AD 69-19-05

final rule

Airworthiness Directives; Dornier International GmbH Model DO-28D-1 Airplanes

AD Number
69-19-05
Status
final_rule
Effective Date
Product Category
aircraft
Docket
Unknown
FR Citation
This information is not available.
Technical illustration of an aircraft flight control surface and actuator
Problem area Flight controls

Applicability

TypeManufacturerModelDetails
aircraft Dornier Luftfahrt GmbH Do 28 D-1 Airworthiness Directives; Dornier International GmbH Model DO-28D-1 Airplanes

Unsafe Condition

Lateral displacement of the rubber grommet eye on the elevator control bellcrank bushing P/N 28.01.403-040.10 could cause possible jamming of the elevator control.

AI-generated summary from the source AD text. Verify against the official source before acting.

Required Actions

Visually inspect the elevator control bellcrank for grommet displacement. If displacement is 0.10 inches or more, rework the bushing before further flight. If less than 0.10 inches, rework within the next 100 hours time in service.

AI-generated summary from the source AD text. Verify against the official source before acting.

Compliance Time

within the next 10 hours time in service after the effective date of this AD

AI-generated summary from the source AD text. Verify against the official source before acting.

Affected Aircraft

Dornier International GmbH Model DO-28D-1 airplanes, Serial Numbers 4002 through 4019

AI-generated summary from the source AD text. Verify against the official source before acting.

Federal Register Abstract

Elevator Control

Applicability Source Text

Show captured applicability text from the source AD
AD Final Rules - DRS_69-19-05.html
Copy URL
Print/Save as PDF
Document Versions
 Feedback
Details
AD Number:
69-19-05
Document Type:
AD Final Rules
Docket Number:
Unknown
Subject Heading:
Airworthiness Directives; Dornier International GmbH Model DO-28D-1 Airplanes
Subject:
Elevator Control
Status:
Current
Citation:
This information is not available.
Citation Publish Date:
Effective Date:
09/15/1969
Make:
Dornier Luftfahrt GmbH
Model:
Do 28 D-1
Product Type:
Aircraft
Product Subtype:
Small/Large Airplane
Affected AD:
Superseded AD:
Affected By:
Superseded By:
Service/Office:
Office of Primary Responsibility:
CFR Part Reference:
Part 39
Comments:
AIRWORTHINESS DIRECTIVES FINAL RULES: 69-19-05
CITATION:   This information is not available.

PAGE NUMBER:  

DOCKET NUMBER:   Unknown

AMENDMENT:   39-840

AD NUMBER:   69-19-05

SUBJECT HEADING:   Airworthiness Directives; Dornier International GmbH Model DO-28D-1 Airplanes

ACTION:  

SUMMARY:  

DATES:   Effective September 15, 1969.

ADDRESSES:  

FOR FURTHER INFORMATION CONTACT:  

SUPPLEMENTARY INFORMATION:  

REGULATORY TEXT:  
69-19-05 DORNIER INTERNATIONAL GmbH: Amdt. 39-840. Applies to Dornier Model DO-28D-1 airplanes, Serial Numbers 4002 through 4019.

To prevent possible jamming of the elevator control, accomplish the following:

(a) Within the next 10 hours time in service after the effective date of this AD, unless already accomplished, visually inspect the elevator control bellcrank for lateral displacement of the rubber grommet eye on the bushing, in accordance with Dornier Service Bulletin No. 001-1403 dated 12 May 1969 or an FAA-approved equivalent.

(b) If the displacement of rubber grommet eye on the bushing is found to be 0.10 inches or more, before further flight, rework the bushing P/N 28.01.403-040.10 in accordance with Dornier Service Bulletin No. 001-1403, dated 12 May 1969 or an FAA-approved equivalent.

(c) If the displacement of rubber grommet eye on the bushing is found to be less than 0.10 inches, within the next 100 hours time in service after the effective date of this AD, unless already accomplished, rework the bushing P/N 28.01.403-040.10 in accordance with Dornier Service Bulletin No. 001-1403, dated 12 May 1969 or an FAA-approved equivalent.

This amendment becomes effective September 15, 1969.

FOOTER:

Document Text

Show stored source text (verify against official source)
AD Final Rules - DRS_69-19-05.html
Copy URL
Print/Save as PDF
Document Versions
 Feedback
Details
AD Number:
69-19-05
Document Type:
AD Final Rules
Docket Number:
Unknown
Subject Heading:
Airworthiness Directives; Dornier International GmbH Model DO-28D-1 Airplanes
Subject:
Elevator Control
Status:
Current
Citation:
This information is not available.
Citation Publish Date:
Effective Date:
09/15/1969
Make:
Dornier Luftfahrt GmbH
Model:
Do 28 D-1
Product Type:
Aircraft
Product Subtype:
Small/Large Airplane
Affected AD:
Superseded AD:
Affected By:
Superseded By:
Service/Office:
Office of Primary Responsibility:
CFR Part Reference:
Part 39
Comments:
AIRWORTHINESS DIRECTIVES FINAL RULES: 69-19-05
CITATION:   This information is not available.

PAGE NUMBER:  

DOCKET NUMBER:   Unknown

AMENDMENT:   39-840

AD NUMBER:   69-19-05

SUBJECT HEADING:   Airworthiness Directives; Dornier International GmbH Model DO-28D-1 Airplanes

ACTION:  

SUMMARY:  

DATES:   Effective September 15, 1969.

ADDRESSES:  

FOR FURTHER INFORMATION CONTACT:  

SUPPLEMENTARY INFORMATION:  

REGULATORY TEXT:  
69-19-05 DORNIER INTERNATIONAL GmbH: Amdt. 39-840. Applies to Dornier Model DO-28D-1 airplanes, Serial Numbers 4002 through 4019.

To prevent possible jamming of the elevator control, accomplish the following:

(a) Within the next 10 hours time in service after the effective date of this AD, unless already accomplished, visually inspect the elevator control bellcrank for lateral displacement of the rubber grommet eye on the bushing, in accordance with Dornier Service Bulletin No. 001-1403 dated 12 May 1969 or an FAA-approved equivalent.

(b) If the displacement of rubber grommet eye on the bushing is found to be 0.10 inches or more, before further flight, rework the bushing P/N 28.01.403-040.10 in accordance with Dornier Service Bulletin No. 001-1403, dated 12 May 1969 or an FAA-approved equivalent.

(c) If the displacement of rubber grommet eye on the bushing is found to be less than 0.10 inches, within the next 100 hours time in service after the effective date of this AD, unless already accomplished, rework the bushing P/N 28.01.403-040.10 in accordance with Dornier Service Bulletin No. 001-1403, dated 12 May 1969 or an FAA-approved equivalent.

This amendment becomes effective September 15, 1969.

FOOTER:

Source: Official FAA Source ↗

Retrieved: Apr 8, 2026

Rights: U.S. Government Public Domain

This site is not affiliated with or endorsed by the FAA. Always verify with official sources.