AD 69-26-06

final rule
Data completeness: 70%

Airworthiness Directives; MCDONNELL DOUGLAS DC-9 Series Aircraft

AD Number
69-26-06
Status
final_rule
Effective Date
Product Category
aircraft
Docket
Unknown
FR Citation
This information is not available.

Applicability

TypeManufacturerModelDetails
aircraft The Boeing Company DC-9-11 Airworthiness Directives; MCDONNELL DOUGLAS DC-9 Series Aircraft
aircraft The Boeing Company DC-9-12 Airworthiness Directives; MCDONNELL DOUGLAS DC-9 Series Aircraft
aircraft The Boeing Company DC-9-13 Airworthiness Directives; MCDONNELL DOUGLAS DC-9 Series Aircraft
aircraft The Boeing Company DC-9-14 Airworthiness Directives; MCDONNELL DOUGLAS DC-9 Series Aircraft
aircraft The Boeing Company DC-9-15 Airworthiness Directives; MCDONNELL DOUGLAS DC-9 Series Aircraft
aircraft The Boeing Company DC-9-15F Airworthiness Directives; MCDONNELL DOUGLAS DC-9 Series Aircraft
aircraft The Boeing Company DC-9-21 Airworthiness Directives; MCDONNELL DOUGLAS DC-9 Series Aircraft
aircraft The Boeing Company DC-9-31 Airworthiness Directives; MCDONNELL DOUGLAS DC-9 Series Aircraft
aircraft The Boeing Company DC-9-32 Airworthiness Directives; MCDONNELL DOUGLAS DC-9 Series Aircraft
aircraft The Boeing Company DC-9-32 (VC-9C) Airworthiness Directives; MCDONNELL DOUGLAS DC-9 Series Aircraft

Unsafe Condition

Heat damage to HF and V.H.F. coaxial cables and other wiring located in the tail compartment adjacent to the 8th stage bleed duct and APU exhaust shroud.

AI-generated summary from the source AD text. Verify against the official source before acting.

Required Actions

Inspect or replace HF and V.H.F. coaxial cables for heat damage; provide clearance between cables and bleed duct; inspect and replace APU exhaust shroud if necessary; pressure test pneumatic duct installation; reroute cables and install insulation blankets as per Service Bulletins within specified timeframes.

AI-generated summary from the source AD text. Verify against the official source before acting.

Compliance Time

Within the next 200 hours' time in service after the effective date of this AD for initial inspections and repairs, and within 2000 hours' time in service for the comprehensive modifications under section B.

AI-generated summary from the source AD text. Verify against the official source before acting.

Affected Aircraft

McDonnell Douglas Model DC-9 Series aircraft including DC-9-11, DC-9-12, DC-9-13, DC-9-14, DC-9-15, DC-9-15F, DC-9-21, DC-9-31, DC-9-32, and others as listed.

AI-generated summary from the source AD text. Verify against the official source before acting.

Source: Official FAA Source ↗

Retrieved: Apr 8, 2026

Rights: U.S. Government Public Domain

This site is not affiliated with or endorsed by the FAA. Always verify with official sources.