AD 62-09-05

final rule

Airworthiness Directives; VICKERS Models 744, 745D, and 810 Series Airplanes

AD Number
62-09-05
Status
final_rule
Effective Date
Product Category
aircraft
Docket
Unknown
FR Citation
This information is not available.
Technical illustration of an aircraft landing gear and wheel assembly
Problem area Landing gear

Applicability

TypeManufacturerModelDetails
aircraft Vickers-Armstrongs (Aircraft Limited) Viscount 744 Airworthiness Directives; VICKERS Models 744, 745D, and 810 Series Airplanes
aircraft Vickers-Armstrongs (Aircraft Limited) Viscount 745D Airworthiness Directives; VICKERS Models 744, 745D, and 810 Series Airplanes
aircraft Vickers-Armstrongs (Aircraft Limited) Viscount 810 Airworthiness Directives; VICKERS Models 744, 745D, and 810 Series Airplanes

Unsafe Condition

Landing gear cross tube end fitting failures due to cracks in the 1/4-inch radius between the bearing journal and the tapered portion.

AI-generated summary from the source AD text. Verify against the official source before acting.

Required Actions

Inspect end fittings for cracks using PTL 234 (Models 744/745D) or PTL 100 (Model 810). Replace cracked fittings at Station 96 before further flight; Station 131 fittings may be reused if they meet PTL Issue 5 limitations and rework. Mark reworked fittings with 'R'.

AI-generated summary from the source AD text. Verify against the official source before acting.

Compliance Time

Compliance required as indicated in the AD, with inspection intervals based on accumulated landings: 500, 1,000, or 3,000 landings depending on prior usage.

AI-generated summary from the source AD text. Verify against the official source before acting.

Affected Aircraft

Vickers-Armstrongs (Aircraft Limited) Viscount Models 744, 745D, and 810 Series Airplanes.

AI-generated summary from the source AD text. Verify against the official source before acting.

Federal Register Abstract

Landing Gear Tube End Fittings

Applicability Source Text

Show captured applicability text from the source AD
AD Final Rules - DRS_62-09-05.html
Copy URL
Print/Save as PDF
Document Versions
 Feedback
Details
AD Number:
62-09-05
Document Type:
AD Final Rules
Docket Number:
Unknown
Subject Heading:
Airworthiness Directives; VICKERS Models 744, 745D, and 810 Series Airplanes
Subject:
Landing Gear Tube End Fittings
Status:
Current
Citation:
This information is not available.
Citation Publish Date:
Effective Date:
05/10/1962
Make:
Vickers-Armstrongs (Aircraft Limited)
Model:
Viscount 744 | Viscount 745D | Viscount 810
Product Type:
Aircraft
Product Subtype:
Large Airplane
Affected AD:
Superseded AD:
Affected By:
Superseded By:
Service/Office:
Office of Primary Responsibility:
CFR Part Reference:
Part 39
Comments:
AIRWORTHINESS DIRECTIVES FINAL RULES: 62-09-05
CITATION:   This information is not available.

PAGE NUMBER:  

DOCKET NUMBER:   Unknown

AMENDMENT:  

AD NUMBER:   62-09-05

SUBJECT HEADING:   Airworthiness Directives; VICKERS Models 744, 745D, and 810 Series Airplanes

ACTION:  

SUMMARY:  

DATES:   Effective May 10, 1962.

ADDRESSES:  

FOR FURTHER INFORMATION CONTACT:  

SUPPLEMENTARY INFORMATION:  

REGULATORY TEXT:  
62-09-05 VICKERS: Amdt. 416 part 507 Federal Register April 10, 1962. Applies to Viscount Models 744, 745D, and 810 Series Airplanes.

Compliance required as indicated.

As a result of landing gear cross tube end fitting failures, the following is required:

(a) (1) End fittings which have accumulated 11,000 or more landings as of the effective date of this AD, shall be inspected in accordance with (b) within the next 500 landings, and thereafter within each 3,000 landings.

(2) End fittings which have accumulated between 10,000 and 11,000 landings as of the effective date of this AD shall be inspected in accordance with (b) within the next 1,000 landings, or upon the accumulation of 11,500 landings, whichever occurs first, and thereafter within each 3,000 landings.

(3) End fittings which have accumulated less than 10,000 landings as of the effective date of this AD shall be inspected in accordance with (b) upon the accumulation of 11,500 landings and within each 3,000 landings thereafter.

NOTE: It will be necessary for operators to maintain a record of landings in order to ascertain compliance with this AD. If past records are unavailable, the number of landings prior to this AD may be estimated.

(b) Inspect the fittings listed below for cracks in accordance with PTL 234 (for Models 744 and 745D) or PTL 100 (for Model 810) or FAA-approved equivalent.

Model 744 & 745D - Fitting: End fitting for single piece tube, Station 96 - P/N 72450-35

Model 744 & 745D - Fitting: End fitting for single piece tube, Station 131 - P/N 72450- 37 or 72450-175

Model 810 - Fitting: End fitting for single piece tube, Station 96 - P/N 72450-35

Model 810 - End fitting for single piece tube, Station 131, P/N 81050-35

(c) Fittings with cracks in the 1/4-inch radius between the bearing journal and the tapered portion shall be replaced prior to further flight, except that those at Station 131 may be reused if they meet the limitations of the applicable PTL Issue 5 dated June 1, 1965, and are reworked as specified in the applicable PTL. (Fittings at Station 96 are of different design and cannot be reused should similar defects be found.)

(d) Rework fittings having minor surface cracks in the attachment flanges and in the bearing journals in accordance with the provisions of the PTL's.

(e) Mark all reworked fittings with the letter "R" on the flange circumference.

(f) Upon request of the operator, an FAA maintenance inspector, subject to prior approval of the Chief, Aircraft Certification Staff, European Region, may adjust the repetitive inspection intervals specified in this AD to permit compliance at an established inspection period of the operator if the request contains substantiating data to justify the increase for such operator.

(British Aircraft Corporation (Operating) Ltd. Preliminary Technical Leaflets No. 234 Issue 5 or later ARB-approved issue of 700 Series, (for 744 and 745D aircraft), No. 100 Issue 5 or later ARB-approved issue (for 810 Series aircraft) cover this subject.

This directive effective May 10, 1962.

Revised January 15, 1963.

Revised March 5, 1966.

FOOTER:

Document Text

Show stored source text (verify against official source)
AD Final Rules - DRS_62-09-05.html
Copy URL
Print/Save as PDF
Document Versions
 Feedback
Details
AD Number:
62-09-05
Document Type:
AD Final Rules
Docket Number:
Unknown
Subject Heading:
Airworthiness Directives; VICKERS Models 744, 745D, and 810 Series Airplanes
Subject:
Landing Gear Tube End Fittings
Status:
Current
Citation:
This information is not available.
Citation Publish Date:
Effective Date:
05/10/1962
Make:
Vickers-Armstrongs (Aircraft Limited)
Model:
Viscount 744 | Viscount 745D | Viscount 810
Product Type:
Aircraft
Product Subtype:
Large Airplane
Affected AD:
Superseded AD:
Affected By:
Superseded By:
Service/Office:
Office of Primary Responsibility:
CFR Part Reference:
Part 39
Comments:
AIRWORTHINESS DIRECTIVES FINAL RULES: 62-09-05
CITATION:   This information is not available.

PAGE NUMBER:  

DOCKET NUMBER:   Unknown

AMENDMENT:  

AD NUMBER:   62-09-05

SUBJECT HEADING:   Airworthiness Directives; VICKERS Models 744, 745D, and 810 Series Airplanes

ACTION:  

SUMMARY:  

DATES:   Effective May 10, 1962.

ADDRESSES:  

FOR FURTHER INFORMATION CONTACT:  

SUPPLEMENTARY INFORMATION:  

REGULATORY TEXT:  
62-09-05 VICKERS: Amdt. 416 part 507 Federal Register April 10, 1962. Applies to Viscount Models 744, 745D, and 810 Series Airplanes.

Compliance required as indicated.

As a result of landing gear cross tube end fitting failures, the following is required:

(a) (1) End fittings which have accumulated 11,000 or more landings as of the effective date of this AD, shall be inspected in accordance with (b) within the next 500 landings, and thereafter within each 3,000 landings.

(2) End fittings which have accumulated between 10,000 and 11,000 landings as of the effective date of this AD shall be inspected in accordance with (b) within the next 1,000 landings, or upon the accumulation of 11,500 landings, whichever occurs first, and thereafter within each 3,000 landings.

(3) End fittings which have accumulated less than 10,000 landings as of the effective date of this AD shall be inspected in accordance with (b) upon the accumulation of 11,500 landings and within each 3,000 landings thereafter.

NOTE: It will be necessary for operators to maintain a record of landings in order to ascertain compliance with this AD. If past records are unavailable, the number of landings prior to this AD may be estimated.

(b) Inspect the fittings listed below for cracks in accordance with PTL 234 (for Models 744 and 745D) or PTL 100 (for Model 810) or FAA-approved equivalent.

Model 744 & 745D - Fitting: End fitting for single piece tube, Station 96 - P/N 72450-35

Model 744 & 745D - Fitting: End fitting for single piece tube, Station 131 - P/N 72450- 37 or 72450-175

Model 810 - Fitting: End fitting for single piece tube, Station 96 - P/N 72450-35

Model 810 - End fitting for single piece tube, Station 131, P/N 81050-35

(c) Fittings with cracks in the 1/4-inch radius between the bearing journal and the tapered portion shall be replaced prior to further flight, except that those at Station 131 may be reused if they meet the limitations of the applicable PTL Issue 5 dated June 1, 1965, and are reworked as specified in the applicable PTL. (Fittings at Station 96 are of different design and cannot be reused should similar defects be found.)

(d) Rework fittings having minor surface cracks in the attachment flanges and in the bearing journals in accordance with the provisions of the PTL's.

(e) Mark all reworked fittings with the letter "R" on the flange circumference.

(f) Upon request of the operator, an FAA maintenance inspector, subject to prior approval of the Chief, Aircraft Certification Staff, European Region, may adjust the repetitive inspection intervals specified in this AD to permit compliance at an established inspection period of the operator if the request contains substantiating data to justify the increase for such operator.

(British Aircraft Corporation (Operating) Ltd. Preliminary Technical Leaflets No. 234 Issue 5 or later ARB-approved issue of 700 Series, (for 744 and 745D aircraft), No. 100 Issue 5 or later ARB-approved issue (for 810 Series aircraft) cover this subject.

This directive effective May 10, 1962.

Revised January 15, 1963.

Revised March 5, 1966.

FOOTER:

Source: Official FAA Source ↗

Retrieved: Apr 8, 2026

Rights: U.S. Government Public Domain

This site is not affiliated with or endorsed by the FAA. Always verify with official sources.