AD 75-17-19

final rule
Data completeness: 70%

Airworthiness Directives; Siai-Marchetti Model F.260 Airplanes

AD Number
75-17-19
Status
final_rule
Effective Date
Product Category
aircraft
Docket
Unknown
FR Citation
This information is not available.

Applicability

TypeManufacturerModelDetails
aircraft Aermacchi S.p.A. F.260 Airworthiness Directives; Siai-Marchetti Model F.260 Airplanes

Unsafe Condition

Failure of the landing gear due to cracks in the landing gear actuator brackets, P/N 260-05-1413 and -14, or P/N 260-05-14-25 and -26, installed on Bulkhead No. 5.

AI-generated summary from the source AD text. Verify against the official source before acting.

Required Actions

Inspect the landing gear actuator brackets for cracks within 25 hours' time in service after the effective date, repeating every 50 hours until replaced. Replace cracked brackets with P/N 260-05-201-03 before further flight. Replace all brackets within 500 hours if no cracks are found.

AI-generated summary from the source AD text. Verify against the official source before acting.

Compliance Time

Within the next 25 hours' time in service after the effective date of this AD, and thereafter at intervals not to exceed 50 hours' time in service from the last inspection, until replaced.

AI-generated summary from the source AD text. Verify against the official source before acting.

Affected Aircraft

SIAI Marchetti F.260 airplanes, Serial Numbers 101 thru 125; 2-26 thru 2-57; 2-59 thru 2-61; 3-76 thru 3-81 and 502.

AI-generated summary from the source AD text. Verify against the official source before acting.

Source: Official FAA Source ↗

Retrieved: Apr 8, 2026

Rights: U.S. Government Public Domain

This site is not affiliated with or endorsed by the FAA. Always verify with official sources.