB P/N 38222-3) and determine that non-metallic lanyards are installed, or provide corrective action in a manner approved by the Chief, Engineering and Manufacturing Branch, FAA, Northwest Region. Report all findings to the Chief, Engineering and Manufacturing Branch, FAA, Northwest Region, 9010 East Marginal Way South, Seattle, Washington 98108 through the assigned FAA principal maintenance inspector. The report must include the following: (1) Airplane serial number. (2) Airplane total time. (3) Description of condition and location of leaks. (Reporting approved by the Office of Management and Budget under OMB No. 04-R0174). The manufacturer's specifications and procedures identified and described in this directive are incorporated herein and made a part hereof pursuant to 5 U.S.C. 552(a)(i). All persons affected by this directive who have not already received these documents may obtain copies by request to the Boeing Company, P. O. Box 3707, Seattle, Washington 98124. These documents may also be examined at FAA, Northwest Region, 9010 East Marginal Way South, Seattle, Washington. This amendment becomes effective upon publication in the Federal Register for all persons except those to whom it was made effective immediately by telegram dated June 25, 1976. FOOTER:
Source: Official FAA Source ↗
Retrieved: Apr 8, 2026
Rights: U.S. Government Public Domain
This site is not affiliated with or endorsed by the FAA. Always verify with official sources.