AD 62-06-03

final rule
Data completeness: 60%

Airworthiness Directives; Hiller Models UH-12D and UH-12E Helicopters

AD Number
62-06-03
Status
final_rule
Effective Date
Product Category
aircraft
Docket
Unknown
FR Citation
This information is not available.

Applicability

TypeManufacturerModelDetails
aircraft Hiller Aviation | Siam Hiller Holdings, Inc. UH-12D Airworthiness Directives; Hiller Models UH-12D and UH-12E Helicopters
aircraft Hiller Aviation | Siam Hiller Holdings, Inc. UH-12E Airworthiness Directives; Hiller Models UH-12D and UH-12E Helicopters

Unsafe Condition

Overheating or abnormal wear of the transmission planetary system components and inadequate oil warmup and shutdown procedures leading to potential transmission failure.

AI-generated summary from the source AD text. Verify against the official source before acting.

Required Actions

Install cockpit placards for oil warmup and temperature restriction, inspect and modify transmission lubrication system with specified parts, and replace worn components. Conduct inspections every 25 hours time-in-service and complete major modification within 100 hours.

AI-generated summary from the source AD text. Verify against the official source before acting.

Compliance Time

Within specified timeframes: 10 hours time-in-service for initial inspections and placards, every 25 hours thereafter for inspections, and within 100 hours for transmission modification. Effective upon Federal Register publication except those notified by telegram.

AI-generated summary from the source AD text. Verify against the official source before acting.

Affected Aircraft

Hiller Models UH-12D and UH-12E Serial Numbers 942, 954, 2001 through 2198 inclusive.

AI-generated summary from the source AD text. Verify against the official source before acting.

Source: Official FAA Source ↗

Retrieved: Apr 8, 2026

Rights: U.S. Government Public Domain

This site is not affiliated with or endorsed by the FAA. Always verify with official sources.