AD 61-22-06

final rule

LOCKHEED Model PV-1, B-34, and 18 Series Aircraft

AD Number
61-22-06
Status
final_rule
Effective Date
Product Category
aircraft
Docket
Unknown
FR Citation
This information is not available.
Technical illustration of an aircraft flight control surface and actuator
Problem area Flight controls

Applicability

TypeManufacturerModelDetails
aircraft Air Trading Corporation | Lockheed Aircraft Corporation Army B-34 LOCKHEED Model PV-1, B-34, and 18 Series Aircraft
aircraft Air Trading Corporation | Lockheed Aircraft Corporation Navy PV-1 LOCKHEED Model PV-1, B-34, and 18 Series Aircraft
aircraft Air Trading Corporation | Lockheed Aircraft Corporation 18 LOCKHEED Model PV-1, B-34, and 18 Series Aircraft

Unsafe Condition

Cracks in the elevator control mast assembly castings P/N 11467 or 56045 in the attach bolt lugs, which could lead to failure of the elevator control system.

AI-generated summary from the source AD text. Verify against the official source before acting.

Required Actions

Inspect elevator control mast assembly castings for cracks using dye penetrant methods; replace cracked castings. Install AN 5-16A bolts with lockplate, torque bolts to specified ranges, and install shim with specific dimensions between castings.

AI-generated summary from the source AD text. Verify against the official source before acting.

Compliance Time

within the next 100 hours' time in service after effective date

AI-generated summary from the source AD text. Verify against the official source before acting.

Affected Aircraft

Lockheed Model PV-1, B-34, and 18 Series Aircraft with elevator control mast assembly castings P/N 11467 or 56045

AI-generated summary from the source AD text. Verify against the official source before acting.

Federal Register Abstract

Elevator Control Mast Castings

Applicability Source Text

Show captured applicability text from the source AD
AD Final Rules - DRS_61-22-06.html
Copy URL
Print/Save as PDF
Document Versions
 Feedback
Details
AD Number:
61-22-06
Document Type:
AD Final Rules
Docket Number:
Unknown
Subject Heading:
LOCKHEED Model PV-1, B-34, and 18 Series Aircraft
Subject:
Elevator Control Mast Castings
Status:
Current
Citation:
This information is not available.
Citation Publish Date:
Effective Date:
11/21/1961
Make:
Air Trading Corporation | Lockheed Aircraft Corporation
Model:
Army B-34 | Navy PV-1 | 18
Product Type:
Aircraft
Product Subtype:
Large Airplane
Affected AD:
Superseded AD:
Affected By:
Superseded By:
Service/Office:
Office of Primary Responsibility:
CFR Part Reference:
Part 39
Comments:
AIRWORTHINESS DIRECTIVES FINAL RULES: 61-22-06
CITATION:   This information is not available.

PAGE NUMBER:  

DOCKET NUMBER:   Unknown

AMENDMENT:  

AD NUMBER:   61-22-06

SUBJECT HEADING:   LOCKHEED Model PV-1, B-34, and 18 Series Aircraft

ACTION:  

SUMMARY:  

DATES:   Effective November 21, 1961.

ADDRESSES:  

FOR FURTHER INFORMATION CONTACT:  

SUPPLEMENTARY INFORMATION:  

REGULATORY TEXT:  
61-22-06 LOCKHEED: Amdt. 351 Part 507 Federal Register October 21, 1961. Applies to All PV-1, B-34, and 18 Series Aircraft Having Elevator Control Mast Assembly Castings P/N 11467 or 56045.

Compliance required within the next 100 hours' time in service after effective date.

As a result of reported cracks in the elevator control mast assembly castings, the following inspections and installation procedures are required unless already accomplished:

(a) Inspect the elevator control mast assembly casting prior to removal, for mating marks to insure correct assembly. If none exist, determine the proper position of the cap on the mast and mark the assembly with a paint stripe or equivalent to insure future correct assembly of parts.

(b) Remove the elevator control mast assembly casting and inspect both the control mast and the cap castings for cracks in the attach bolt lugs using dye penetrant methods or equivalent. If any cracks are found, the casting must be replaced prior to further flight.

(c) Install the four AN 5-16A bolts in the casting in place on the aircraft, with the lockplate between the cast cap and the casting on the aft side, and with the mating marks matched. Torque the two bolts which go through the lockplate to 50-70 inch-pounds, then the other two bolts to the same range of torque values. Measure the gap between the forward side of the castings. Fabricate an aluminum alloy shim, +0.002 to +0.005-inch greater than the measured gap. Remove the forward bolts, install the shim, replace the bolts, and torque all bolts to 100-140 inch-pounds. Ensure that the shim does not contact the surrounding structure.

This directive effective November 21, 1961.

FOOTER:

Document Text

Show stored source text (verify against official source)
AD Final Rules - DRS_61-22-06.html
Copy URL
Print/Save as PDF
Document Versions
 Feedback
Details
AD Number:
61-22-06
Document Type:
AD Final Rules
Docket Number:
Unknown
Subject Heading:
LOCKHEED Model PV-1, B-34, and 18 Series Aircraft
Subject:
Elevator Control Mast Castings
Status:
Current
Citation:
This information is not available.
Citation Publish Date:
Effective Date:
11/21/1961
Make:
Air Trading Corporation | Lockheed Aircraft Corporation
Model:
Army B-34 | Navy PV-1 | 18
Product Type:
Aircraft
Product Subtype:
Large Airplane
Affected AD:
Superseded AD:
Affected By:
Superseded By:
Service/Office:
Office of Primary Responsibility:
CFR Part Reference:
Part 39
Comments:
AIRWORTHINESS DIRECTIVES FINAL RULES: 61-22-06
CITATION:   This information is not available.

PAGE NUMBER:  

DOCKET NUMBER:   Unknown

AMENDMENT:  

AD NUMBER:   61-22-06

SUBJECT HEADING:   LOCKHEED Model PV-1, B-34, and 18 Series Aircraft

ACTION:  

SUMMARY:  

DATES:   Effective November 21, 1961.

ADDRESSES:  

FOR FURTHER INFORMATION CONTACT:  

SUPPLEMENTARY INFORMATION:  

REGULATORY TEXT:  
61-22-06 LOCKHEED: Amdt. 351 Part 507 Federal Register October 21, 1961. Applies to All PV-1, B-34, and 18 Series Aircraft Having Elevator Control Mast Assembly Castings P/N 11467 or 56045.

Compliance required within the next 100 hours' time in service after effective date.

As a result of reported cracks in the elevator control mast assembly castings, the following inspections and installation procedures are required unless already accomplished:

(a) Inspect the elevator control mast assembly casting prior to removal, for mating marks to insure correct assembly. If none exist, determine the proper position of the cap on the mast and mark the assembly with a paint stripe or equivalent to insure future correct assembly of parts.

(b) Remove the elevator control mast assembly casting and inspect both the control mast and the cap castings for cracks in the attach bolt lugs using dye penetrant methods or equivalent. If any cracks are found, the casting must be replaced prior to further flight.

(c) Install the four AN 5-16A bolts in the casting in place on the aircraft, with the lockplate between the cast cap and the casting on the aft side, and with the mating marks matched. Torque the two bolts which go through the lockplate to 50-70 inch-pounds, then the other two bolts to the same range of torque values. Measure the gap between the forward side of the castings. Fabricate an aluminum alloy shim, +0.002 to +0.005-inch greater than the measured gap. Remove the forward bolts, install the shim, replace the bolts, and torque all bolts to 100-140 inch-pounds. Ensure that the shim does not contact the surrounding structure.

This directive effective November 21, 1961.

FOOTER:

Source: Official FAA Source ↗

Retrieved: Apr 8, 2026

Rights: U.S. Government Public Domain

This site is not affiliated with or endorsed by the FAA. Always verify with official sources.

View Official Source ↗