AD 72-16-10

final rule

Airworthiness Directives; BOEING-VERTOL Model 107-II Helicopters

AD Number
72-16-10
Status
final_rule
Effective Date
Product Category
aircraft
Docket
Unknown
FR Citation
This information is not available.

Applicability

TypeManufacturerModelDetails
aircraft Columbia Helicopters, Inc. 107-II Airworthiness Directives; BOEING-VERTOL Model 107-II Helicopters

Unsafe Condition

Failure of the aft transmission collector gear or separation of the aft transmission planetary carrier retention nut may cause dephasing of the main rotors.

AI-generated summary from the source AD text. Verify against the official source before acting.

Required Actions

Inspect for cracks and flat spline root radii and shot peen internal splines of specified collector gears; change part number identification per service bulletin. Loosen, retorque, and install lock pins in the planetary carrier retention nut; mark transmission nameplate per service bulletin.

AI-generated summary from the source AD text. Verify against the official source before acting.

Compliance Time

Within the next 15 hours in service after the effective date of this AD and within 50 hours time in service after last retorquing of planet carrier retention nut.

AI-generated summary from the source AD text. Verify against the official source before acting.

Affected Aircraft

BOEING-VERTOL Model 107-II helicopters certificated in all categories.

AI-generated summary from the source AD text. Verify against the official source before acting.

Federal Register Abstract

Aft Transmission Ring

Applicability Source Text

Show captured applicability text from the source AD
AD Final Rules - DRS_72-16-10.html
Copy URL
Print/Save as PDF
Document Versions
 Feedback
Details
AD Number:
72-16-10
Document Type:
AD Final Rules
Docket Number:
Unknown
Subject Heading:
Airworthiness Directives; BOEING-VERTOL Model 107-II Helicopters
Subject:
Aft Transmission Ring
Status:
Current
Citation:
This information is not available.
Citation Publish Date:
Effective Date:
08/11/1972
Make:
Columbia Helicopters, Inc.
Model:
107-II
Product Type:
Aircraft
Product Subtype:
Rotorcraft
Affected AD:
Superseded AD:
Affected By:
Superseded By:
Service/Office:
Office of Primary Responsibility:
CFR Part Reference:
Part 39
Comments:
AIRWORTHINESS DIRECTIVES FINAL RULES: 72-16-10
CITATION:   This information is not available.

PAGE NUMBER:  

DOCKET NUMBER:   Unknown

AMENDMENT:   39-1498

AD NUMBER:   72-16-10

SUBJECT HEADING:   Airworthiness Directives; BOEING-VERTOL Model 107-II Helicopters

ACTION:  

SUMMARY:  

DATES:   Effective August 11, 1972.

ADDRESSES:  

FOR FURTHER INFORMATION CONTACT:  

SUPPLEMENTARY INFORMATION:  

REGULATORY TEXT:  
72-16-10 BOEING-VERTOL: Amendment 39-1498. Applies to Model 107-II helicopters certificated in all categories.

Compliance required as indicated below:

To prevent failure of the aft transmission collector gear and to prevent separation of the aft transmission planetary carrier retention nut, either of which may cause dephasing of the main rotors, accomplish the following:

a. Within the next 15 hours in service after the effective date of this AD, unless already accomplished, inspect for cracks and flat spline root radii and shot peen internal splines of serial number designated collector gears P/N 107D2066-10 or -12 or -14 and change part number identification in accordance with Accomplishment Instructions Parts I and II of Boeing-Vertol Service Bulletin No. A107-318R-1 dated 19 June 1972 or equivalent methods approved by the Chief, Engineering and Manufacturing Branch, FAA Eastern Region. All other serial numbered collector gears shall be inspected and shot peened at the next transmission overhaul or within 800 hours, whichever comes first.

b. Within 50 hours time in service after last retorquing of planet carrier retention nut, unless already accomplished, loosen, retorque, and install lock pins in the aft transmission planetary carrier retention nut (P/N 107D1276-7, VS10304-39 or BACN10-GR39) and mark transmission nameplate in accordance with Accomplishment Instructions Parts I and III of Boeing-Vertol Service Bulletin No. A107- 317 dated 12 January 1972 or equivalent methods approved by the Chief, Engineering and Manufacturing Branch, FAA Eastern Region.

This amendment is effective August 11, 1972.

FOOTER:

Document Text

Show stored source text (verify against official source)
AD Final Rules - DRS_72-16-10.html
Copy URL
Print/Save as PDF
Document Versions
 Feedback
Details
AD Number:
72-16-10
Document Type:
AD Final Rules
Docket Number:
Unknown
Subject Heading:
Airworthiness Directives; BOEING-VERTOL Model 107-II Helicopters
Subject:
Aft Transmission Ring
Status:
Current
Citation:
This information is not available.
Citation Publish Date:
Effective Date:
08/11/1972
Make:
Columbia Helicopters, Inc.
Model:
107-II
Product Type:
Aircraft
Product Subtype:
Rotorcraft
Affected AD:
Superseded AD:
Affected By:
Superseded By:
Service/Office:
Office of Primary Responsibility:
CFR Part Reference:
Part 39
Comments:
AIRWORTHINESS DIRECTIVES FINAL RULES: 72-16-10
CITATION:   This information is not available.

PAGE NUMBER:  

DOCKET NUMBER:   Unknown

AMENDMENT:   39-1498

AD NUMBER:   72-16-10

SUBJECT HEADING:   Airworthiness Directives; BOEING-VERTOL Model 107-II Helicopters

ACTION:  

SUMMARY:  

DATES:   Effective August 11, 1972.

ADDRESSES:  

FOR FURTHER INFORMATION CONTACT:  

SUPPLEMENTARY INFORMATION:  

REGULATORY TEXT:  
72-16-10 BOEING-VERTOL: Amendment 39-1498. Applies to Model 107-II helicopters certificated in all categories.

Compliance required as indicated below:

To prevent failure of the aft transmission collector gear and to prevent separation of the aft transmission planetary carrier retention nut, either of which may cause dephasing of the main rotors, accomplish the following:

a. Within the next 15 hours in service after the effective date of this AD, unless already accomplished, inspect for cracks and flat spline root radii and shot peen internal splines of serial number designated collector gears P/N 107D2066-10 or -12 or -14 and change part number identification in accordance with Accomplishment Instructions Parts I and II of Boeing-Vertol Service Bulletin No. A107-318R-1 dated 19 June 1972 or equivalent methods approved by the Chief, Engineering and Manufacturing Branch, FAA Eastern Region. All other serial numbered collector gears shall be inspected and shot peened at the next transmission overhaul or within 800 hours, whichever comes first.

b. Within 50 hours time in service after last retorquing of planet carrier retention nut, unless already accomplished, loosen, retorque, and install lock pins in the aft transmission planetary carrier retention nut (P/N 107D1276-7, VS10304-39 or BACN10-GR39) and mark transmission nameplate in accordance with Accomplishment Instructions Parts I and III of Boeing-Vertol Service Bulletin No. A107- 317 dated 12 January 1972 or equivalent methods approved by the Chief, Engineering and Manufacturing Branch, FAA Eastern Region.

This amendment is effective August 11, 1972.

FOOTER:

Source: Official FAA Source ↗

Retrieved: Apr 8, 2026

Rights: U.S. Government Public Domain

This site is not affiliated with or endorsed by the FAA. Always verify with official sources.