AD 75-04-05
Applicability
| Type | Manufacturer | Model | Details |
|---|---|---|---|
| aircraft | Sabreliner Corporation | NA-265 | Airworthiness Directives; ROCKWELL INTERNATIONAL Models NA-265 Series Airplanes |
| aircraft | Sabreliner Corporation | NA-265-20 | Airworthiness Directives; ROCKWELL INTERNATIONAL Models NA-265 Series Airplanes |
| aircraft | Sabreliner Corporation | NA-265-30 | Airworthiness Directives; ROCKWELL INTERNATIONAL Models NA-265 Series Airplanes |
| aircraft | Sabreliner Corporation | NA-265-40 | Airworthiness Directives; ROCKWELL INTERNATIONAL Models NA-265 Series Airplanes |
| aircraft | Sabreliner Corporation | NA-265-60 | Airworthiness Directives; ROCKWELL INTERNATIONAL Models NA-265 Series Airplanes |
| aircraft | Sabreliner Corporation | NA-265-65 | Airworthiness Directives; ROCKWELL INTERNATIONAL Models NA-265 Series Airplanes |
| aircraft | Sabreliner Corporation | NA-265-70 | Airworthiness Directives; ROCKWELL INTERNATIONAL Models NA-265 Series Airplanes |
| aircraft | Sabreliner Corporation | NA-265-80 | Airworthiness Directives; ROCKWELL INTERNATIONAL Models NA-265 Series Airplanes |
Unsafe Condition
Incipient failure condition in the engine fuel pressure switch, Hydra-Electric Co. P/N 12251, could result in fuel seepage or leakage.
AI-generated summary from the source AD text. Verify against the official source before acting.
Required Actions
Within 10 hours' time in service after the effective date, inspect the engine fuel pressure switches for fuel seepage or leakage. If found, replace the failed switch before further flight. Repeat inspections every 10 hours until (b) is completed. Within 90 days, determine the part number of the switch and either install per Service Bulletin steps 4-10 or repeat inspections until installation is done.
AI-generated summary from the source AD text. Verify against the official source before acting.
Compliance Time
Within 10 hours' time in service after the effective date of this AD and within 90 days after the effective date of this AD
AI-generated summary from the source AD text. Verify against the official source before acting.
Affected Aircraft
Rockwell International Models NA-265 Series Airplanes certificated in all categories.
AI-generated summary from the source AD text. Verify against the official source before acting.
Federal Register Abstract
Engine Fuel Pressure Switches
Applicability Source Text
Show captured applicability text from the source AD
AD Final Rules - DRS_75-04-05.html Copy URL Print/Save as PDF Document Versions Feedback Details AD Number: 75-04-05 Document Type: AD Final Rules Docket Number: Unknown Subject Heading: Airworthiness Directives; ROCKWELL INTERNATIONAL Models NA-265 Series Airplanes Subject: Engine Fuel Pressure Switches Status: Current Citation: This information is not available. Citation Publish Date: Effective Date: 02/18/1975 Make: Sabreliner Corporation Model: NA-265 | NA-265-20 | NA-265-30 | NA-265-40 | NA-265-60 | NA-265-65 | NA-265-70 | NA-265-80 Product Type: Aircraft Product Subtype: Large Airplane Affected AD: Superseded AD: Affected By: Superseded By: Service/Office: Office of Primary Responsibility: CFR Part Reference: Part 39 Comments: AIRWORTHINESS DIRECTIVES FINAL RULES: 75-04-05 CITATION: This information is not available. PAGE NUMBER: DOCKET NUMBER: Unknown AMENDMENT: 39-2087 AD NUMBER: 75-04-05 SUBJECT HEADING: Airworthiness Directives; ROCKWELL INTERNATIONAL Models NA-265 Series Airplanes ACTION: SUMMARY: DATES: Effective February 18, 1975. ADDRESSES: FOR FURTHER INFORMATION CONTACT: SUPPLEMENTARY INFORMATION: REGULATORY TEXT: 75-04-05 ROCKWELL INTERNATIONAL: Amendment 39-2087. Applies to all NA- 265 Series Airplanes certificated in all categories. Compliance as indicated, unless already accomplished. To provide protection in the event of an unknown incipient failure condition in the engine fuel pressure switch, Hydra-Electric Co. P/N 12251, accomplish the following: (a) Within 10 hours' time in service after the effective date of this AD, inspect the engine fuel pressure switches for fuel seepage or leakage. (1) If seepage or leakage is found, replace the failed switch before further flight, in accordance with Sabreliner Service Bulletin 74-34, dated January 15, 1975, revised January 24, 1975, or later FAA-approved revisions. (2) If seepage or leakage is not found, repeat the inspection at intervals not to exceed 10 hours' time in service until the inspection and installation described in (b) are accomplished. (b) Within 90 days after the effective date of this AD, conduct an inspection to determine the part number of the engine fuel pressure switch installed in accordance with steps 1 through 3 of Sabreliner Service Bulletin 74-34, dated January 15, 1975, revised January 24, 1975, or later FAA-approved revisions. (1) If Hydra-Electric Co. P/N 12251 is found installed, either (i) Accomplish the installation described in steps 4 through 10 of Sabreliner Service Bulletin 74-34, dated January 15, 1975, revised January 24, 1975, or later FAA-approved revisions, prior to further flight; or (ii) Repeat (a) above, until the installation described in (b)(1)(i) is accomplished. The installation required by (b)(1)(i) is to be performed within 90 days after the effective date of this AD. (c) If P/N 1B2522-25 (Aero Instruments Co., or Century Electronics and Instrument Inc., or Hathaway Industries, or Electro Controls Inc.), or P/N 685-1, Value Engineering Products, is installed, proceed with steps 8 through 10 of Sabreliner Service Bulletin 74-34, dated January 15, 1975, revised January 24, 1975, or later FAA-approved revisions. (d) Airplanes may be flown to a base for the performance of the inspections and installations required by this AD, per FAR's 21.197 and 21.199, except when seepage or leakage is known to exist. (e) Return P/N 12251 switches removed from service to Rockwell International, Aviation Services Division, Lambert Field, St. Louis, Mo. 63145. (f) Equivalent inspections and installations may be approved by the Chief, Aircraft Engineering Division, FAA Western Region, upon submission of adequate substantiating data. This amendment becomes effective February 18, 1975. FOOTER:
Document Text
Show stored source text (verify against official source)
AD Final Rules - DRS_75-04-05.html Copy URL Print/Save as PDF Document Versions Feedback Details AD Number: 75-04-05 Document Type: AD Final Rules Docket Number: Unknown Subject Heading: Airworthiness Directives; ROCKWELL INTERNATIONAL Models NA-265 Series Airplanes Subject: Engine Fuel Pressure Switches Status: Current Citation: This information is not available. Citation Publish Date: Effective Date: 02/18/1975 Make: Sabreliner Corporation Model: NA-265 | NA-265-20 | NA-265-30 | NA-265-40 | NA-265-60 | NA-265-65 | NA-265-70 | NA-265-80 Product Type: Aircraft Product Subtype: Large Airplane Affected AD: Superseded AD: Affected By: Superseded By: Service/Office: Office of Primary Responsibility: CFR Part Reference: Part 39 Comments: AIRWORTHINESS DIRECTIVES FINAL RULES: 75-04-05 CITATION: This information is not available. PAGE NUMBER: DOCKET NUMBER: Unknown AMENDMENT: 39-2087 AD NUMBER: 75-04-05 SUBJECT HEADING: Airworthiness Directives; ROCKWELL INTERNATIONAL Models NA-265 Series Airplanes ACTION: SUMMARY: DATES: Effective February 18, 1975. ADDRESSES: FOR FURTHER INFORMATION CONTACT: SUPPLEMENTARY INFORMATION: REGULATORY TEXT: 75-04-05 ROCKWELL INTERNATIONAL: Amendment 39-2087. Applies to all NA- 265 Series Airplanes certificated in all categories. Compliance as indicated, unless already accomplished. To provide protection in the event of an unknown incipient failure condition in the engine fuel pressure switch, Hydra-Electric Co. P/N 12251, accomplish the following: (a) Within 10 hours' time in service after the effective date of this AD, inspect the engine fuel pressure switches for fuel seepage or leakage. (1) If seepage or leakage is found, replace the failed switch before further flight, in accordance with Sabreliner Service Bulletin 74-34, dated January 15, 1975, revised January 24, 1975, or later FAA-approved revisions. (2) If seepage or leakage is not found, repeat the inspection at intervals not to exceed 10 hours' time in service until the inspection and installation described in (b) are accomplished. (b) Within 90 days after the effective date of this AD, conduct an inspection to determine the part number of the engine fuel pressure switch installed in accordance with steps 1 through 3 of Sabreliner Service Bulletin 74-34, dated January 15, 1975, revised January 24, 1975, or later FAA-approved revisions. (1) If Hydra-Electric Co. P/N 12251 is found installed, either (i) Accomplish the installation described in steps 4 through 10 of Sabreliner Service Bulletin 74-34, dated January 15, 1975, revised January 24, 1975, or later FAA-approved revisions, prior to further flight; or (ii) Repeat (a) above, until the installation described in (b)(1)(i) is accomplished. The installation required by (b)(1)(i) is to be performed within 90 days after the effective date of this AD. (c) If P/N 1B2522-25 (Aero Instruments Co., or Century Electronics and Instrument Inc., or Hathaway Industries, or Electro Controls Inc.), or P/N 685-1, Value Engineering Products, is installed, proceed with steps 8 through 10 of Sabreliner Service Bulletin 74-34, dated January 15, 1975, revised January 24, 1975, or later FAA-approved revisions. (d) Airplanes may be flown to a base for the performance of the inspections and installations required by this AD, per FAR's 21.197 and 21.199, except when seepage or leakage is known to exist. (e) Return P/N 12251 switches removed from service to Rockwell International, Aviation Services Division, Lambert Field, St. Louis, Mo. 63145. (f) Equivalent inspections and installations may be approved by the Chief, Aircraft Engineering Division, FAA Western Region, upon submission of adequate substantiating data. This amendment becomes effective February 18, 1975. FOOTER:
Source: Official FAA Source ↗
Retrieved: Apr 8, 2026
Rights: U.S. Government Public Domain
This site is not affiliated with or endorsed by the FAA. Always verify with official sources.