AD 70-03-06

final rule
Data completeness: 70%

Airworthiness Directives; Britten-Norman Models BN-2 and BN-2A Airplanes

AD Number
70-03-06
Status
final_rule
Effective Date
Product Category
aircraft
Docket
Unknown
FR Citation
This information is not available.

Applicability

TypeManufacturerModelDetails
aircraft B-N Group Ltd. BN-2 Airworthiness Directives; Britten-Norman Models BN-2 and BN-2A Airplanes
aircraft B-N Group Ltd. BN-2A Airworthiness Directives; Britten-Norman Models BN-2 and BN-2A Airplanes
aircraft B-N Group Ltd. BN-2A-2 Airworthiness Directives; Britten-Norman Models BN-2 and BN-2A Airplanes
aircraft B-N Group Ltd. BN-2A-20 Airworthiness Directives; Britten-Norman Models BN-2 and BN-2A Airplanes
aircraft B-N Group Ltd. BN-2A-21 Airworthiness Directives; Britten-Norman Models BN-2 and BN-2A Airplanes
aircraft B-N Group Ltd. BN-2A-26 Airworthiness Directives; Britten-Norman Models BN-2 and BN-2A Airplanes
aircraft B-N Group Ltd. BN-2A-27 Airworthiness Directives; Britten-Norman Models BN-2 and BN-2A Airplanes
aircraft B-N Group Ltd. BN-2A-3 Airworthiness Directives; Britten-Norman Models BN-2 and BN-2A Airplanes
aircraft B-N Group Ltd. BN-2A-6 Airworthiness Directives; Britten-Norman Models BN-2 and BN-2A Airplanes
aircraft B-N Group Ltd. BN-2A-8 Airworthiness Directives; Britten-Norman Models BN-2 and BN-2A Airplanes

Unsafe Condition

Failure of the rudder bar assembly due to failure of the silver solder joint attaching the bronze bushing to the inboard end of the rudder bar beams.

AI-generated summary from the source AD text. Verify against the official source before acting.

Required Actions

Within 20 hours' time in service after the effective date, inspect the silver solder joint visually for failure in accordance with Service Bulletin BN-2/SB.20. Repeat inspections at intervals not exceeding 20 hours' time in service. If failure is found, rework by welding a steel bushing or replace with a serviceable beam incorporating Modification NB/M/341. Discontinue inspections after rework or replacement.

AI-generated summary from the source AD text. Verify against the official source before acting.

Compliance Time

Within the next 20 hours' time in service after the effective date of this AD, unless already accomplished, and thereafter at intervals not to exceed 20 hours' time in service since the last inspection.

AI-generated summary from the source AD text. Verify against the official source before acting.

Affected Aircraft

B-N Group Ltd. Models BN-2 and BN-2A airplanes.

AI-generated summary from the source AD text. Verify against the official source before acting.

Source: Official FAA Source ↗

Retrieved: Apr 8, 2026

Rights: U.S. Government Public Domain

This site is not affiliated with or endorsed by the FAA. Always verify with official sources.